Backflow prevention device means a safety device used to prevent pollution or contamination of the water supply due to the reverse flow of water from the irrigation system.
Backflow Prevention Assembly means any mechanical assembly installed at a water service line or at a plumbing fixture to prevent a backflow contamination event, provided that the mechanical assembly is appropriate for the identified contaminant at the cross connection and is an in-line field-testable assembly.
Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).
Backflow preventer means a device or means to prevent backflow.
Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.
Drug test means a test designed to detect the illegal use of a controlled substance.
technical specification means a document that prescribes technical requirements to be fulfilled by a product, process or service;
Phase I Clinical Study means a human clinical study of a product, the principal purpose of which is a preliminary determination of safety in healthy individuals or patients, as described in 21 C.F.R. 312.21(a).
Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.
MSAA Indicator Technical Specifications document means, as the context requires, either or both of the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Indicator Technical Specifications November 5, 2018 Version 1.3” and the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Target and Corridor-Setting Guidelines” as they may be amended or replaced from time to time;
Waste prevention means source reduction and reuse, but not recycling.
Air-purifying respirator means a respirator with an air-purifying filter, cartridge, or canister that removes specific air contaminants by passing ambient air through the air-purifying element.
Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.
Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.
Phase I Clinical Trial means a clinical trial conducted in healthy humans or patients, which clinical trial is designed to establish the safety, drug-drug interactions and/or pharmacokinetics of an investigational drug given its intended use, and to support continued testing of such drug in Phase II Clinical Trials.
Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).
Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.
Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.
Technical Specifications means the detailed requirements for the Work furnished by the Architect and set forth in Book 3 of the Contract Documents.
Phase 2 Clinical Trial means a human clinical trial of a product in any country that would satisfy the requirements of 21 C.F.R. 312.21(b) and is intended to explore a variety of doses, dose response, and duration of effect, and to generate initial evidence of clinical safety and activity in a target patient population, or a similar clinical study prescribed by the relevant Regulatory Authorities in a country other than the United States.
Electrostatic application means the application to a substrate of charged atomized paint droplets that are deposited by electrostatic attraction.
Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:
Phase II Clinical Study means a human clinical study of a product initiated to determine the safety and efficacy in the target patient population, as described 21 C.F.R. 312.21(b).
Stand-Alone Test Environment or "SATE" shall have the meaning set forth in Section 12.2.9.3.2.
Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.
Phase I Study means a study in humans which provides for the first introduction into humans of a product, conducted in healthy volunteers or patients to obtain information on product safety, tolerability, pharmacological activity or pharmacokinetics, as more fully defined in 21 C.F.R. § 312.21(a) (or the non-United States equivalent thereof).