Power Factor means the ratio of usage power measured in kW to total power measured in kVA;
CAISO Grid means the system of transmission lines and associated facilities of the Participating Transmission Owners that have been placed under the CAISO’s operational control.
Smart grid means capital improvements to an electric distribution utility's distribution infrastructure that improve reliability, efficiency, resiliency, or reduce energy demand or use, including, but not limited to, advanced metering and automation of system functions.
Power Plant means a facility for the generation of
Capacity Performance Resource means a Capacity Resource as described in Tariff, Attachment DD, section 5.5A(a).
Electric power generator means an entity that proposes to
Power Pool means the scheme operated by the Independent System Operator under the Act for exchange of Energy and financial settlement for the exchange of Energy;
Power boiler means a boiler in which steam or other vapor is generated at a pressure of more than 15 psig for use external to itself or a boiler in which water is heated and intended for operation at pressures in excess of 160 psig and/or temperatures in excess of 250 degrees F by the direct application of energy from the combustion of fuels or from electricity, solar or nuclear energy.
Intermodal Rail Yard means a rail facility in which cargo is transferred from drayage truck to train or vice-versa.
Electric power train means the electrical circuit which includes the traction motor(s), and may also include the REESS, the electrical energy conversion system, the electronic converters, the associated wiring harness and connectors, and the coupling system for charging the REESS.
Capacity Utilization Factor or “CUF” shall have the same meaning as provided in CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2009 as amended from time to time; However, for avoidance of any doubt, it is clarified that the CUF shall be calculated on the Contracted Capacity; In any Contract Year, if ‘X’ MWh of energy has been metered out at the Delivery Point for ‘Y’ MW Project capacity, CUF= (X MWh/(Y MW*8766)) X100%; Declared CUF for this Project shall be % (to be revised as applicable).
Generation Capacity Resource shall have the meaning specified in the Reliability Assurance Agreement.
Grid means the system of transmission lines, substations and other works, including the HVDC link used to connect grid injection points and GXPs to convey electricity throughout the North Island and the South Island of New Zealand;
Capacity Interconnection Rights means the rights to input generation as a Generation Capacity Resource into the Transmission System at the Point of Interconnection where the generating facilities connect to the Transmission System.
Interconnection Point means the point(s) of connection(s) at which the project is connected to the grid i.e. it shall be at 11 / 22 kV bus bar level of substation of MSEDCL.
Combined sewer system means a system for conveying both sanitary sewage and storm water runoff.
Energy Use Intensity (EUI means the kBTUs (1,000 British Thermal Units) used per square foot of gross floor area.
Electric power supplier means a person or entity that is duly
Electric utility steam generating unit means any steam electric generating unit that is constructed for the purpose of supplying more than one-third of its potential electric output capacity and more than 25 MW electrical output to any utility power distribution system for sale. Any steam supplied to a steam distribution system for the purpose of providing steam to a steam-electric generator that would produce electrical energy for sale is also considered in determining the electrical energy output capacity of the affected facility.
Planned Financed Generation Capacity Resource means a Planned Generation Capacity Resource that, prior to August 7, 2015, has an effective Interconnection Service Agreement and has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close.
Top Level Domain means the portion of the Domain Name to the right of the right-most period. (In the example, “COM”.) “Second Level Domain” means that portion of a domain name to the left of the right-most period, up to the second period from the right, if any, plus the Top Level Domain. (In the example, “XXXXXXXXX.XXX”.) “Third Level Domain” means that portion of a domain name to the left of the second period from the right, if any, up to the third period from the right, if any, plus the Second Level Domain. (In the example, “XXXXXXXXX.XXXXXXXXX.XXX”.).
Capacity Storage Resource means any Energy Storage Resource that participates in the Reliability Pricing Model or is otherwise treated as capacity in PJM’s markets such as through a Fixed Resource Requirement Capacity Plan.
Cubic foot of gas or “Cubic feet of Gas” means the volume of Gas contained in one (1) cubic foot of space at a standard pressure of fourteen and seventy-three hundredths pounds per square inch absolute (14.73 psia) as required by this Agreement and at a temperature of sixty degrees (60°) Fahrenheit.
Generating Facility Capacity means the net seasonal capacity of the Generating Facility and the aggregate net seasonal capacity of the Generating Facility where it includes multiple energy production devices. Good Utility Practice shall mean any of the practices, methods and acts engaged in or approved by a significant portion of the electric industry during the relevant time period, or any of the practices, methods and acts which, in the exercise of reasonable judgment in light of the facts known at the time the decision was made, could have been expected to accomplish the desired result at a reasonable cost consistent with good business practices, reliability, safety and expedition. Good Utility Practice is not intended to be limited to the optimum practice, method, or act to the exclusion of all others, but rather to delineate acceptable practices, methods, or acts generally accepted in the region. Governmental Authority shall mean any federal, state, local or other governmental regulatory or administrative agency, court, commission, department, board, or other governmental subdivision, legislature, rulemaking board, tribunal, or other governmental authority having jurisdiction over any of the Parties, their respective facilities, or the respective services they provide, and exercising or entitled to exercise any administrative, executive, police, or taxing authority or power; provided, however, that such term does not include Developer, NYISO, Affected Transmission Owner, Connecting Transmission Owner, or any Affiliate thereof. Hazardous Substances shall mean any chemicals, materials or substances defined as or Highway shall mean 115 kV and higher transmission facilities that comprise the following NYCA interfaces: Xxxxxxxx East, West Central, Xxxxxx East, Xxxxx South, Central East/Total East, and UPNY-ConEd, and their immediately connected, in series, bulk power system facilities in New York State. Each interface shall be evaluated to determine additional “in series” facilities, defined as any transmission facility higher than 115 kV that (a) is located in an upstream or downstream zone adjacent to the interface and (b) has a power transfer distribution factor (DFAX) equal to or greater than five percent when the aggregate of generation in zones or systems adjacent to the upstream zone or zones that define the interface is shifted to the aggregate of generation in zones or systems adjacent to the downstream zone or zones that define the interface. In determining “in series” facilities for Xxxxxxxx East and West Central interfaces, the 115 kV and 230 kV tie lines between NYCA and PJM located in LBMP Zones A and B shall not participate in the transfer. Highway transmission facilities are listed in ISO Procedures. Initial Synchronization Date shall mean the date upon which the Large Generating Facility is initially synchronized and upon which Trial Operation begins, notice of which must be provided to the NYISO in the form of Appendix E-1. In-Service Date shall mean the date upon which the Developer reasonably expects it will be ready to begin use of the Connecting Transmission Owner’s Attachment Facilities to obtain back feed power. Interconnection Facilities Study shall mean a study conducted by NYISO or a third party consultant for the Developer to determine a list of facilities (including Connecting Transmission Owner’s Attachment Facilities, Distribution Upgrades, System Upgrade Facilities and System Deliverability Upgrades as identified in the Interconnection System Reliability Impact Study), the cost of those facilities, and the time required to interconnect the Large Generating Facility with the New York State Transmission System or with the Distribution System. The scope of the study is defined in Section 30.8 of the Standard Large Facility Interconnection Procedures.
Psig means pounds per square inch gauge.
Second Level Domain means that portion of a domain name to the left of the right-most period, up to the second period from the right, if any, plus the Top Level Domain. (In the example, “XXXXXXXXX.XXX”.) “Third Level Domain” means that portion of a domain name to the left of the second period from the right, if any, up to the third period from the right, if any, plus the Second Level Domain. (In the example, “XXXXXXXXX.XXXXXXXXX.XXX”.).