Flood Management Project definition

Flood Management Project means a project that will alter, modify or change the base flood elevation of a 1% annual chance flood event.
Flood Management Project means a project that will alter, modify or change the base flood eleva tion of a 1% annual chance flood event.

Examples of Flood Management Project in a sentence

  • The City utilizes a Flood Management Project Design checklist during the plan review process as part of the analysis.

  • Ms Cate Hart (Executive Director, Environment, Heritage and Sustainability, Department for Environment and Water) and Katharine Ward, (Gawler River Flood Management Project Officer, Department for Environment and Water) provided a presentation on the Business Case – also refer Agenda item 8.1. GRB 98/23 Defer Formal Agenda Moved: Mr James Miller Seconded: Cr Bruce Preece That agenda item 10.3 be brought forward.CARRIED UNANIMOUSLY 10:51am Ian Baldwin left the meeting.

  • This document provides a report on the implementation of measures identified in the Environmental Management Plan (EMP) for the project: Works Contract 1B.3/2 Stage II – The construction of docking- mooring infrastructure on Lower Odra River and on boundary sections of Odra River as well as new aids to navigation as part of the Odra-Vistula Flood Management Project (OVFMP).

Related to Flood Management Project

  • Tidal Flood Hazard Area means a flood hazard area in which the flood elevation resulting from the two-, 10-, or 100-year storm, as applicable, is governed by tidal flooding from the Atlantic Ocean. Flooding in a tidal flood hazard area may be contributed to, or influenced by, stormwater runoff from inland areas, but the depth of flooding generated by the tidal rise and fall of the Atlantic Ocean is greater than flooding from any fluvial sources. In some situations, depending upon the extent of the storm surge from a particular storm event, a flood hazard area may be tidal in the 100-year storm, but fluvial in more frequent storm events.

  • Special Flood Hazard Area means an area that FEMA’s current flood maps indicate has at least a one percent (1%) chance of a flood equal to or exceeding the base flood elevation (a 100-year flood) in any given year.

  • Load Management means a Demand Resource (“DR”) as defined in the Reliability Assurance Agreement.

  • Flood-related erosion area management means the operation of an overall program of corrective and preventive measures for reducing flood-related erosion damage, including but not limited to emergency preparedness plans, flood-related erosion control works and floodplain management regulations.

  • Stormwater management BMP means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management BMP may either be normally dry (that is, a detention basin or infiltration system), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).

  • Flood Program means the National Flood Insurance Program created by the U.S. Congress pursuant to the National Flood Insurance Act of 1968, the Flood Disaster Protection Act of 1973, the National Flood Insurance Reform Act of 1994 and the Flood Insurance Reform Act of 2004, in each case as amended from time to time, and any successor statutes.

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Stormwater management basin means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management basin may either be normally dry (that is, a detention basin or infiltration basin), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).

  • Fund Management means the persons responsible for the portfolio and/or risk management of the Fund.

  • Flood Hazard Boundary Map (FHBM means an official map of a community, issued by the Federal Emergency Management Agency, where the boundaries of the Special Flood Hazard Areas have been defined as Zone A.

  • Environmental Management Plan or “EMP” means the environmental management plan for the Project, including any update thereto, incorporated in the IEE;

  • Flood proofing means any combination of structural and non-structural additions, changes, or adjustments to structures which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures and their contents.

  • Floodplain Management means the operation of an overall program of corrective and preventive measures for reducing flood damage, including but not limited to emergency preparedness plans, flood control works and floodplain management regulations.

  • Stormwater management means the programs to maintain quality and quantity of stormwater runoff to pre-development levels.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.