Power Plant Sample Clauses

Power Plant. 3.9.3. Thermally-activated pressure relief device(s)
AutoNDA by SimpleDocs
Power Plant. Employees working in the Power Plant on a straight eight (8) hour shift shall report at such time as to be ready for work at the time their shift begins and shall not absent themselves from duty until relieved or directed to leave. Interruptions for lunch and for coffee shall not total more than forty (40) minutes in the 8-hour shift, and in no case during such interruptions shall employees leave the plant without proper and required attendance. All work assignments in any job classification in the Power Plant may be rotated, or periodically reassigned, among the licensed Power Plant personnel.
Power Plant. Chief Stationary Engineer Stationary Engineer-Lead Stationary Engineer, Boiler Repair Worker Apprentice Stationary Engineer TRADES/MAINTENANCE: The University reserves the right to use multiple trade classifications on composite crews for general construction and maintenance work. Individual tradespersons on composite crews may be required to assist Crew members, other than their own classification, on an infrequent basis. Building Trades Xxxxxxx (Appointed by the University) Building Trades Helper TRADES SERIES: Assistant Xxxxx Xxxxxxxxx (Journeyman) Xxxxxxxxx/Xxxxxxx (Journeyman) Facilities Automation Systems Engineer-Senior, Facilities Automation Systems Engineer Insulation Technician Xxxxx-Cement Worker (Journeyman) Painter-Plaster (Journeyman) Plaster (Journeyman) Plumber-Pipefitter (Journeyman) Pipefitter-Welder (Journeyman) Underground Pipeline Technician APPENDIX 2 SALARY SCHEDULE July 1, 2018 - June 30, 2019
Power Plant. 3.9. Hydrogen storage system 1 If means of identification of type contains characters not relevant to describe the vehicle type covered by this information document, such characters shall be represented in the documentation by the symbol "[..]" (e.g. […]). 2 As defined in the Consolidated Resolution on the Construction of Vehicles (R.E.3.), document ECE/TRANS/WP.29/78/Rev.3, para. 2 - xxx.xxxxx.xxx/xxxxx/xxxx/xx00/xx00xxx/xx00xxx/xx00xxxxxxxxxxx.xxxx
Power Plant. Two Rolls-Royce Deutschland BR710A2-20 turbofan engines power the Aircraft. The engines produce 14,750 lb. of thrust up to 35°C (ISA+20°C) at sea level. The engine is assembled from seven sub-assemblies: fan rotor, intermediate fan casing, HP compressor, combustor/HP turbine, LP turbine, exhaust case and accessory gearbox. It has a single stage low-pressure fan driven by a two stage shrouded low-pressure turbine. A two-stage high-pressure turbine drives a ten-stage high-pressure compressor. The first four stages of the compressor are equipped with variable-pitch stators controlled by the engine’s Full Authority Digital Engine Control (FADEC). The combustor is an annular conventional flow type designed for low emissions and smoke control. A forced mixer exhaust is integrated with a two-door full flow type thrust reverser. The hydraulically operated thrust reverser system, with weight on wheels or wheel spin-up available, will deploy when the thrust reverser levers on the throttle quadrant are operated. For maintenance, the thrust reverser can be locked open. The engine has been designed for “on condition” type maintenance which requires periodic inspection of specific major components. Only those parts that show distress are replaced or overhauled. The periodic maintenance checks are established utilizing the MSG-3 process. The complete power plant assembly is detachable from the pylon as a unit.
Power Plant. The parties agree that the first new power generation plant to be constructed in the Reading and Lehigh Valley Districts will be worked at the full Philadelphia wage and fringe benefit rate.
Power Plant. Licensee shall: 1) Upon signature of this License Agreement, fund the six-month development of a working prototype of a Suncone collector by providing $50,000 at the beginning of each monthly interval starting upon the Commencement Date ; 2) Within eight months of the signing of this License Agreement, fund the development of a commercial Suncone collector ; 3) Within 36 months of the Commencement Date, fund the engineering of a solar power plant utilizing a Suncone array; 4) Provide the funding for the commercialization of Suncone technology on a global basis in a timely manner.
AutoNDA by SimpleDocs
Power Plant. (Stationary Engineer series as listed in descending order) Chief Stationary Engineer Stationary Engineer, Lead Stationary Engineer Boiler Repair Worker
Power Plant. (a) BKP and Contributor acknowledge and agree that (i) Kings Plaza JV, LLC, a Delaware limited liability company (“Power Plant JV”), owns and operates certain energy-generating facilities located at the Property, as more fully described on Exhibit 10.9(a) attached hereto (collectively, the “Power Plant”); (ii) DG Kings Plaza II, LLC (“Power Plant Seller”) owns a seventy-five percent (75%) membership interest in Power Plant JV and Alexander’s of Brooklyn II, LLC (“AOB II”), an affiliate of Contributor, owns a twenty-five percent (25%) membership interest in Power Plant JV, (iii) pursuant to that certain Purchase and Sale Agreement (the “Power Plant PSA”), dated as of August 30, 2012, by and between Power Plant Seller and Kings Plaza TEP LLC (“Power Plant Purchaser”), an affiliate of Contributor, Power Plant Purchaser has agreed to buy from Power Plant Seller, and Power Plant Seller has agreed to sell to Power Plant Purchaser, Power Plant Seller’s seventy-five percent (75%) membership interest in Power Plant JV, and (iv) pursuant to that certain Loan Agreement, dated as of April 15, 0000, Xxxxx Xxxxx Lender, LLC (“Power Plant Lender”), an affiliate of Contributor, has made a loan to Power Plant JV in the original maximum principal amount of $15,000,000, of which $11,618,646 is outstanding as of October 1, 2012 (the “Power Plant Loan”).
Power Plant. (a) The Concessionaire may, at its sole option and discretion, construct a rooftop solar Power Plant at the Jagjeetpur Facilities and/or the Sarai Facilities to produce clean energy. The Concessionaire shall utilise the energy produced by the Power Plant to operate the relevant Facility and sell any excess energy to third party consumers during the Term, in accordance with all Applicable Laws.
Time is Money Join Law Insider Premium to draft better contracts faster.