Examples of Variable O&M Rate in a sentence
The CAISO Monthly Variable O&M Cost for each Unit shall be the product of the Unit’s Billable MWh for the Billing Month and the Unit’s Variable O&M Rate.
The CAISO Monthly Variable O&M Cost for each Unit is given by Equation C2-3 and is the product of the sum of Billable MWh for the Billing Month and the Unit’s Variable O&M Rate.
The Annual Fixed Revenue Requirements and the Variable O&M Rate for each such facility that shall be used for calculating charges to the CAISO during each calendar year shall be determined by application of the Formula set forth in Article II hereof to the Owner's costs incurred during the twelve-month period ended on June 30 of the prior calendar year.
The Annual Fixed Revenue Requirements and the Variable O&M Rate for each designated must- run generating facility shall be determined annually.
The Annual Fixed Revenue Requirements and the Variable O&M Rate for each designated must-run generating facility shall be determined annually.
Year-to-Date CAISO Fuel Cost Equation C4-2 ◆ = (YTD Pumping Cost/YTD Energy Produced) Variable O&M Rate Where: • YTD Pumping Cost =Total cost of Energy purchased by Owner for pumping, including transmission charges, from January 1 of the Contract Year through the end of the Billing Month.
Equation C4-2 Year-to-Date CAISO Fuel Cost = (YTD Pumping Cost/YTD Energy Produced) Variable O&M Rate Where: YTD Pumping Cost =Total cost of Energy purchased by Owner for pumping, including transmission charges, from January 1 of the Contract Year through the end of the Billing Month.
Variable O&M Rate for each Unit shall be: 1 Ventura County APCD, where Mandalay Generating Station is located, does not require payment of emissions fees, but rather permit renewal fees.
The Variable O&M Payment (“VOMP”) for each monthly billing period equals the Variable O&M Rate multiplied by the sum over such month of 1) the Unadjusted Metered Energy generated in response to a Buyer dispatch instruction relative to a Reservation of the Unit and 2) , during those hours when Buyer has scheduled a Physical Energy Schedule from the Unit pursuant to Section 3.2, the lesser of in each hour: (i) the Unadjusted Metered Energy (in MWh), or (ii) the Final Physical Energy Schedule (in MWh).
Year-to-Date CAISO Fuel Cost Equation C4-2 = (YTD Pumping Cost/YTD Energy Produced) Variable O&M Rate Where: YTD Pumping Cost =Total cost of Energy purchased by Owner for pumping, including transmission charges, from January 1 of the Contract Year through the end of the Billing Month.