PV Power Plant Functional Tests definition

PV Power Plant Functional Tests means the functional tests on the PV Power Plant set forth in Exhibit H-4.

Examples of PV Power Plant Functional Tests in a sentence

  • Contractor shall keep Owner continuously apprised of the schedule for Performance Acceptance Tests and the PV Power Plant Functional Tests including any changes in the schedule, the commencement and performance of such tests, and shall give Owner Representative at least *** advance Notice (which Notice may be by email) of the re-performance of any such tests.

  • Contractor shall submit a test report for each Performance Acceptance Test and PV Power Plant Functional Tests performed by Contractor within *** days after the completion of such Performance Acceptance *** CONFIDENTIAL MATERIAL REDACTED AND SEPARATELY FILED WITH THE SECURITIES AND EXCHANGE COMMISSION.

  • Competitive acquisition will be phased in, applying to 10 of the largest metropolitan statistical areas in 2007, 80 such areas in 2009, and additional areas thereafter.

  • Contractor shall perform the Performance Acceptance Tests and the PV Power Plant Functional Tests in accordance with the Performance Acceptance Test Procedures and PV Power Plant Functional Test Procedures.

Related to PV Power Plant Functional Tests

  • Power Plant means a facility for the generation of

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Unfit-for-use tank system means a tank system that has been determined through an integrity assessment or other inspection to be no longer capable of storing or treating hazardous waste without posing a threat of release of hazardous waste to the environment.

  • Generator Operator means the Person that Operates the Generating Facility and performs the functions of supplying electric energy and interconnected operations services within the meaning of the NERC Reliability Standards.

  • Cannabis testing facility means an entity registered by

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Meet Point A point, designated by the Parties, at which one Party’s responsibility for service begins and the other Party’s responsibility ends.

  • Functional Specifications means the descriptions of features and functions of the Application as expressly set forth in Quote.

  • multi-system operator or “MSO” means a cable operator who has been granted registration under rule 11 of the Cable Television Networks Rules, 1994 and who receives a programming service from a broadcaster and re-transmits the same or transmits his own programming service for simultaneous reception either by multiple subscribers directly or through one or more local cable operators;

  • Development Location Point means a single point selected by the Applicant on the proposed Development site that is located within 100 feet of a residential building existing or to be constructed as part of the proposed Development. For a Development which consists of Scattered Sites, this means a single point on the site with the most units that is located within 100 feet of a residential building existing or to be constructed as part of the proposed Development.

  • Small municipal separate storm sewer system or "small MS4" means all separate storm sewers that are (i) owned or operated by the United States, a state, city, town, borough, county, parish, district, association, or other public body (created by or pursuant to state law) having jurisdiction over disposal of sewage, industrial wastes, stormwater, or other wastes, including special districts under state law such as a sewer district, flood control district or drainage district, or similar entity, or an Indian tribe or an authorized Indian tribal organization, or a designated and approved management agency under § 208 of the CWA that discharges to surface waters and (ii) not defined as "large" or "medium" municipal separate storm sewer systems or designated under 4VAC50-60-380 A 1. This term includes systems similar to separate storm sewer systems in municipalities, such as systems at military bases, large hospital or prison complexes, and highway and other thoroughfares. The term does not include separate storm sewers in very discrete areas, such as individual buildings.

  • Generation Interconnection Customer means an entity that submits an Interconnection Request to interconnect a new generation facility or to increase the capacity of an existing generation facility interconnected with the Transmission System in the PJM Region. Generation Interconnection Request:

  • operating site means a site, other than an aerodrome, selected by the operator or pilot-in-command or commander for landing, take-off and/or external load operations;

  • Service Areas means those areas within the Building used for stairs, elevator shafts, flues, vents, stacks, pipe shafts and other vertical penetrations (but shall not include any such areas for the exclusive use of a particular tenant).

  • Generation Interconnection Facilities Study means a Facilities Study related to a Generation Interconnection Request.

  • Planned Financed Generation Capacity Resource means a Planned Generation Capacity Resource that, prior to August 7, 2015, has an effective Interconnection Service Agreement and has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close.

  • Commissioning Date means that date when construction of the contemplated Project is complete, and the Maintenance Term commences;

  • Marijuana testing facility means an entity licensed to analyze and certify the safety and potency of marijuana.

  • Base Load Generation Resource means a Generation Capacity Resource that operates at least 90 percent of the hours that it is available to operate, as determined by the Office of the Interconnection in accordance with the PJM Manuals.

  • MSAA Indicator Technical Specifications document means, as the context requires, either or both of the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Indicator Technical Specifications November 5, 2018 Version 1.3” and the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Target and Corridor-Setting Guidelines” as they may be amended or replaced from time to time;

  • Key Sub-Contractor means any Sub-Contractor: listed in Framework Schedule 7 (Key Sub-Contractors); which, in the opinion of the Authority and the Customer, performs (or would perform if appointed) a critical role in the provision of all or any part of the Services; and/or with a Sub-Contract with a contract value which at the time of appointment exceeds (or would exceed if appointed) 10% of the aggregate Call Off Contract Charges forecast to be payable under this Call Off Contract;

  • Large municipal separate storm sewer system means all municipal separate storm sewers that are either: