Chemistry Centre definition

Chemistry Centre means the Chemistry Centre (WA) established by section 4;

Examples of Chemistry Centre in a sentence

  • One of the samples must be delivered, on behalf of the person who provided the samples, to the Chemistry Centre (WA) by a police officer or a person appointed or engaged for that purpose.

  • Despite subsection (1), the Chemistry Centre (WA) need not store the sample for more than 3 months.

  • The Chemistry Centre is to pay to the Treasurer in respect of each financial year an amount equivalent to the sum of all local government rates and charges that, but for subsection (2) and the Local Government Act 1995 section 6.26(2)(a)(i), the Chemistry Centre would have been liable to pay in respect of that financial year.

  • Nothing in this section limits the ability of the Chemistry Centre to perform a function through an officer or agent.

  • Proceedings may be taken by or against the Chemistry Centre in its corporate name.

  • The common seal of the Chemistry Centre is to be affixed to a document in the presence of 2 members of the board, who are to sign the document to attest that the common seal was so affixed.

  • Chemistry Centre (WA) established by the Chemistry Centre (WA) Act 20077.

  • The Chemistry Centre is a body corporate with perpetual succession.

  • The “enemy” of self-determination and choice is usually seen as imposing from the top down.

  • A report that must be prepared under the Financial Management Act 2006 Part 5 (and any accompanying document) and any other report or document of the Chemistry Centre that is to be, or might be, made public, must not include client related information or personal information unless each person or organisation to whom the information relates has given consent to including the information.

Related to Chemistry Centre

  • Study Centre means a centre established and maintained or recognized by the University for the purpose of advising, counselling or for rendering any other assistance required by the students in the context of distance education;

  • LCC-300 Cost Centre L : EPIW - STRUCTURE (OPTION 1) Lump Sum Breakdown L4 : Widening of Boundary Patrol Road (Area D) (EPIW) (Option 1) Lump Sum Item LSL4.7 L4.7 : Diversion of Utilities Method-Related Charges The Contractor shall enter hereunder in detail any method related charges items in accordance with CESMM3 Section 7 --------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSL4.7 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • Temporary clean coal technology demonstration project means a clean coal technology demonstration project that is operated for a period of five years or less and that complies with the SIP and other requirements necessary to attain and maintain the national ambient air quality standards during the project and after the project is terminated.

  • Clean coal technology demonstration project means a project using funds appropriated under the heading “Department of Energy—Clean Coal Technology,” up to a total amount of $2,500,000,000 for commercial demonstration of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency. The federal contribution for a qualifying project shall be at least 20 percent of the total cost of the demonstration project.

  • LCC-300 Cost Centre E Terminus Building - Structure Lump Sum Breakdown E4 : Station (GL X7-27/M-Q, 15.00m-21.96m) Lump Sum Item LSE4.4 E4.4 : Structural Steelwork Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Lump Sum Breakdown and for which a separate charge is required. The unit of measurement for any Contractor's Other Charges shall be "sum", with Quantity and Rate columns entered with "N/A". ---------------------------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSE4.4 *** ----------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • LCC-300 Cost Centre F Terminus Building - ABWF Lump Sum Breakdown F5 : Shared Facilities Lump Sum Item LSF5.1 F5.1 : Shared Facilities - ABWF Dense concrete blockwork; compressive strength 7.0N/mm2 stretcher bond; in cement/lime mortar; flush pointed; as Appendix AA to Particular Specification, section F10 Thickness: 140mm, U511.1 vertical straight walls m2 *** *** *** Thickness: 140mm; 2 hours fire rating U511.2 vertical straight walls m2 *** *** *** Ancillaries U581 joint reinforcement; 24 gauge galvanised expanded steel mesh; 300mm wide m *** *** *** U583 movement joints; fire rated filler; 140 mm in depth; as Drawing nr LCC300/31/A24/154, 156 m *** *** *** U586 fixings and ties; galvanised mild steel dove tail ties m2 *** *** *** U589 head restraint; galvanised mild steel angle; 70 x 70 x 3mm thick; sleeved and dowelled into blockwork at 2000mm centres m *** *** *** PAINTING Emulsion paint; with one coat thinned with water in accordance with manufacturer's recommendation and two unthinned coats; as Appendix AA to Particular Specification, section M60 Plaster and render V543 surfaces inclined at an angle exceeding 60 degrees to the horizontal m2 *** *** *** -------------------------------------------------------------------------------------------------------------- To Collection of Lump Sum Item LSF5.1 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • municipal spatial development framework means a municipal spatial development framework adopted by the Municipality in terms of Chapter 5 of the Municipal Systems Act;

  • Research and development facility means an establishment engaged in laboratory, scientific, or experimental testing and development related to new products, new uses for existing products, or improving existing products. The term does not include an establishment engaged in efficiency surveys, management studies, consumer surveys, economic surveys, advertising, promotion, banking, or research in connection with literary, historical, or similar projects.

  • LCC-300 Cost Centre I EXTERNAL WORKS Lump Sum Breakdown I15 : Gas Main Lump Sum Item LSI15.1 I15.1 : Gas Main Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Lump Sum Breakdown and for which a separate charge is required. The unit of measurement for any Contractor's Other Charge shall be "sum", with Quantity and Rate columns entered with "N/A". ------------------------------------------------------------------------------------------------------------------- Total of Lump Sum Item LSI15.1 *** ------------ *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • LCC-300 Cost Centre G Terminus Building : E&M Works Lump Sum Breakdown G4 : Plumbing and Drainage Lump Sum Item LSG4.4 G4.4 : Cold Water Installation Contractor's Other Charges The Contractor shall enter hereunder any specific item of work or obligation or thing which is necessary for the execution of the Works, as required by the Contract, which has been omitted from or has not been separately itemised in this Lump Sum Breakdown and for which a separate charge is required. The unit of measurement for any Contractor's Other Charge shall be "sum", with Quantity and Rate columns entered with "N/A". sum *** *** *** ------------------------------------------------------------------------------------------------ To Collection of Lump Sum Item LSG4.4 *** ---------- *** Certain information on this page has been omitted and filed separately with the Securities and Exchange Commission. Confidential treatment has been requested with respect to the omitted portions. [STAMP]

  • Data Centre or "DC" means the primary centre where data, software, computer systems and associated components, such as telecommunication and storage systems, redundant or backup power supplies, redundant data communications, environment controls and security devices are housed and operated from;

  • Development Area means that area to which a development plan is applicable.

  • spatial development framework means the Kouga Municipal Spatial Development Framework prepared and adopted in terms of sections 20 and 21 of the Act and Chapter 2 of this By-Law;

  • land development area means an erf or the land which is delineated in an application submitted in terms of this By-law or any other legislation governing the change in land use and “land area” has a similar meaning;

  • Clean coal technology means any technology, including technologies applied at the precombustion, combustion, or post combustion stage, at a new or existing facility which will achieve significant reductions in air emissions of sulfur dioxide or oxides of nitrogen associated with the utilization of coal in the generation of electricity, or process steam which was not in widespread use as of November 15, 1990.

  • Commercial Development means any development on private land that is not heavy industrial or residential. The category includes, but is not limited to: hospitals, laboratories and other medical facilities, educational institutions, recreational facilities, plant nurseries, multi-apartment buildings, car wash facilities, mini-malls and other business complexes, shopping malls, hotels, office buildings, public warehouses and other light industrial complexes.

  • LHSIA means the Local Health System Integration Act, 2006, and the regulations made under it, as it and they may be amended from time to time;

  • Cluster development means a contiguous cluster or

  • Planned development means a real property development other than a community apartment project, a condominium project, or a stock cooperative, having either or both of the following features:

  • Project Management The individuals appointed by each Party cf. clause 4.1 in the Agreement.

  • Regulatory Floodway means the channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height.

  • Centre means the International Centre for Settlement of Investment Disputes Established by the ICSID Convention; and

  • Collaborative drug therapy management means participation by an authorized pharmacist and a physician in the management of drug therapy pursuant to a written community practice protocol or a written hospital practice protocol.

  • Development Authority means the New Jersey Schools

  • Cost center means a cost category delineated by cost reporting forms prescribed by the office.

  • Physical therapy licensing board or "licensing board" means the agency of a state that is responsible for the licensing and regulation of physical therapists and physical therapist assistants.