MSRC Response Equipment definition

MSRC Response Equipment means equipment of MSRC and MSRC Integral Subcontractors available from time to time under this Agreement, including the equipment described in MSRC’s OSRO Certification RRI.
MSRC Response Equipment means equipment of MSRC and MSRC Integral Subcontractors available from time to time under this Agreement, including theequipment described in MSRC’s OSRO Certification RRI.

Examples of MSRC Response Equipment in a sentence

  • If practicable, the Covered Entity will arrange for the cleaning of the MSRC Response Equipment within the Response Area.

  • The Covered Entity will arrange and pay for cleaning, repairing, and replacing, as necessary, all MSRC Response Equipment provided under this Agreement so that the equipment is free of Oil and Hazardous Substances and in as good a condition, operating order, and repair as when initially provided by MSRC, except for ordinary wear and tear.

  • MSRC's Oil Spill Removal Organization (“OSRO”) Classification RRI lists MSRC Response Personnel and MSRC Response Equipment that are available as Resources.

  • The Covered Entity may obtain the requested MSRC Response Equipment with or without MSRC Response Personnel, at the option of the Covered Entity.

  • However, if MSRC reasonably believes, under the circumstances of a given event or request, that MSRC Response Personnel are required to ensure proper care, operation, and maintenance of certain MSRC Response Equipment as indicated in Schedule 3, MSRC may require that the MSRC Response Equipment be obtained only with the appropriate MSRC Response Personnel.

  • MSRC will pay all valid taxes and fees owed due to providing MSRC Response Equipment or MSRC Response Personnel under this Agreement.

  • MSRC may clean and repair or replace the MSRC Response Equipment at the Covered Entity’s expense if the Covered Entity fails to timely perform its obligations under this Section 7.02 or upon agreement between the Covered Entity and MSRC in other circumstances as appropriate.

  • The Covered Entity will use its best efforts to operate, maintain, and store any MSRC Response Equipment provided without associated MSRC Response Personnel in a careful and proper manner under the circumstances and in accordance with applicable law.

  • MSRC may not be named, under this Agreement, without MSRC's prior written consent, as a primary response contractor in any other Response Plan, or for any location outside the WSMC Operational Area, or as a "non-cascadable resource" in any location (meaning where MSRC Response Equipment would be restricted as to location rather than available for cascading to other locations).

Related to MSRC Response Equipment

  • Service Equipment means any equipment, Software, systems, cabling and facilities provided by or on behalf of Verizon and used to facilitate provision of the Services at a Customer Site. Ownership of the Service Equipment does not pass to Customer. Service Equipment does not include Verizon Facilities.

  • Port Cargo Handling Equipment means rubber-tired gantry cranes, straddle carriers, shuttle carriers, and terminal tractors, including yard hostlers and yard tractors that operate within ports.

  • Emergency Load Response Program means the program by which Curtailment Service Providers may be compensated by PJM for Demand Resources that will reduce load when dispatched by PJM during emergency conditions, and is described in Operating Agreement, Schedule 1, section 8 and the parallel provisions of Tariff, Attachment K-Appendix, section 8. Energy Efficiency Resource: “Energy Efficiency Resource” shall have the meaning specified in the PJM Reliability Assurance Agreement. Energy Market Opportunity Cost:

  • Generation Interconnection Request means a request by a Generation Interconnection Customer pursuant to Tariff, Part IV, subpart A, to interconnect a generating unit with the Transmission System or to increase the capacity of a generating unit interconnected with the Transmission System in the PJM Region.

  • Electrical equipment means underground equipment that contains dielectric fluid that is necessary for the operation of equipment such as transformers and buried electrical cable.

  • Past Response Costs means all costs, including, but not limited to, direct and indirect costs, that the United States paid at or in connection with the Site through [insert date of most recent cost summary], plus Interest on all such costs through such date.]

  • Transportation project means any project that the department is authorized by law to undertake including but not limited to a highway, tollway, bridge, mass transit, intelligent transportation system, traffic management, traveler information services, or any other project for transportation purposes.

  • Lowest responsible bidder or vendor means the bidder or vendor: (1) whose response to a request for bids offers the lowest price and is responsive; and (2) who is responsible.

  • Customer Equipment means hardware, software, systems, cabling and facilities provided by you and used in conjunction with the Equipment that we supply to you in order to receive the Services;

  • Customer-generator means a user of a net metering system.

  • Tourism destination project means a qualified non-gaming

  • Emergency Response Agency is a governmental entity authorized to respond to requests from the public to meet emergencies.

  • CIP (Destinations means Carriage and Insurance Paid up to named port of destination. Additionally the Insurance (local transportation and storage) would be extended and borne by the Supplier from ware house to the consignee site for a period including 3 months beyond date of delivery.

  • Airport Ground Support Equipment means vehicles and equipment used at an airport to service aircraft between flights.

  • Interconnection equipment means a group of components or an integrated system owned and operated by the interconnection customer that connects an electric generator with a local electric power system, as that term is defined in Section 3.1.6.2 of IEEE Standard 1547, or with the electric distribution system. Interconnection equipment is all interface equipment including switchgear, protective devices, inverters or other interface devices. Interconnection equipment may be installed as part of an integrated equipment package that includes a generator or other electric source.

  • Lowest Cost Response means the response required or allowed under Environmental Laws that addresses the condition present at the lowest cost (considered as a whole taking into consideration any material negative impact such response may have on the operations of the relevant assets and any potential material additional costs or liabilities that may likely arise a result of such response) as compared to any other response that is consistent with Environmental Laws.

  • Production Environment means a logical group of virtual or physical computers comprised within the Cloud Environment to which the Customer will be provided with access and use the purchased Cloud Application(s) in production and for its generally marketed purpose.

  • Load Control Equipment means the equipment (which may include, but is not limited to, ripple receivers and relays) that is from time to time installed in, over or on Consumer’s Premises for the purpose of receiving signals sent by Load Signalling Equipment and switching on and off, or otherwise controlling, controllable load;

  • Interim Response Costs means all costs, including but not limited to direct and indirect costs, (a) paid by the United States in connection with the Site between [insert date identified in Past Response Costs definition] and the Effective Date, or (b) incurred prior to the Effective Date, but paid after that date.]

  • Transportation equipment means 1 or more of the following:

  • Interconnection Request means a Generation Interconnection Request, a Transmission Interconnection Request and/or an IDR Transfer Agreement.

  • Host At Destination means the person with whom the Insured is sharing prearranged overnight accommodations in the host's home.

  • Large Facility Interconnection Procedures or “LFIP”) shall mean the interconnection procedures applicable to an Interconnection Request pertaining to a Large Generating Facility that are included in Attachment X of the NYISO OATT. Standard Large Generator Interconnection Agreement (“LGIA”) shall mean this Agreement, the form of interconnection agreement applicable to an Interconnection Request pertaining to a Large Generating Facility, that is included in Attachment X of the NYISO OATT. System Deliverability Upgrades shall mean the least costly configuration of commercially available components of electrical equipment that can be used, consistent with Good Utility Practice and Applicable Reliability Requirements, to make the modifications or additions to Byways and Highways and Other Interfaces on the existing New York State Transmission System and Distribution System that are required for the proposed project to connect reliably to the system in a manner that meets the NYISO Deliverability Interconnection Standard at the requested level of Capacity Resource Interconnection Service. System Protection Facilities shall mean the equipment, including necessary protection signal communications equipment, required to (1) protect the New York State Transmission System from faults or other electrical disturbances occurring at the Large Generating Facility and (2) protect the Large Generating Facility from faults or other electrical system disturbances occurring on the New York State Transmission System or on other delivery systems or other generating systems to which the New York State Transmission System is directly connected. System Upgrade Facilities shall mean the least costly configuration of commercially available components of electrical equipment that can be used, consistent with Good Utility Practice and Applicable Reliability Requirements, to make the modifications to the existing transmission system that are required to maintain system reliability due to: (i) changes in the system, including such changes as load growth and changes in load pattern, to be addressed in the form of generic generation or transmission projects; and (ii) proposed interconnections. In the case of proposed interconnection projects, System Upgrade Facilities are the modifications or additions to the existing New York State Transmission System that are required for the proposed project to connect reliably to the system in a manner that meets the NYISO Minimum Interconnection Standard. Tariff shall mean the NYISO Open Access Transmission Tariff (“OATT”), as filed with the Commission, and as amended or supplemented from time to time, or any successor tariff. Trial Operation shall mean the period during which Developer is engaged in on-site test operations and commissioning of the Large Generating Facility prior to Commercial Operation.

  • Generation Interconnection Customer means an entity that submits an Interconnection Request to interconnect a new generation facility or to increase the capacity of an existing generation facility interconnected with the Transmission System in the PJM Region. Generation Interconnection Request:

  • END USER CUSTOMER LOCATION means the physical location of the premises where an End User makes use of the telecommunications services.

  • Transit-oriented facility means a facility that houses a transit station in a manner that promotes transit ridership or passenger rail use.