PATH Project definition

PATH Project means development, construction, ownership, operation and maintenance, currently expected to be as part of a joint venture with AEP, of an approximately 290 mile transmission line, which is currently proposed to include an approximately 244 mile 765 kV transmission line to run from AEP’s existing Axxx substation to Allegheny Power’s Bedington substation and an approximately 46 miles of twin circuit 500 kV transmission line between the Bedington station and a new substation at Kemptown, Maryland (provided that such route may be changed or modified), and including transformers, substations, radial lines, and other equipment and facilities, and the other related electric transmission projects.
PATH Project means development, construction, ownership, operation and maintenance, as part of a joint venture with American Electric Power Company, Inc. (“AEP”), of an approximately 000 xxxx 000 xX transmission line to run from AEP’s existing Xxxx Substation in Xxxxxx County, WV to the proposed Kemptown Substation southeast of New Market, MD (provided that such route may be changed or modified) including transformers, substations, which includes a new Xxxxxx Spring Substation along the proposed route in northwest Hardy County, WV, radial lines, and other equipment and facilities, and the other related electric transmission projects.

Examples of PATH Project in a sentence

  • BHCS began another project that established behavioral health-based primary care homes, based ona SAMHSA grant called the Promoting Access to Health (PATH) Project.

  • On September 28, 2012, PATH filed in Docket No. ER12-2708-000 seeking to recover approximately $121.5 million in abandonment costs associated with the PATH Project, for the period of January 1, 2008 through August 31, 2012.

  • PJM had already undertaken an initiative for a comprehensive analysis of the need for the PATH Project, which considered alternatives.

  • On December 28, 2007, in Docket No. ER08-386- 000, PATH filed proposed tariff sheets pursuant to FPA section 205 to be included in PJM’s OATT, and requested several transmission rate incentives for the PATH Project.

  • Transmission planning for the PATH Project was a regional undertaking.

  • The PJM Board of Managers identified the PATH Project as part of PJM’s 2007 RTEP assessment of long-term region-wide reliability, based on 2012 conditions.

  • Additionally, with regard to Joint Consumer Advocates’ argument that PATH imprudently incurred $4.3 million of the cost of the PATH Project because it exceeded typical cost escalation over time, PATH asserts that Joint Consumer Advocates present no analysis of actual expenditures.

  • PATH’s cost recovery for the PATH Project has developed over several proceedings before the Commission.

  • At hearing, Joint Consumer Advocates contended that PATH imprudently failed to recommend the suspension of the PATH Project when events were evident that the Project should not continue to go forward.

  • In 2008, PJM adopted a reconfiguration; as reconfigured, the PATH Project was to be a 275 mile 765 kV line from Amos Substation in West Virginia through Virginia to the new Kemptown Substation in Maryland.

Related to PATH Project

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Development Project means a project for the development of land within a

  • Redevelopment project means a specific construction project

  • New Project means (a) each facility or operating location which is either a new facility, location or office or an expansion, relocation, remodeling or substantial modernization of an existing facility, location or office owned by the Borrower or its Subsidiaries which in fact commences operations and (b) each creation (in one or a series of related transactions) of a business unit to the extent such business unit commences operations or each expansion (in one or a series of related transactions) of business into a new market.

  • Redevelopment Project Area means an area designated by the municipality, which is not less in the aggregate than 1 1/2 acres and in respect to which the municipality has made a finding that there exist conditions which cause the area to be classified as an industrial park conservation area or a blighted area or a conservation area, or a combination of both blighted areas and conservation areas.

  • The Project Plan means the document to be developed by the Supplier and approved by the Purchaser, pursuant to GCC Clause 19, based on the requirements of the Contract and the Preliminary Project Plan included in the Supplier’s bid. The “Agreed and Finalized Project Plan” is the version of the Project Plan approved by the Purchaser, in accordance with GCC Clause 19.2. Should the Project Plan conflict with the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.

  • Pilot project means an innovative environmental project that covers one or more designated facilities, designed and implemented in the form of an EMSA. (See Section 52.3 of the Act.)

  • The Project means supply, installation, testing and commissioning, integration of computer hardware and services with support under Warranty and annual maintenance contract, if required for the contract period.

  • Sub-project means a specific development project to be carried out by a Beneficiary utilizing the proceeds of a Sub-loan;

  • Research Project means a discrete scientific endeavor to answer a research question or a set of research questions related to medical marijuana and is required for a medical marijuana research license.

  • Project Improvements means site improvements and facilities that are:

  • Ongoing Project means a multi-year project undertaken by a Company in fulfilment of its CSR obligation having timelines not exceeding three years excluding the financial year in which it was commenced, and shall include such project that was initially not approved as a multi-year project but whose duration has been extended beyond one year by the board based on reasonable justification;

  • Solar PV Project means the solar Photo Voltaic Power project that uses sunlight for direct conversion into electricity through Photo Voltaic technology.

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Expansion Project has the meaning set forth in Section IV.3.a of this Agreement.

  • Project area budget means a multiyear projection of annual or cumulative

  • Infrastructure improvement means permanent infrastructure that is essential for the public health and safety or that:

  • Capital Improvement Project means the acquisition, construction, reconstruction, improvement, planning and equipping of roads and bridges, appurtenances to roads and bridges to enhance the safety of animal-drawn vehicles, pedestrians, and bicycles, wastewater treatment facilities, water supply systems, solid waste disposal facilities, and storm water and sanitary collection, storage and treatment facilities including real property, interests in real property, facilities, and equipment related or incidental to those facilities.

  • Phase 1 means the first implementation phase of this section, beginning June 1, 2018 and ending May 31, 2022.

  • Large project means, for purposes of the Soft Cost Ratio limitation in Section 3.F, a Project with more than 24 Housing Credit units.

  • Infrastructure Improvements means a street, road, sidewalk, parking facility, pedestrian mall, alley, bridge, sewer, sewage treatment plant, property designed to reduce, eliminate, or prevent the spread of identified soil or groundwater contamination, drainage system, waterway, waterline, water storage facility, rail line, utility line or pipeline, transit-oriented development, transit-oriented property, or other similar or related structure or improvement, together with necessary easements for the structure or improvement, owned or used by a public agency or functionally connected to similar or supporting property owned or used by a public agency, or designed and dedicated to use by, for the benefit of, or for the protection of the health, welfare, or safety of the public generally, whether or not used by a single business entity, provided that any road, street, or bridge shall be continuously open to public access and that other property shall be located in public easements or rights-of-way and sized to accommodate reasonably foreseeable development of eligible property in adjoining areas. Infrastructure improvements also include 1 or more of the following whether publicly or privately owned or operated or located on public or private property:

  • Infrastructure project means any construction or acquisition of treatment works,

  • Projects means the projects identified in Exhibit A to the Agreement and all other projects, any costs of which are included in a Transitional Capital Plan pursuant to the Act or are Recovery Costs, and financed, by payment or reimbursement, with the proceeds of Bonds or Notes.

  • Project Cost means the costs incurred in connection with the

  • The Project Site, where applicable, means the place or places named in the SCC.

  • Project area plan means a written plan that, after the plan's effective date, guides and controls the development within a project area.