Energy Transfer Station Space Requirements Sample Clauses

Energy Transfer Station Space Requirements. The DEU designs and installs the necessary pipes, heat exchangers, associated controls, and energy meters to interface with the building heating systems. This equipment, referred to as the Energy Transfer Station (ETS), is owned and operated by the DEU and located inside the customer’s building. ETS’s are preferably located in the basement or parkade, and typically occupy approximately 20% of the space of a conventional boiler plant. The ETS can be located within the same mechanical room as the building heating and domestic hot water system equipment. See FIGURE 1 below as an example of a typical ETS located at an exterior wall near the DPS mains in the street. See Section 4 on page 11 for more details on mechanical room requirements. The DEU distribution pipelines are buried in the roads throughout UTown. Branch lines from the DEU distribution pipelines connect to each building’s ETS. FIGURE 1: TYPICAL ETS INSTALLATION IN BUILDING BASEMENT
AutoNDA by SimpleDocs

Related to Energy Transfer Station Space Requirements

  • Space Requirements The Construction Administrator will conduct a review of the adequacy of space allotments for maintenance of mechanical, telephone, and fire protection equipment.

  • ON SITE REQUIREMENTS While on Purchaser’s premises, Contractor, its agents, employees, or subcontractors shall comply, in all respects, with Purchaser’s physical, fire, access, safety, and other security requirements.

  • CONTRACT COMPLIANCE REQUIREMENT The HUB requirement on this Contract is 0%. The student engagement requirement of this Contract is 0 hours. The Career Education requirement for this Contract is 0 hours. Failure to achieve these requirements may result in the application of some or all of the sanctions set forth in Administrative Policy 3.10, which is hereby incorporated by reference.

  • PRUDENTIAL REQUIREMENTS 12.1 Retailer will satisfy prudential requirements: If required by a notice from the Distributor, the Retailer will comply with either one of the following prudential requirements within 10 Working Days of receipt of the Distributor's notice:

  • Software Requirements 7 Developer shall prepare the Project Schedule using Oracle’s Primavera P6.

  • Schedule Requirements The Contractor shall submit an electronic and a paper copy of the initial Work Progress Schedule reflecting accurate and reliable representations of the planned progress of the Work, the Work to date if any, and of the Contractor’s actual plans for its completion. The Contractor shall organize and provide adequate detail so the Work Progress Schedule is capable of measuring and forecasting the effect of delaying events on completed and uncompleted activities.

  • DRUG-FREE WORKPLACE REQUIREMENTS Contractor will comply with the requirements of the Drug-Free Workplace Act of 1990 and will provide a drug-free workplace by taking the following actions:

  • Time Requirements The Independent Contractor will not be required to follow or establish a regular or daily work schedule, but shall devote during the term of this Agreement the time, energy and skill as necessary to perform the services of this engagement and shall, periodically or at any time upon the request of the Company, submit information as to the amount of time worked and scope of work performed.

  • Quality Assurance Requirements There are no special Quality Assurance requirements under this Agreement.

  • CERTIFICATION REGARDING DRUG-FREE WORKPLACE REQUIREMENTS The undersigned (authorized official signing for the contracting organization) certifies that the contractor will, or will continue to, provide a drug-free workplace in accordance with 45 CFR Part 76 by: