Statewide transportation improvement program (STIP definition

Statewide transportation improvement program (STIP means a statewide prioritized listing/program of transportation projects covering a period of four years that is consistent with the long-range statewide transportation plan, metropolitan transportation plans, and TIPs, and required for projects to be eligible for funding under title 23 U.S.C. and title 49U.S.C. Chapter 53.Chap. I-6 FTA C 4702.1B
Statewide transportation improvement program (STIP means a staged, multiyear, intermodal program of transportation projects covering the State, which is consistent with the Statewide transportation plan and metropolitan transportation plans, and developed under 23 CFR 450.
Statewide transportation improvement program (STIP means “a statewide transportation improvement program (STIP)” as defined in 23 CFR §450.104, namely “a statewide prioritized listing/ program of transportation projects covering a period of four years that is consistent with the long-range statewide transportation plan, metropolitan transportation plans, and TIPs, and required for projects to be eligible for funding under title 23 U.S.C. and title 49 U.S.C. Chapter 53.”

Examples of Statewide transportation improvement program (STIP in a sentence

  • All projects must also be included in the approved Statewide transportation improvement program (STIP) developed as part of the required Statewide transportation planning process.

  • Statewide transportation improvement program (STIP): A statewide prioritized listing/program of transportation projects covering a period of four years that is consistent with the long-range statewide transportation plan, metropolitan transportation plans, and TIPs, and required for projects to be eligible for funding under title 23 U.S.C. and title 49 U.S.C. Chapter 53.” Sub-recipient: A recipient entity that receives federal funding from a Primary recipient (e.g. [SDOT] to carry out a federal program.

  • All projects must also be included in the approved Statewide transportation improvement program (STIP) developed as part of the required Statewide transportation planning process.The ADHS is a cost-to-complete program (i.e., sufficient funding is to be provided over time to complete the approved initial construction/upgrading of the system) authorized by Section 201 of the Appalachian Regional Development Act of 1965.

  • All projects must also be included in the approved Statewide transportation improvement program (STIP) and are developed as part of the required Statewide transportation planning process.

  • Statewide transportation improvement program (STIP) means a statewide prioritized listing/program of transportation projects covering a period of four years that is consistent with the long-range statewide transportation plan, metropolitan transportation plans, and TIPs, and required for projects to be eligible for funding under title 23 U.S.C. and title 49U.S.C. Chapter 53.

  • Amend § 450.216 by adding aparagraph (e) to read as follows: § 450.216 Statewide transportation improvement program (STIP).* * * * *(e) In developing the statewide transportation improvement program, affected local officials with responsibility for transportation shall be involved on a consultation basis for the portions of the program in non- metropolitan areas of the State.

  • Statewide transportation improvement program (STIP): A statewide prioritized listing/program of transportation projects covering a period of four years that is consistent with the long-range statewidetransportation plan, metropolitan transportation plans, and TIPs, and required for projects to be eligible for funding under title 23 U.S.C. and title 49 U.S.C. Chapter 53.” Sub-recipient: A recipient entity that receives federal funding from a Primary recipient (e.g. CTDOT to carry out a federal program.

  • Statewide transportation improvement program (STIP) means a statewide prioritized listing/program of transportation projects covering a period of four years that is consistent with the long-range statewide transportation plan, metropolitan transportation plans, and TIPs, and required for projects to be eligible for funding under title 23 U.S.C. and title 49 U.S.C. Chapter 53.

  • Statewide transportation improvement program (STIP): A statewide prioritized listing/program of transportation projects covering a period of four years that is consistent with the long-range statewide transportation plan, metropolitan transportation plans, and TIPs, and required for projects to be eligible for funding under title 23 U.S.C. and title 49 U.S.C. Chapter 53.” Sub-recipient: A recipient entity that receives federal funding from a Primary recipient (e.g. CTDOT) to carry out a federal program.

  • All projects must also be included in the approved Statewide transportation improvement program (STIP) developed as part of the required Statewide transportation planning process.National Infrastructure Investments TIGER II (highways) grants are awarded to a State, local government, transit agency, or collaboration among such entities on a competitive basis for surface transportation projects that will have a significant impact on the Nation, a metropolitan area, or a region.


More Definitions of Statewide transportation improvement program (STIP

Statewide transportation improvement program (STIP means a statewide prioritized program of federally funded transportation projects or phases of projects. The STIP must cover a period of at least four years and must be updated at least once every four years. The STIP must be consistent with the Statewide Comprehensive Plan and Metropolitan Planning Organization (“MPO”) Transportation Improvement Programs (“TIPs”). All federally funded projects and/or categories of projects are required to be included in the STIP in order to be eligible for federal funds pursuant to Title 23 and Title 49, Chapter 53 of the United States Code.
Statewide transportation improvement program (STIP means “a statewide transportation improvement program (STIP)” as defined in 23 CFR §450.104, namely “a statewide prioritized listing/ program of transportation projects covering a period of four years that is consistent with the long-range statewide

Related to Statewide transportation improvement program (STIP

  • Transportation project means any project that the department is authorized by law to undertake including but not limited to a highway, tollway, bridge, mass transit, intelligent transportation system, traffic management, traveler information services, or any other project for transportation purposes.

  • Improvement Plan means the plan required by the Authority from the Supplier which shall detail how the Supplier will improve the provision of the Goods and/or Services pursuant to Clause 29.1.1 (Authority Remedies);

  • Collaborative pharmacy practice agreement means a written and signed

  • Development Site means any parcel or lot on which exists or which is intended for building development other than the following:

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Clean coal technology demonstration project means a project using funds appropriated under the heading “Department of Energy—Clean Coal Technology,” up to a total amount of $2,500,000,000 for commercial demonstration of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency. The federal contribution for a qualifying project shall be at least 20 percent of the total cost of the demonstration project.

  • Municipal Separate Storm Sewer System Management Program means a management program covering the duration of a state permit for a municipal separate storm sewer system that includes a comprehensive planning process that involves public participation and intergovernmental coordination, to reduce the discharge of pollutants to the maximum extent practicable, to protect water quality, and to satisfy the appropriate water quality requirements of the CWA and regulations, and this article and its attendant regulations, using management practices, control techniques, and system, design, and engineering methods, and such other provisions that are appropriate.

  • MSAA Indicator Technical Specifications document means, as the context requires, either or both of the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Indicator Technical Specifications November 5, 2018 Version 1.3” and the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Target and Corridor-Setting Guidelines” as they may be amended or replaced from time to time;

  • Collaborative drug therapy management means participation by an authorized pharmacist and a physician in the management of drug therapy pursuant to a written community practice protocol or a written hospital practice protocol.

  • Tourism destination project means a qualified non-gaming

  • Marijuana testing facility means an entity licensed to analyze and certify the safety and potency of marijuana.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Redevelopment Plan means the “Lincoln Center Redevelopment Plan” passed, adopted and approved by the City pursuant to the Resolution, and shall include any amendment of said Redevelopment Plan heretofore or hereafter made by the City pursuant to law.

  • Basic Comprehensive User Guide means the Ministry document titled Basic Comprehensive Certificates of Approval (Air) User Guide” dated April 2004 as amended.

  • Maximum medical improvement means that no further material improvement would reasonably be expected from medical treatment or the passage of time;

  • Infrastructure improvement means permanent infrastructure that is essential for the public health and safety or that:

  • Public improvement costs means the costs of:

  • Project Management Plan means the management plan that (i) sets out a high level workplan to describe the manner in which the Design-Builder will manage the Project, including to address related matters such as traffic management and communications, and (ii) is prepared by or for the Design-Builder and submitted to the Owner;

  • Manufacturing Facilities means facilities engaged in the mechanical or chemical transformation of materials or substances into new products and shall include:

  • Nuclear fuel cycle-related research and development activities means those activities which are specifically related to any process or system development aspect of any of the following: - conversion of nuclear material, - enrichment of nuclear material, - nuclear fuel fabrication, - reactors, - critical facilities, - reprocessing of nuclear fuel, - processing (not including repackaging or conditioning not involving the separation of elements, for storage or disposal) of intermediate or high-level waste containing plutonium, high enriched uranium or uranium-233, but do not include activities related to theoretical or basic scientific research or to research and development on industrial radioisotope applications, medical, hydrological and agricultural applications, health and environmental effects and improved maintenance.

  • Non-Administrator Substance Use Disorder Treatment Facility means a Substance Use Disorder Treatment Facility that does not meet the definition of an Administrator Substance Use Disorder Treatment Facility.

  • Cluster development means a contiguous cluster or

  • Remediation waste management site means a facility where an owner or operator is or will be treating, storing or disposing of hazardous remediation wastes. A remediation waste management site is not a facility that is subject to corrective action under § 264.101 of this regulation, but is subject to corrective action requirements if the site is located in such a facility.

  • Manufacturing Facility means buildings and structures, including machinery and equipment, the primary purpose of which is or will be the manufacture of tangible goods or materials or the processing of such goods or materials by physical or chemical change.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Clinical laboratory means a facility for the microbiological, serological, chemical, hematological, radiobioassay, cytological, immunohematological, pathological, or other examination of materials derived from the human body for the purpose of providing information for the diagnosis, prevention, or treatment of a disease or assessment of a medical condition.