Blend Simulation Sample Clauses

Blend Simulation. To provide an early warning of any quality problems with the Product Delivered as a result of a Pipeline Blend, Seller shall perform a pre-shipment computer blend simulation representing the quality of Seller’s LSFO from the issuing tank(s) as indicated in the relevant Certificates of Quality or preliminary laboratory analyses of the Tank Final Samples and the quality of Seller’s Pipeline Fill as indicated in the relevant laboratory analyses. The computer blend simulation shall provide preliminary confirmation of the Pipeline Blend’s conformance with the limits for API gravity, viscosity, and percent by weight sulfur content specified in Article IV (Quality). Seller shall provide to Hawaiian Electric or Hawaiian Electric’s representative and the Independent Inspector a copy of the computer blend simulation results prior to shipment. Seller agrees that under no circumstances shall it make a Pipeline Delivery of the Product to Hawaiian Electric without Hawaiian Electric’s express written permission should the computer blend simulation or any other information available to Seller indicate a quality problem with the Product or Pipeline Blend.
AutoNDA by SimpleDocs

Related to Blend Simulation

  • Technical Specifications Each Bloom System is an integrated system comprised of a fuel cell stack assembly and associated balance of plant components that converts a fuel into electricity using electrochemical means that (i) has a Nameplate Capacity of at least 0.5 kilowatts of electricity using an electrochemical process and (ii) has an electricity-only generation efficiency greater than thirty percent (30%).

  • Configuration The configuration for the Purchase Right Aircraft will be the Detail Specification for Model 767-3S2F aircraft at the revision level in effect at the time of the Supplemental Agreement. Such Detail Specification will be revised to include (i) changes required to obtain required regulatory certificates and (ii) other changes as mutually agreed upon by Boeing and Customer.

  • Compatibility The Spacecraft Bus shall be compatible with standard GPS interfaces as defined in [**Redacted**].

  • Stability During the Term, Seller shall conduct the commercial stability program pursuant to Regulatory Requirements applicable as of the Effective Date at its own expense. Should additional stability studies be required, the Parties shall agree, in good faith, upon the protocol, and associated charges, based on the then current charge rates for the staff services, with invoicing for such additional services to occur when the lot is placed on stability.

  • Acceptance Testing The MCP must have the capability to report all elements in the Minimum Data Set as set forth in the ODJFS Encounter Data Specifications and must submit a test file in the ODJFS-specified medium in the required formats prior to contracting or prior to an information systems replacement or update. Acceptance testing of encounter data is required as specified in Section 29(a)(v) of this Appendix.

  • Year 2000 Compatibility Borrower shall take all action necessary to assure that Borrower's computer based systems are able to operate and effectively process data including dates on and after January 1, 2000. At the request of Bank, Borrower shall provide Bank assurance acceptable to Bank of Borrower's Year 2000 compatibility.

  • Quality Specifications SANMINA-SCI shall comply with the quality specifications set forth in its Quality Manual, incorporated by reference herein, a copy of which is available from SANMINA-SCI upon request.

  • Components Patheon will purchase and test all Components (with the exception of Client-Supplied Components) at Patheon’s expense and as required by the Specifications.

  • API A. Reliant shall supply to Cardinal Health for Manufacturing and Packaging, at Reliant’s sole cost, the API and applicable reference standards in quantities sufficient to meet Reliant’s requirements for each Product as further set forth in Article 4. Prior to delivery of any of the API or reference standard to Cardinal Health for Manufacturing and Packaging, Reliant shall provide to Cardinal Health a copy of the API Material Safety Data Sheet (“MSDS”), as amended, and any subsequent revisions thereto. Reliant shall supply the API, reference standards, and Certificate of Analysis FOB the Facility no later than thirty (30) days before the scheduled Manufacture Date upon which such API will be used by Cardinal Health. Upon receipt of the API, Cardinal Health shall conduct identification testing of the API. Cardinal Health shall use the API solely and exclusively for Manufacturing and Packaging under this Agreement. The maximum volume of API that Reliant supplies to Cardinal Health shall not exceed the amount reflected in the Firm Commitment and the next six (6) months of the Rolling Forecast.

  • Stability Testing Patheon may be requested to conduct stability testing on the Products in accordance with the protocols set out in the Specifications for the separate fees and during the time periods set out in Schedule C to a Product Agreement. Patheon will not make any changes to these testing protocols without prior written approval from Client. If a confirmed stability test failure occurs, Patheon will notify Client within one Business Day, after which Patheon and Client will jointly determine the proceedings and methods to be undertaken to investigate the cause of the failure, including which party will bear the cost of the investigation. Patheon will not be liable for these costs unless it has failed to perform the Manufacturing Services in accordance with the Specifications, cGMPs, and Applicable Laws. Patheon will give Client ail stability test data and results at Client’s request.

Time is Money Join Law Insider Premium to draft better contracts faster.