Damage to Caltrans Highway Facilities Sample Clauses

Damage to Caltrans Highway Facilities. LESSEE will indemnify, defend, and hold harmless CALTRANS from any actual losses or damages of any kind or nature to I-15 or any other CALTRANS’ owned facility or property, to the extent proximately caused by any act, error, omission, or negligence by or through LESSEE or its employees, agents, contractors, or subcontractors in connection with LESSEE’S use of the PROPERTY, or any part thereof, for LESSEE’s construction, operation, or maintenance of the PRIVATE RAIL LINE, unless caused by CALTRANS’ sole or active negligence or willful misconduct.
AutoNDA by SimpleDocs

Related to Damage to Caltrans Highway Facilities

  • DAMAGE TO COUNTY FACILITIES, BUILDINGS OR GROUNDS 8.16.1 The Contractor shall repair, or cause to be repaired, at its own cost, any and all damage to County facilities, buildings, or grounds caused by the Contractor or employees or agents of the Contractor. Such repairs shall be made immediately after the Contractor has become aware of such damage, but in no event later than thirty (30) days after the occurrence.

  • DAMAGE TO FACILITIES The Student will promptly report damages and request necessary repairs, in accordance with established and published procedures. The Student is responsible for damages caused by the Student. Damages to shared or common areas not attributable to a responsible person are the joint responsibility of all persons sharing the space or area. UCF DHRL reserves the right to charge the Student for damages caused by the Student. Charges may include, but are not limited to, extraordinary pest control charges, repair of walls, furniture or fixtures, and damages to common areas. UCF DHRL also reserves the right to charge the Student for a portion of damages caused to spaces shared by the Student when the person responsible for damages to shared spaces cannot be identified.

  • Use of Interconnection Facilities by Third Parties 6551 Error! Hyperlink reference not valid.9.9.1 Purpose of Interconnection Facilities. 6551

  • Interconnection Customer’s Interconnection Facilities Construction The Interconnection Customer’s Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Participating TO and CAISO “as-built” drawings, information and documents for the Interconnection Customer’s Interconnection Facilities and the Electric Generating Unit(s), such as: a one-line diagram, a site plan showing the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities, plan and elevation drawings showing the layout of the Interconnection Customer’s Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the Interconnection Customer’s Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Electric Generating Units. The Interconnection Customer shall provide the Participating TO and the CAISO specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable. Any deviations from the relay settings, machine specifications, and other specifications originally submitted by the Interconnection Customer shall be assessed by the Participating TO and the CAISO pursuant to the appropriate provisions of this LGIA and the LGIP.

  • Verizon OSS Facilities Any gateways, interfaces, databases, facilities, equipment, software, or systems, used by Verizon to provide Verizon OSS Services to CBB.

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • Damage to Property Exhibitor is liable for any damage caused to building floors, walls or columns, or to standard booth equipment, or to other Exhibitor’s property. Exhibitor may not apply paint, lacquer, adhesives, or other coating to building columns and floors or to standard booth equipment.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner.

Time is Money Join Law Insider Premium to draft better contracts faster.