Voltage Drop Calculations Sample Clauses

Voltage Drop Calculations. The CONSULTANT shall submit voltage drop calculations showing the equation or equations used along with the number of luminaries per circuit, the length of each circuit, the size conductor or conductors used and their ohm resistance values. The voltage drop incurred on each circuit (total volts and percentage of drop) shall be calculated, and all work necessary to calculate the voltage drop values for each circuit should be presented in such a manner as to be duplicated by the VILLAGE. The voltage drop calculations shall be submitted as part of the lighting design analysis report.
AutoNDA by SimpleDocs

Related to Voltage Drop Calculations

  • Offense Level Calculations i. The base offense level is 7, pursuant to Guideline § 2B1.1(a)(1).

  • DATA FOR CALCULATIONS The initial calculations for any payments owing under this Agreement shall be based upon the valuations placed upon the Qualified Property by the Appraisal District in its annual certified appraisal roll submitted to the District pursuant to § 26.01 of the TEXAS TAX CODE in or about July of each year of this Agreement. The certified appraisal roll data shall form the basis from which any and all amounts due under this Agreement are calculated, and the data utilized by the Consultant will be adjusted as necessary to reflect any subsequent adjustments by the Appraisal District to the District’s appraisal roll. Any estimates used by the Consultant to make calculations as required by this Agreement shall be based on the best and most current information available. The Consultant shall from time to time adjust the data utilized to reflect actual amounts, subsequent adjustments by the Appraisal District to the District’s certified appraisal roll, or any other relevant changes to material items such as student counts or tax collections.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Rental Rates and Wage Rates for Change Orders As soon as is practical, but prior to the completion of the Construction Preparation Period and in any event prior to the commencement of any Work on the Site, the Contractor shall submit in accordance with the style and format of a specimen to be furnished by the Owner for consideration of the Owner the following: (1) a proposal for rental rates on heavy construction equipment that shall apply in the event Change Order Work is performed, and (2) a proposal for wage rates for the types of project labor that shall apply in the event of the execution of any Change Order Work. Under penalty of false swearing, a principal of the contracting firm shall certify that the proposal for rental rates and proposal for wage rates do not exceed current costs for like services. The Owner will in no event consider a rental rate in excess of eighty percent of the rate set forth in the latest edition of the "Compilation of Nationally Averaged Rental Rates for Construction Equipment" of the Associated Equipment Distributors unless the rates proposed in excess of eighty percent are supported by proof satisfactory to the Owner that the excess rates are reasonable. If the equipment is owned by the Contractor the costs shall be charged at a maximum of eighty percent of market monthly rental rates for the amount of time used. If applicable, transportation costs may be included. The decision of the Owner shall be final, binding and conclusive on all parties. Rental rates shall be payable only for the actual time the equipment is required on the Site.

  • Net Metering If you generate electricity from a renewable generating facility to offset your electricity consumption and/or use net metering at any time during the term of this Agreement, you must notify Starion.

  • Revenue Metering The Connecting Transmission Owner’s revenue metering will be located on the generator side of the 115kV breaker at the Xxxxx Solar Collector Substation and will consist of: • three (3) combination current/voltage transformer (“CT/VT”) units (manufacturer and model ABB/Xxxxxxx KXM-550, GE Grid Solutions KOTEF 000.XX, or other equivalent specified by Connecting Transmission Owner); and • one (1) revenue meter. The ratios of the CTs and VTs will be provided by Connecting Transmission Owner upon its review of the Interconnection Customer’s design documents. (Note: Connecting Transmission Owner’s revenue metering CTs and VTs cannot be used to feed the Interconnection Customer’s check meter.) SERVICE AGREEMENT NO. 2556

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • NETWORK INTERCONNECTION METHODS 64.1 This Section sets forth the terms and conditions for Network Interconnection Methods (NIMs) provided between CenturyLink and CLEC for the Interconnection Facilities established between the Parties’ networks. Additionally, this Section describes the physical architecture for the Interconnection of the Parties’ facilities and equipment required for the transmission and routing of Local Traffic, ISP-Bound Traffic, IntraLATA LEC Toll Traffic, VoIP-PSTN Traffic, Transit Traffic and Jointly Provided Switched Access Service Traffic.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Interconnection Customer Drawings Within one hundred twenty (120) days after the date of Initial Operation, unless the Interconnection Parties agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Transmission Provider and the Interconnected Transmission Owner final, “as-built” drawings, information and documents regarding the Customer Interconnection Facilities, including, as and to the extent applicable: a one-line diagram, a site plan showing the Customer Facility and the Customer Interconnection Facilities, plan and elevation drawings showing the layout of the Customer Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Customer Facility to the step-up transformers and the Customer Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Customer Facility. As applicable, the Interconnection Customer shall provide Transmission Provider and the Interconnected Transmission Owner specifications for the excitation system, automatic voltage regulator, Customer Facility control and protection settings, transformer tap settings, and communications.

Time is Money Join Law Insider Premium to draft better contracts faster.