Certification of Load Carrying Capacity Sample Clauses

Certification of Load Carrying Capacity. The Contractor shall submit to the City a certified report indicating the type of vehicle, make and model, license plate number, assigned Debris hauling number and measured maximum volume, in cubic yards, of the load bed of each piece of equipment to be utilized to haul Debris. The measured volume of each piece of equipment shall be calculated from the actual physical measurement performed by the City or Monitoring Team and Contractor Representative(s). A standard measurement form certifying actual physical measurements of each piece of hauling equipment shall be an attachment to the certified report(s) submitted to the City by the Contractor.
AutoNDA by SimpleDocs
Certification of Load Carrying Capacity. Vendor shall submit to County a certified report indicating the type of vehicle, make and model, license plate number and/or trailer VIN number, assigned debris hauling number and measured maximum volume, in cubic yards, of the load bed of each piece of equipment to be utilized to haul debris. This report shall be maintained, updated, and provided to the County whenever equipment is added or deleted. The measured volume of each piece of equipment shall be calculated from the actual physical measurement performed by County, County’s Debris Monitoring Vendor, and Vendor representatives at a County designated location. A standard measurement form certifying actual physical measurements of each piece of equipment, including side boards and deductions shall be an attachment to the certified reports submitted to County. Each vehicle shall be measured for cubic yard capacity. Each vehicle shall have one numbered certification form prepared with a written description of the measurements, detailed diagram showing the overall inside dimensions, the dimensions of any and all, side boards, and/or deductions, and photograph attached. Deductions, such as doghouses, slant plates, etc. shall be shown as a deduction from the total cubic yards. Example: Measure and diagram length times Width times Height divided by 27= Total Cubic Yard (CY). Second, measure and diagram the “deduction item” and subtract from the total CY. This is the number that will be certified on the certification form and the placard placed on the vehicle. Certification forms shall be in triplicate, sequentially numbered and verified by a County representative. County shall retain the original certification copy, the Vendor shall retain the second copy, and the third copy shall remain in the certified vehicle. Any changes to the equipment size or capacity, i.e. adding or removing sideboards, tailgates etc. will require it to be recertified. This new certification shall be attached to the original certification and documented as to when and/or why recertification was required and occurred. Any vehicle may at any time be re-measured for capacity. If determined the capacity is different due to mathematical error, this new capacity will be reflected on any previous loads, and reconciled as such. Digital copies of truck certifications, forms, and photographs may be used in place of hard copies when applicable technologies are both available and if conform with and are compatible with an approved ADMS used by ...
Certification of Load Carrying Capacity. The Contractor shall submit to the City a certified report indicating the type of vehicle, make and model, license plate number and/or trailer VIN number, assigned debris hauling number and measured maximum hauling weight capacity, in tons, of the load bed each piece of equipment to be utilized to haul debris. The haul weight capacity of each piece of equipment shall be taken from manufacturer’s documentation.
Certification of Load Carrying Capacity. The Contractor shall submit to the Town of Nags Head or approved representative a certified report indicating the type of vehicle, make and model, license plate number and/or trailer VIN number, assigned debris hauling number and measured maximum volume, in cubic yards, of the load bed of each piece of equipment to be utilized to haul debris. The measured volume of each piece of equipment shall be calculated from the actual physical measurement performed by the Town of Nags Head or approved representative and Contractor’s representative(s). A standard measurement form certifying actual physical measurements of each piece of equipment shall be an attachment to the certified report(s) submitted to the Town of Nags Head or approved representative.

Related to Certification of Load Carrying Capacity

  • Trustee Capacity It is expressly understood and agreed by the parties hereto that (i) this Assignment Agreement is executed and delivered by U.S. Bank National Association, not individually or personally but solely on behalf of GSAA Home Equity Trust 2006-3, as the Assignee, in the exercise of the powers and authority conferred and vested in it, (ii) each of the representations, undertakings and agreements by U.S. Bank National Association is made and intended for the purpose of binding only the GSAA Home Equity Trust 2006-3, (iii) nothing herein contained shall be construed as creating any liability for U.S. Bank National Association, individually or personally, to perform any covenant (either express or implied) contained herein, and all such liability, if any, is hereby expressly waived by the parties hereto, and such waiver shall bind any third party making a claim by or through one of the parties hereto, and (iv) under no circumstances shall U.S. Bank National Association be personally liable for the payment of any indebtedness or expenses of the GSAA Home Equity Trust 2006-3, or be liable for the breach or failure of any obligation, representation, warranty or covenant made or undertaken by the GSAA Home Equity Trust 2006-3 under this Assignment Agreement, the Trust Agreement or any related document.

  • CHILD SUPPORT CERTIFICATION Under Section 231.006, Texas Family Code, the Engineer certifies that the individual or business entity named in this contract, bid, or application is not ineligible to receive the specified grant, loan, or payment and acknowledges that this contract may be terminated and payment may be withheld if this certification is inaccurate. If the above certification is shown to be false, the Engineer is liable to the state for attorney’s fees, the cost necessary to complete the contract, including the cost of advertising and awarding a second contract, and any other damages provided by law or the contract. A child support obligor or business entity ineligible to receive payments because of a payment delinquency of more than thirty (30) days remains ineligible until: all arrearages have been paid; the obligor is in compliance with a written repayment agreement or court order as to any existing delinquency; or the court of continuing jurisdiction over the child support order has granted the obligor an exemption from Subsection (a) of Section 231.006, Texas Family Code, as part of a court- supervised effort to improve earnings and child support payments.

  • Acting Capacity ‌ When an employee is assigned temporarily to a job for which he/she is qualified in a higher pay grade for a period of five (5) days or his/her regular workweek, whichever is less, the employee shall be paid retroactively from the initial date of the temporary transfer for the duration of the temporary assignment. The employee shall be paid as if he/she had been promoted during such assignment. In no event may an employee acquire any status in a higher classification as a result of his/her temporary assignment. Acting capacity assignments shall not be made on an arbitrary or capricious basis. Employees shall not be rotated in acting capacity in an arbitrary or capricious manner in order to avoid payment of acting capacity pay. This Article shall not be used in lieu of the proper processing of any request for reclassification or reallocation of a position pursuant to Article 48, Reclassifications, or the filling of a vacancy pursuant to Article 56, Seniority.

  • Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.

  • Interconnection Customer Compensation for Actions During Emergency Condition The CAISO shall compensate the Interconnection Customer in accordance with the CAISO Tariff for its provision of real and reactive power and other Emergency Condition services that the Interconnection Customer provides to support the CAISO Controlled Grid during an Emergency Condition in accordance with Article 11.6.

  • Contract Capacity The capacity of the Project at any time shall be the lower of the following: (A) the contract capacity in MW designated in the Cover Sheet or (B) the Net Rated Output Capacity of the Project (the “Contract Capacity”). Throughout the Delivery Term, Seller shall sell all Product produced by the Project solely to Buyer. In no event shall Buyer be obligated to receive, in any Settlement Interval, any Surplus Delivered Energy. Seller shall not receive payment for any Surplus Delivered Energy. To the extent Seller delivers Surplus Delivered Energy to the Delivery Point in a Settlement Interval in which the Real-Time Price for the applicable PNode is negative, Seller shall pay Buyer an amount equal to the Surplus Delivered Energy (in MWh) during such Settlement Interval, multiplied by the absolute value of the Real-Time Price per MWh for such Settlement Interval.

  • Warranty Affirmations Assurances and Certifications 3.01 Federal Assurances Performing Agency further certifies that, to the extent Federal Assurances are incorporated into the Contract under the Signature Document, the Federal Assurances have been reviewed and that Performing Agency is in compliance with each of the requirements reflected therein.

  • Maximum Capacity The Sick Leave Bank shall accumulate unused Bank days from year to year to a maximum capacity which shall not exceed double the number of eligible employees as defined in the above Section C, Eligibility for Membership.

  • Requesting Price Increase/Required Documentation Contractor must submit a written notification at least thirty (30) calendar days prior to the requested effective date of the change, setting the amount of the increase, along with an itemized list of any increased prices, showing the Contractor’s current price, revised price, the actual dollar difference and the percentage of the price increase by line item. Price change requests must include H-GAC Forms D Offered Item Pricing and E Options Pricing, or the documentation used to submit pricing in the original Response and be supported with substantive documentation (e.g. manufacturer's price increase notices, copies of invoices from suppliers, etc.) clearly showing that Contractor's actual costs have increased per the applicable line item bid. The Producer Price Index (PPI) may be used as partial justification, subject to approval by H-GAC, but no price increase based solely on an increase in the PPI will be allowed. This documentation should be submitted in Excel format to facilitate analysis and updating of the website. The letter and documentation must be sent to the Bids and Specifications manager, Xxxxxxx Xxxxxx, at Xxxxxxx.Xxxxxx@x-xxx.xxx Review/Approval of Requests If H-GAC approves the price increase, Contractor will be notified in writing; no price increase will be effective until Contractor receives this notice. If H-GAC does not approve Contractor’s price increase, Contractor may terminate its performance upon sixty (60) days advance written notice to H-GAC, however Contractor must fulfill any outstanding Purchase Orders. Termination of performance is Contractor’s only remedy if H-GAC does not approve the price increase. H-GAC reserves the right to accept or reject any price change request.

Time is Money Join Law Insider Premium to draft better contracts faster.