re-test definition

re-test means any test subsequent to a periodic CVR test which is carried out on a vehicle in accordance with Regulation 16 on foot of the refusal of a pass statement for that vehicle at the periodic CVR test where:
re-test means the carrying out of Acceptance Tests on the second and any subsequent occasion. Schedule means a schedule annexed to the preceding term and conditions.
re-test means a subsequent test carried out on a vehicle under these Regu- lations, subsequent to the refusal of a test certificate in respect of that vehicle, where—

More Definitions of re-test

re-test means a test carried out on a vehicle, subsequent to the refusal of a pass statement in respect of that vehicle, where—
re-test means any test subsequent to an initial or periodic CVR test which is carried out on a vehicle in accordance with Regulation 16 of the Commercial Vehicle Roadworthiness (Vehicle Testing) (No. 2) Regulations 2013 (S.I. No. 347 of 2013), as amended, on foot of the refusal of a pass statement for that vehicle at its initial or periodic CVR test where:

Related to re-test

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • Fit test means the use of a protocol to qualitatively or quantitatively evaluate the fit of a respirator on an individual.

  • DNS test Means one non-­‐recursive DNS query sent to a particular “IP address” (via UDP or TCP). If DNSSEC is offered in the queried DNS zone, for a query to be considered answered, the signatures must be positively verified against a corresponding DS record published in the parent zone or, if the parent is not signed, against a statically configured Trust Anchor. The answer to the query must contain the corresponding information from the Registry System, otherwise the query will be considered unanswered. A query with a “DNS resolution RTT” 5 times higher than the corresponding SLR, will be considered unanswered. The possible results to a DNS test are: a number in milliseconds corresponding to the “DNS resolution RTT” or, undefined/unanswered.

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • Coverage Test means each of the Class A/B Par Value Test, the Class A/B Interest Coverage Test, the Class C Par Value Test, the Class C Interest Coverage Test, the Class D Par Value Test, the Class D Interest Coverage Test, the Class E Par Value Test and the Class E Interest Coverage Test.

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Screening Test means a drug or alcohol test which uses a method of analysis allowed by the Minnesota Drug and Alcohol Testing in the Workplace Act to be used for such purposes.

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Drug test means a test designed to detect the illegal use of a controlled substance.

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Coverage Tests The Overcollateralization Ratio Test and the Interest Coverage Test, each as applied to each specified Class or Classes of Secured Debt.

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.

  • Incurrence Test means the incurrence test set out in Clause 12.1 (Incurrence Test).

  • Asset Test means, for an Asset Review, each Test, as defined in the Asset Representations Review Agreement, in Schedule A to the Asset Representations Review Agreement to be performed by the Asset Representations Reviewer on the related Asset Review Receivables.

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • Test means such test as is prescribed by the particulars or considered necessary by the Inspecting Officer whether performed or made by the Inspecting Officer or any agency acting under the direction of the Inspecting Officer;

  • Borrowing Base Test means as of any date, a determination that (a) the lesser of (i) the Borrowing Base and (ii) the Facility Amount shall be equal to or greater than (b) the Advances Outstanding.

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Percolation test means a subsurface soil test at the depth of a proposed absorption system or similar component of an OWTS to determine the water absorption capability of the soil, the results of which are normally expressed as the rate at which one inch of water is absorbed. The rate is expressed in minutes per inch.

  • Plant Test Date or "PTD" means the date acceptance testing is performed with CLEC. "Point of Interface", "Point of Interconnection," or "POI" is a demarcation between the networks of two (2) LECs (including a LEC and CLEC). The POI is that point where the exchange of traffic takes place.