Develop Maneuvering Basin Layouts Sample Clauses

Develop Maneuvering Basin Layouts. Develop up to two conceptual geometric layouts for the proposed maneuvering basin. Include general cross sections and calculate dredge volumes required for each option. Drawings will be set up in both exhibit and contract document formats. The intent is to produce drawings which can be used for regulatory purposes and then evolve into construction documents. Engineer will meet with and coordinate with Xxx Xxxxxx regarding layouts and ship maneuverability. It is anticipated that this coordination could streamline the process of coordinating and obtaining feedback regarding the concepts from the Aransas Corpus Christi Pilots in subsequent tasks.
AutoNDA by SimpleDocs
Develop Maneuvering Basin Layouts. Develop up to two revised conceptual geometric layouts for the proposed maneuvering basin. Include general cross sections and calculate dredge volumes required for each option. Drawings will be set up in both exhibit and contract document formats. The intent is to produce drawings which can be used for regulatory purposes also as the basis for development of construction documents.

Related to Develop Maneuvering Basin Layouts

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Development Area 10.4. The Development Area shall encompass all Deposits to be produced.

  • Built-up Area The built-up area for the Designated Apartment or any other Unit shall mean the Carpet Area of such Unit and Balcony area and 50% (fifty percent) of the area covered by those external walls which are common between such Unit/Balcony and any other Unit/Balcony and the area covered by all other external walls of the such Unit/Balcony.

  • Project Site The “Project Site” is the place where the Work is being carried on.

  • The Site The site of the Project Highway (the “Site”) shall comprise the site described in Schedule-A in respect of which the Right of Way shall be provided by the Authority to the Contractor. The Authority shall be responsible for:

  • Excavation If any excavation shall be made upon land adjacent to or under the Building, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter the Premises for the purpose of performing such work as said person shall deem necessary or desirable to preserve and protect the Building from injury or damage and to support the same by proper foundations, without any claim for damages or liability against Landlord and without reducing or otherwise affecting Tenant’s obligations under this Lease.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Vegetation No trees or other vegetation may be removed from the site without prior approval from the Town, except in accordance with Section 4 above and pursuant to the Annual Plan.

Time is Money Join Law Insider Premium to draft better contracts faster.