DESCRIPTION OF WORK STATEMENT. Performance Work Statement, Attachment 1 defines and provides the basic requirements of the general tasks to be performed under the CMMARS IDIQ contract. This contract may procure a broad range of CLS services within the scope of this contract. The tasks and detailed requirements for CLS services will be defined in the requirement documents for each individual task order. C-TXT-ECMRA REQUIRED ENTERPRISE-WIDE CONTRACTOR MANPOWER REPORTING APPLICATION (ECMRA) INFORMATION The contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. Contracted services, excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:
AutoNDA by SimpleDocs

Related to DESCRIPTION OF WORK STATEMENT

  • Description of Work (a) that has been omitted or

  • General Description of Work The work under this AGREEMENT shall consist of the above-described SERVICES as herein defined, and necessary to accomplish the completed work for this project. The CONSULTANT shall furnish all services, labor, and related equipment and, if applicable, sub-consultants and subcontractors necessary to conduct and complete the SERVICES as designated elsewhere in this AGREEMENT.

  • Statement of Work The Contractor shall provide the services and staff, and otherwise do all things necessary for or incidental to the performance of work, as set forth below:

  • Detailed Description of Services / Statement of Work Describe fully the services that Contractor will provide, or add and attach Exhibit B to this Agreement.

  • Task Description This task includes activities associated with permit-required monitoring conducted in accordance with the conditions specified by state or federal regulatory agencies. All monitoring tasks must be located within or adjacent to the Project area and follow the Department’s Regional Coastal Monitoring Program and FWC's marine turtle and shorebird monitoring programs. Guidance for monitoring of nearshore resources is available in the Department's Standard Operation Procedures For Nearshore Hardbottom Monitoring Of Beach Nourishment Projects. The Local Sponsor must submit work products directly to the appropriate state or federal regulatory agencies in accordance with permit conditions to be eligible for reimbursement under this task, unless otherwise directed.

  • Service Description The Parties will provide Common Channel Signaling (CCS) to one another via Signaling System 7 (SS7) network Interconnection, in accordance with prevailing industry standards. Use of a third party provider of SS7 trunks is permitted.

  • System Description The DLCS is a network consisting of devices which are remotely controlled over RF transmission equipment by the PowerCAMPTM Software or equivalent. CL&P shall have access to the PowerCAMP™ LMS (as defined below) via the web interface. The PowerCAMPTM LMS shall include the software and hardware necessary to manage the Control Devices installed at the End-use Equipment at Participating Facilities. The PowerCAMPTM LMS includes AER’s PowerCAMPTM Server and PowerCAMPTM Suite, networking equipment, and third party software. PowerCAMPTM LMS Hardware

  • Work Description T-804 Opening Roads - Removal of closure devices, cleaning ditches, removing berms, and blading the traveled-way T-811 Closing Roads - Entrance treatment for 150' cross-rip; debris block (slash, earth, berm, rocks, etc.) + seed + water bar T-811 Closing Roads - Water bar frequency per BMPs for remainder of road T-811 Closing Roads - Engineering Rep. or Construction Inspector must be notified prior to performing closeout NFSR Road No. Lane Width & Maintenance Level Mile Marker Begin End 76L Single Lane / Level 2 76 0.00 Ending 0.48

  • Project Description In two or three brief sentences, provide a concise description of your exhibition. Include the subject matter, type of objects to be included (paintings, sculpture, manuscripts, etc.), those responsible for organizing the exhibition, and catalogue author(s).

  • CORRECTION OF WORK 13.2.1 The Contractor shall be responsible for correcting all Work which the Architect has found to be defective or which fails to conform to the Contract Documents whether observed be- fore or after Substantial Completion and whether or not fabricated, installed or completed. The Contractor shall bear all costs of correcting such rejected Work, including compensation for the Architect's and the State’s additional services made necessary thereby. The Architect, upon a finding of defect or failure to conform, shall immediately notify the State and Contractor, in writing, of the defect. The Contractor shall begin correcting the defective or non-conforming Work within ten (10) days unless the State agrees to a Change Order which reflects the reduction in Contract Sum due to the value of diminishment of the defective or nonconforming Work.