Capacity Utilization Factor definition

Capacity Utilization Factor or “CUF” shall have the same meaning as provided in CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2009 as amended from time to time; However, for avoidance of any doubt, it is clarified that the CUF shall be calculated on the Contracted Capacity; In any Contract Year, if ‘X’ MWh of energy has been metered out at the Delivery Point for ‘Y’ MW Project capacity, CUF= (X MWh/(Y MW*8766)) X100%; Declared CUF for this Project shall be % (to be revised as applicable).
Capacity Utilization Factor or “CUF” Shall have the same meaning as provided in CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2009 as amended from time to time.
Capacity Utilization Factor. (CUF) shall mean the ratio of actual energy generated by SPV project over the year to the equivalent energy output at its rated capacity over the yearly period. (CUF = actual annual energy generated from the plant in kWh / (installed plant capacity in kW * 365 *24).

Examples of Capacity Utilization Factor in a sentence

  • Buyer shall purchase the Contracted Capacity and pay for the Contracted Capacity from sixty-five (65%) to one hundred percent (100%) Capacity Utilization Factor (CUF), computed per Billing Period, in accordance with Schedule 3.

  • The Hybrid Power Developer shall have liability to make payment within 30 days from the date of termination notice towards compensation to MSEDCL equivalent to three years billing based on Capacity Utilization Factor of 20.5%.

  • The Power Producer shall have liability to make payment within 30 days from the date of termination notice towards compensation to APDCL equivalent to three years billing based on normative Capacity Utilization Factor of 19%.

  • Capacity Fee = - 0.10773 X (CUF)3 + 0.33975 X (CUF)2 - 0.3932 x (CUF) + 0.2078 Where: Capacity Fee = is the Capacity Fee in $/kWh CUF = is the Capacity Utilization Factor between 65% and 100%, provided that if the actual CUF is below 65% (the "Minimum Capacity Utilization Factor"), the Capacity Price shall be calculated based on the Capacity Fee and quantity associated with the Minimum Capacity Utilization Factor.

  • The Power Producer shall have liability to make payment within 30 days from the date of termination notice towards compensation to P&ED equivalent to three years billing based on normative Capacity Utilization Factor of 19%.


More Definitions of Capacity Utilization Factor

Capacity Utilization Factor. (CUF) means the ratio of the annual output of the plant in kWh versus installed plant capacity for number of days.
Capacity Utilization Factor. (CUF) shall mean the ratio of actual energy generated by SPV project over the year to the equivalent energy output at its rated capacity over the yearly period.
Capacity Utilization Factor. (CUF) means the ratio of the actual output from a solar plant over the year (kWh) to the maximum possible output from it for a year (kWh) under ideal conditions.
Capacity Utilization Factor. (CUF) means the ratio of the annual output of the plant in kWh versus installed plant capacity for number of days. CUF = plant output in kWh / (installed plant capacity in kW * 365X24).
Capacity Utilization Factor. (CUF) shall mean the ratio of actual energy generated by
Capacity Utilization Factor. (“CUF”) means the ratio of total kWh (units) of power generated by Solar Plant in a year and Contracted capacity in kW multiplied with Number of hours in the same Year.
Capacity Utilization Factor. (CUF) in a Year shall mean the ratio of the output of the SPV Power Plant in a Year versus installed Project capacity x 365 x 24.