CEMENT FINISH CEMENT PLASTER Sample Clauses

CEMENT FINISH CEMENT PLASTER. Before plastering the surface, gauge marks with cement mortar should be carried out in line level and plants at distances less than the gauge xxxxx. These gauge marks should be prepared one day prior to commencement of plastering
AutoNDA by SimpleDocs

Related to CEMENT FINISH CEMENT PLASTER

  • Built-up Area The built-up area for the Designated Apartment or any other Unit shall mean the Carpet Area of such Unit and Balcony area and 50% (fifty percent) of the area covered by those external walls which are common between such Unit/Balcony and any other Unit/Balcony and the area covered by all other external walls of the such Unit/Balcony.

  • Cement Cement to be used for the work shall comply the following and shall be used with the prior approval of Engineer -in -charge

  • FABRICATION Making up data or results and recording or reporting them.

  • Trench Rock Trench rock is defined as any material that must be removed from a trench that cannot be excavated with a hydraulic excavator having a bucket curling force rated at not less than 18,300 pounds (Caterpillar Model 215 or equivalent) and occupies an original volume of at least one-half cubic yard.

  • Extra Work At any time during the Term of this Agreement, City may request that Consultant perform Extra Work. As used herein, “Extra Work” means any work which is determined by City to be necessary for the proper completion of the Project, but which the Parties did not reasonably anticipate would be necessary at the execution of this Agreement. Consultant shall not perform, nor be compensated for, Extra Work without written authorization from City’s Representative.

  • Rippable Rock Rippable rock is defined as any material that can be ripped with a single-tooth hydraulic ripper drawn by a crawler tractor having a minimum draw bar pull rated at not less than 56,000 pounds (Caterpillar D-8K or equivalent) and occupies an original volume of at least one cubic yard.

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • School Improvement Plans The School shall develop and implement a School Improvement Plan as required by section 1002.33(9)(n), Florida Statutes and applicable State Board of Education Rules or applicable federal law.

  • PROHIBITED DECKING AREAS Purchaser shall not deck right-of-way timber in the following areas:  Within the grubbing limits.  Within 50 feet of any stream.  In locations that interfere with the construction of the road prism.  In locations that impede drainage.  On slopes greater than 40%.  Against standing trees unless approved by the Contract Administrator.

Time is Money Join Law Insider Premium to draft better contracts faster.