DMMP Design Sample Clauses

DMMP Design a. Aquatic Habitat / Xxxxx Cell Design The proposed DMMP has incorporated aquatic habitat features into the design of some of the placement sites. These sites would use the new work dredging material beneficially to raise the bottom surface of each placement site to a suitable elevation, creating a bed platform that would be viable for aquatic habitat. These placement sites would typically involve designing a permanent or temporary containment feature, such as a levee or training dike, and placing material within the placement site.
AutoNDA by SimpleDocs

Related to DMMP Design

  • Program Design The County Human Resources Department will operate a Catastrophic Leave Bank which is designed to assist any County employee who has exhausted all paid accruals due to a serious or catastrophic illness, injury, or condition of the employee or family member. The program establishes and maintains a Countywide bank wherein any employee who wishes to contribute may authorize that a portion of his/her accrued vacation, compensatory time, holiday compensatory time or floating holiday be deducted from those account(s) and credited to the Catastrophic Leave Bank. Employees may donate hours either to a specific eligible employee or to the bank. Upon approval, credits from the Catastrophic Leave Bank may be transferred to a requesting employee's sick leave account so that employee may remain in paid status for a longer period of time, thus partially ameliorating the financial impact of the illness, injury, or condition. Catastrophic illness or injury is defined as a critical medical condition, a long-term major physical impairment or disability which manifests itself during employment.

  • Project Design Applicants must design a project that provides access to health services to enable eligible women and men experiencing health needs to secure and maintain safe and accessible quality screening and diagnostic services, comprehensive family planning, and/ or other women’s health services.

  • Study Design This includes a discussion of the evaluation design employed including research questions and hypotheses; type of study design; impacted populations and stakeholders; data sources; and data collection; analysis techniques, including controls or adjustments for differences in comparison groups, controls for other interventions in the State and any sensitivity analyses, and limitations of the study.

  • Schematic Design See Section 2, Part 1, Article 2.1.4, Paragraph 2.1.4.2.

  • Plan Design The flexible benefits plan is a cafeteria-style benefits program wherein the County makes a contribution toward the Flexible Benefits Plan for each eligible employee to be allocated during the employee's active employment. The County contribution is distributed by the employee among the menu of benefit options listed below, the specific details and administration of which are set forth in the plan brochures: "Core" Benefits: • Health insurance • County basic life and AD&D insurance Optional Benefits: • Dental insurance • Vision insurance • Supplemental life insurance • Supplemental accidental death and dismemberment insurance (AD&D) • Flexible spending accounts for pre-tax reimbursement of qualified medical and/or dependent day care expenses. Account credits must be used during the plan year in which they are earned for expenses incurred during the same plan year. • The plan may be modified upon written notice by the County. This plan includes for eligible employees pre-tax contributions for all monies paid toward health, dental, vision and/or voluntary AD&D plans.

  • ROADWAY DESIGN MISCELLANEOUS (ROADWAY) The Engineer shall provide the following services:

  • Final Design A.4.1. Provide OWNER with proposed final construction drawings and detailed opinions of probable total Project construction costs in writing for OWNER' s review, prior to completion of the final Contract Documents, so that any changes that may be necessary in accordance with Project' s budgetary schedule can be made prior to bid.

  • Development Plan document specifying the work program, schedule, and relevant investments required for the Development and the Production of a Discovery or set of Discoveries of Oil and Gas in the Contract Area, including its abandonment.

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • Schematic Design Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

Time is Money Join Law Insider Premium to draft better contracts faster.