Stormwater management system means any equipment, plants,
Active User means PSC employees, and any users actively participating on the system in any given month of operation, who shall be bound to the terms and conditions of this Agreement. Licensor does not impose a limit on the number of Active Users accessing or registering to use the system.
street furniture ’ means public facilities and structures which are not intended primarily for advertising and includes but is not limited to seating benches, planters, bins, pole mounted bins, bus shelters, sidewalk clocks, drinking fountains, Telkom boxes, traffic signal controllers, electricity boxes, post boxes and telephone booths, but excludes road traffic signs, traffic signals, street lights or any other road-related structures;
Finished Lots Entitled Land with respect to which (a) development has been completed to such an extent that permits to allow use and construction, including building, sanitary sewer and water, are entitled to be obtained for a Unit on such Entitled Land and (b) start of construction has not occurred.
Drainage system means one or more artificial ditches, tile drains or similar devices which collect surface runoff or groundwater and convey it to a point of discharge.
Exclusive Use Area means a part or parts of the common property for the exclusive use by the owner or owners of one or more sections;
Built-Up Area and/or “Covered Area” in relation to a Flat shall mean the floor area of that Flat including the area of balconies and terraces, if any attached thereto, and also the thickness of the walls (external or internal) and the columns and pillars therein Provided That if any wall, column or pillar be common between two Flats, then one-half of the area under such wall column or pillar shall be included in the built-up area of each such Flat.
Area A means the area marked “Area A” outlined in red on the Plan (excluding that part shaded grey on the Plan);
Stormwater management means the programs to maintain quality and quantity of stormwater runoff to pre-development levels.
Sewage system means the entire sewage treatment and subsurface disposal system;
Lot Size means the number Underlying Assets in one Lot in a CFD.
Black Start means the ability of a Unit to start without an external source of electricity or the process of doing so.
Area B means the area marked “Area B” outlined in orange on the Plan;
Phase II means the second part of the tuition incentive assistance program which provides assistance in the third and fourth year of 4-year degree programs.