Gilbert Repair Project definition

Gilbert Repair Project means the construction at the Gilbert Facility related to the sinking of the foundation and the flooding of the cottages;

Related to Gilbert Repair Project

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Tenant Improvements Defined in Exhibit B, if any.

  • Renovation means altering a facility or one or more facility components in any way, including the stripping or removal of RACM from a facility component. Operations in which load-supporting structural members are wrecked or taken out are demolitions.

  • Capital Improvement Project means the acquisition, construction, reconstruction, improvement, planning and equipping of roads and bridges, appurtenances to roads and bridges to enhance the safety of animal-drawn vehicles, pedestrians, and bicycles, wastewater treatment facilities, water supply systems, solid waste disposal facilities, and storm water and sanitary collection, storage and treatment facilities including real property, interests in real property, facilities, and equipment related or incidental to those facilities.

  • Condominium Project Real estate including the separate ownership in fee, or on a satisfactory leasehold estate, of a particular residential unit with an indivisible interest in the real estate designated for common ownership strictly by unit owners.

  • Construction Work means any work in connection with⎯

  • construction site means a workplace where construction work is being performed;

  • Infrastructure Improvements means a street, road, sidewalk, parking facility, pedestrian mall, alley, bridge, sewer, sewage treatment plant, property designed to reduce, eliminate, or prevent the spread of identified soil or groundwater contamination, drainage system, waterway, waterline, water storage facility, rail line, utility line or pipeline, transit-oriented development, transit-oriented property, or other similar or related structure or improvement, together with necessary easements for the structure or improvement, owned or used by a public agency or functionally connected to similar or supporting property owned or used by a public agency, or designed and dedicated to use by, for the benefit of, or for the protection of the health, welfare, or safety of the public generally, whether or not used by a single business entity, provided that any road, street, or bridge shall be continuously open to public access and that other property shall be located in public easements or rights-of-way and sized to accommodate reasonably foreseeable development of eligible property in adjoining areas. Infrastructure improvements also include 1 or more of the following whether publicly or privately owned or operated or located on public or private property:

  • Project Equipment means all personal property, goods, leasehold improvements, machinery, equipment, furnishings, furniture, fixtures, tools and attachments wherever located and whether now owned or hereafter acquired, financed in whole or in part with the proceeds of the Bonds, and any additions and accessions thereto, substitutions therefor and replacements thereof, including, without limitation the Project Equipment described in Appendix C hereto, as amended from time to time in accordance herewith.

  • Capital Improvements mean the purchase, renovation, rehabilitation, or construction of permanent land, buildings, structures, equipment and furnishings used directly for or in the Project, and any goods or services for the Project that are purchased and capitalized under GAAP, including any organizational costs and research and development costs incurred in Illinois. Capitalized lease costs for land, buildings, structures or equipment shall be included in “Capital Improvements” only if the lease term, including any extensions or options to extend, equals or exceeds the term of this Agreement, and provided that such lease costs are valued at their present value using the corporate interest rate prevailing at the time the Company filed its Application with the Department.

  • The Project Site, where applicable, means the place or places named in the SCC.

  • Tenant’s Work means all improvements, alterations, fixture, equipment, and signage installation, and furniture placement necessary or appropriate for the conduct of the Permitted Use, including all work described as Tenant’s Work on Exhibit D, attached (the “Work Letter”).

  • Constructional Plant means all equipments, materials, appliances or things of whatsoever nature required for execution, completion or maintenance of the works (as hereinafter defined) but does not include materials or other things intended to form or forming part of the permanent work.

  • Tenant Improvement Work means the construction of the Tenant Improvements, together with any related work (including demolition) that is necessary to construct the Tenant Improvements.

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Project Improvements means site improvements and facilities that are:

  • Emergency Repairs means repairs to a utility facility located in or adjacent to a primary city street that must be performed immediately when the necessity arises to safeguard life or property or maintain continued operation of the facility.

  • The Project means supply, installation, testing and commissioning, integration of computer hardware and services with support under Warranty and annual maintenance contract, if required for the contract period.

  • Landlord Work means the work, if any, that Landlord is obligated to perform in the Premises pursuant to a separate agreement (the “Work Letter”), if any, attached to this Lease as Exhibit C.

  • Emergency repair means work necessary to prevent destruction or dilapidation to real property or structural appurtenances thereto immediately threatened or damaged by fire, flood, earthquake or other disaster.

  • Tenant Work All work installed or furnished to the Premises by Tenant in connection with Tenant’s initial occupancy pursuant to Rider 2 and the Workletter.