Exterior Wall Construction Sample Clauses

Exterior Wall Construction a. Glazing – minimum of 50% Surface Area consisting of 1” insulated, thermally broken, low-E glazing system Glazing-50%, EIFS -50%, stone- 0%
AutoNDA by SimpleDocs
Exterior Wall Construction a. Exterior finishes are to be similar (or equal) in quantity and scope to those presented to Skullcandy in the Landlord June 9, 2014 conceptual base building drawings (the “Drawings”). This includes a trellis type canopy outside a proposed breakroom.
Exterior Wall Construction. A. Exterior walls will be 9-1/2” thick insulated reinforced concrete tilt-up panels. Exterior of panels will be painted with “Texcote” manufactured by Textured Coatings of America, or equal, and color selection by Tenant. Concrete wall panels shall be insulated with foil coated ridged insulation board (2.0 inch) to provide R= 13. 02/25: Shell Specification Add #6: Upgrade to sandwich tilt panels in lieu of panel with exposed insulation. Credit for exposed insulation will be included as an offset in cost of upgrade.
Exterior Wall Construction. The wastewater tank was made of steel-reinforced cast-in-place concrete, which is an industry standard for tanks of this size. The tank subcontractor said that the steel in the concrete is a large safety concern that can cut a person in half if it comes loose and someone is in the way. Therefore they take great care to keep people out of the way and safe while working around the material. Roof Structure To install the roof of the tank, workers constructed a false work of ribs, shoring, and plywood decking before pouring a thin layer of reinforced concrete. The shape of this concrete shell was spherical with a rise one tenth of the tank’s diameter. The design of the roof and false work eliminated the risk of workers being struck, caught in, or crushed by a collapsing structure or material. Worker safety training was also used as an administrative control to help prevent the fall hazard for workers on top of the tank.
Exterior Wall Construction. A l l perimeter walls facing streets shall h ave a minimum thickness of 12 " and s h a l l be constructed of block and approved veneer. A l l perimeter walls s h a l l be non- load bearing w i t h columns b u i l t i n f l u s h for roof support.

Related to Exterior Wall Construction

  • Initial Construction Attached hereto are plans showing proposed modifications to Premises. Within 20 days of execution of the Lease, Landlord will prepare construction drawings and specifications for such modifications containing such details as dimensions, partition plans, dimensioned electrical and telephone outlet plans, modified reflected ceiling plans, room finish schedule, including wall, carpet, floor tile, and VCT colors, and other necessary construction details and specifications for the completion of such work, all in a manner reasonably acceptable to Tenant. Space planning, construction drawings, and specifications shall be provided by Landlord to Tenant a no cost to Tenant. All construction of modifications to Tenant's Premises will be accomplished by Tenant's contractor, which contractor shall furnish to Landlord evidence of insurance as follows: General Liability and Property Damage - $2,000,000 Aggregate, $2,000,000 per Occurrence; Workmens Compensation, and an Owners and Contractors Protective Liability Policy in the amount of $1,000,000 naming the owner and The Gutixxxxx Xxxpany as insureds. In addition, in Tenant's construction contract, Tenant shall insure that the contract holds Landlord and The Gutixxxxx Xxxpany harmless, and that Landlord and The Gutixxxxx Xxxpany are additional named insureds on all of Tenant's insurance policies. It shall be Tenant's contractor's responsibility to obtain the building permit for said modifications to Premises. It shall be Tenant's responsibility to insure that all Tenant's general contractors subcontractors and materialmen are paid in full, and if a lien is placed upon the Building by any such contractor, subcontractor, materialmen, or other, to promptly remove such lien or provide a bond reasonably satisfactory to Landlord and Landlord's mortgagee to insure that such lien will be paid in full while contesting such lien. Landlord shall permit Tenant and Tenant's contractor access for construction of modifications to Tenant's premises promptly after execution hereof. All changes and additions shall be part of the Building, except such items as by writing at the time of approval the parties agree either shall be removed by Tenant on termination of this Lease, or shall be removed or left at Tenant's election.

  • General Construction 20.2.1. Binding Nature.............................................. 20.2.2. Entire Agreement............................................ 20.2.3. Governing Law............................................... 20.2.4. Indulgences Not Waivers..................................... 20.2.5. Titles Not to Affect Interpretation......................... 20.2.6.

  • Construction of the Tenant Improvements Landlord shall construct the Tenant Improvements in accordance with this exhibit and the construction contract to be executed by Landlord and its contractor(s). The construction contract for constructing the Tenant Improvements and the contractor(s) to perform the work shall be approved and/or selected, as the case may be, by Landlord at its sole and absolute discretion without the consent of Tenant.

  • Construction of Tenant Improvements After the Landlord and Ground Lessor (in accordance with Paragraph 12 hereof) approve Tenant’s Plans and Tenant receives any necessary building permits, Tenant shall administer and diligently prosecute the construction of Tenant Improvements in accordance with Tenant’s Plans, in compliance with applicable Laws, and using building standard material, subject to Landlord’s right, at its election, to itself construct the Restroom Improvements. All Tenant Improvements (other than, if applicable, the Restroom Improvements) shall be constructed by Tenant’s Contractor (and/or its subcontractors), and Tenant shall be responsible for project management with respect to construction of the Tenant Improvements. During construction of the Tenant Improvements, Tenant and its contractors and subcontractors (i) shall not interfere with the access to, use of, or business conducted within any other portions of the Project by other tenants or occupants, (ii) shall use diligent efforts to coordinate the timing of work, deliveries and other construction matters with tenants or occupants of the Project that could be adversely impacted by such work, deliveries and construction matters, including, without limitation, by scheduling work CERTAIN CONFIDENTIAL PORTIONS OF THIS EXHIBIT WERE OMITTED AND REPLACED WITH “[***]”. A COMPLETE VERSION OF THIS EXHIBIT HAS BEEN FILED SEPARATELY WITH THE SECRETARY OF THE SECURITIES AND EXCHANGE COMMISSION PURSUANT TO AN APPLICATION REQUESTING CONFIDENTIAL TREATMENT UNDER RULE 406 OF THE SECURITIES ACT OF 1933. that would create noise, vibrations, dust or other similar annoyances to other tenants or occupants of the Project outside normal business hours, notwithstanding any additional cost (for overtime or otherwise) that Tenant may incur, (iii) shall clean and secure construction and staging areas daily, (iv) shall stage all construction and store all construction materials and equipment in a location designated by Landlord (in Landlord’s sole discretion) on the Project, and (v) shall otherwise abide by all rules and requirements established or imposed by Landlord relating to the performance of the Tenant Improvements, including rules relating to any required shutdown of utilities (including life-safety systems), storage of materials, and coordination of work with other tenant’s or occupant’s contractors. Tenant shall not be charged any construction management fee for Landlord’s review of Tenant’s Plans or any oversight of the construction of the Tenant Improvements.

  • Neutral Construction The parties to this Agreement agree that this Agreement was negotiated fairly between them at arm's length and that the final terms of this Agreement are the product of the parties' negotiations. Each party represents and warrants that it has sought and received legal counsel of its own choosing with regard to the contents of this Agreement and the rights and obligations affected hereby. The parties agree that this Agreement shall be deemed to have been jointly and equally drafting by them, and that the provisions of this Agreement therefore should not be construed against a party or parties on the grounds that such party or parties drafted or was more responsible for the drafting of any such provision(s).

  • Construction of Improvements (A) Lessee warrants and agrees that the Building will be constructed on the Leased Premises, and all other improvements to the land, including the parking lot, approaches, and service areas, will be constructed in all material respects by Lessee substantially in accordance with the plot, plans, and specifications heretofore submitted to Lessor.

  • Specific Shall Not Limit General; Construction No specific provision contained in this Note shall limit or modify any more general provision contained herein. This Note shall be deemed to be jointly drafted by the Company and the Holder and shall not be construed against any person as the drafter hereof.

  • Construction of the Improvements Once development of the Property has commenced, the construction of the Improvements shall be pursued with due diligence and continuity, in a good and workmanlike manner, and in accordance with sound building and engineering practices, all applicable governmental requirements, and the Development Plan. Borrower shall not permit cessation of work for a period in excess of thirty (30) days during any period of time during which development on the Property is scheduled to be performed without the prior written consent of Lender, which may be given or withheld in Lender’s sole discretion, except for delays due to strikes, riots, acts of God, war, unavailability of labor or materials, governmental laws, regulations or restrictions and Borrower shall promptly notify Lender of any such delays; provided, however, that in no event shall work cease for a period in excess of sixty (60) days regardless of the cause. Borrower shall cause all materials supplied for, or intended to be utilized in, the development of any part of the Property, but not affixed to or incorporated into the Property, to be stored on the Property or at such other location as may be approved by Lender in writing, with adequate safeguards, as required by Lender, to prevent loss, theft, damage, or commingling with other materials or projects.

  • Construction of Project 11.1.1 Developer agrees to cause the Project to be developed, constructed, and installed in accordance with the terms hereof and the Construction Provisions set forth in Exhibit D, including those things reasonably inferred from the Contract Documents as being within the scope of the Project and necessary to produce the stated result even though no mention is made in the Contract Documents.