FOREST HYDROLOGY Sample Clauses

FOREST HYDROLOGY. It is estimated there exists approximately 1.2 million acres of merchantable forest land in the Okanagan Basin in Canada. Only about 300,000 acres are in the zone north of Penticton above 4,000 feet which is the area from which the major portion of the runoff occurs. In 1971 some 10,000 acres of merchantable timber were harvested in the Basin while an additional 1,000 acres was lost to wild fires. This represents 1/120 year rotation for the Basin. Water yield increases accrusing from forest harvesting within the 300,000 acres north of Penticton have been estimated at between 3.31% and 4.20%. These increases would only be realized within the area harvested and would likely be consumed in water deficits sites at lower elevations. This includes correction for sequential regrowth effects on increasing evapotranspiration. Additional increases for those areas lost to wild fires are estimated between 1.24% and 1.55% annually. By adjusting the computed percentage water increases in the areas where forest harvesting and fires are taking place to the whole Basin water yield increases are only 0.50% to 0.64% for the former and 0.19% to 0.23% for the latter. These computed annual increases are not cumulative due to the effect of regrowth on evapotranspiration consumption. In summary, it can be stated that:
AutoNDA by SimpleDocs

Related to FOREST HYDROLOGY

  • Forestry (a) An employee occupying an FLSA-exempt position shall have their overtime pay rate changed from one (1) hour of time off for every hour of authorized overtime worked that exceeds eight (8) or ten (10) hours in a day, whichever is applicable, or forty (40) hours in a workweek to time and one-half (1½) for any authorized overtime worked that exceeds eight (8) or ten (10) hours in a day, whichever is applicable, or forty (40) hours in a workweek when all of the following conditions are met:

  • Slope Portions of an accessible route with running slopes steeper than 1:20 are ramps and shall comply with 4.8. The cross slope of an accessible route shall not be steeper than 1:48  See Figure 1 for required compliance  Near Unit #612: o grind, relevel or repour concrete curb ramp to 8.33% grade or less on slope

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • WATERBEDS The Tenant: (check one) ☐ - Shall have the right to use a waterbed on the Premises. ☐ - Shall not have the right to use a waterbed on the Premises.

  • Fertilizer Purchaser shall evenly spread the fertilizer listed below on all exposed soil inside the grubbing limits at a rate of 200 pounds per acre of exposed soil. Fertilizer must meet the following specifications: Chemical Component % by Weight Sulphur 3 Inerts 49 SECTION 9 – POST-HAUL ROAD WORK 9-3 CULVERT MATERIAL REMOVED FROM STATE LAND Culverts removed from roads become the property of the Purchaser and must be removed from state land.

  • PROJECT FINANCIAL RESOURCES i) Local In-kind Contributions $0 ii) Local Public Revenues $0 iii) Local Private Revenues iv) Other Public Revenues: $0 - ODOT/FHWA $0 - OEPA $2,675,745 - OWDA $0 - CDBG $0 - Other $0 SUBTOTAL $2,675,745 v) OPWC Funds: - Loan $299,000 SUBTOTAL $299,000 TOTAL FINANCIAL RESOURCES $2,974,745

  • PIONEERING Pioneering may not extend past construction that will be completed during the current construction season. Pioneering may not extend more than 500 feet beyond completed construction unless approved in writing by the Contract Administrator. In addition, the following actions must be taken as pioneering progresses:  Drainage must be provided on all uncompleted construction.  Road pioneering operations may not undercut the final cut slope or restrict drainage.  Culverts at live stream crossings must be installed during pioneering operations prior to embankment.

  • Water Resources Four (4) Union Stewards unless the unit falls below sixty (60) employees and then not more than two (2) Union Stewards.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Surgery Services and Mastectomy Related Treatment This plan provides benefits for mastectomy surgery and mastectomy-related services in accordance with the Women’s Health and Cancer Rights Act of 1998 and Rhode Island General Law 27-20-29 et seq. For the member receiving mastectomy-related benefits, coverage will be provided in a manner determined in consultation with the attending physician, physician assistant, or an advance practice registered nurse and the patient, for: • all stages of reconstruction of the breast on which the mastectomy was performed; • surgery and reconstruction of the other breast to produce a symmetrical appearance; • prostheses; and • treatment of physical complications at all stages of the mastectomy, including lymphedema. See the Summary of Medical Benefits for the amount you pay.

Time is Money Join Law Insider Premium to draft better contracts faster.