Unit 23 – Condensate Storage and Loading Sample Clauses

Unit 23 – Condensate Storage and Loading. This test is to demonstrate that the Condensate Loading System meets the Condensate flow and loading rate guarantee as shown in Project Specification Process Design Basis. A series of composition samples will be taken along with unit conditions to illustrate the unit’s ability to produce and maintain the required composition.
AutoNDA by SimpleDocs
Unit 23 – Condensate Storage and Loading. This test is not required for the Stage 2 Liquefaction Facility.

Related to Unit 23 – Condensate Storage and Loading

  • Delivery Points The measurement of and tests for quality of Shipper's Gas redelivered at the Delivery Points shall be governed by and determined in accordance with the requirements of the receiving pipeline at each Delivery Point.

  • Floor Loading Floor loading capacity shall be within building design capacity. Tenant may exceed floor loading capacity with Landlord’s consent, at Landlord’s sole discretion and must, at Tenant’s sole cost and expense, reinforce the floor as required for such excess loading.

  • STORAGE TANKS AND SUMPS 3.1 Is any above or below ground storage of gasoline, diesel, petroleum, or other Hazardous Materials in tanks or sumps proposed in, on or about the Premises? Existing Tenants should describe any such actual or proposed activities. Yes [ ] No [ ] If yes, please explain:

  • Underground Tanks If underground or other storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any underground storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks.

  • Storage Tanks If storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks. Notwithstanding anything to the contrary contained herein, Tenant shall have no right to use or install any underground storage tanks at the Project.

  • Delivery Point Once Manufacture of the Products has been completed, Contractor shall be responsible for delivering the Finished Goods FCA, (as defined in Incoterms (2000) published by the International Chamber of Commerce) and to a freight forwarder specified by Company in its Order, or otherwise approved by Company. “Delivery Point” as used in this Agreement shall mean the specific time and location that the Product is delivered to the shipper specified on the Order.

  • Underground Storage Tanks Borrower shall not install or permit to be installed on the Property any underground storage tank.

  • Time and Location The closing of the transactions contemplated by this Agreement (the “Closing”) shall take place at the offices of Xxxxxx Xxxxxx Xxxxxxxxx Xxxx and Xxxx LLP in Boston, Massachusetts, commencing at 10:00 a.m., local time, on October 31, 2005, or, if all of the conditions to the obligations of the Parties to consummate the transactions contemplated hereby (excluding the delivery of any documents to be delivered at the Closing by any of the Parties and other than satisfaction of those conditions that by their terms are to be satisfied or waived at Closing, it being understood that the occurrence of the Closing shall remain subject to the delivery of such documents and the satisfaction or waiver of such conditions) have not been satisfied or waived by such date, on such mutually agreeable later date as soon as practicable (but in no event more than three Business Days (as defined below)) after the first date on which the conditions to the obligations of the Parties to consummate the transactions contemplated hereby (excluding the delivery of any documents to be delivered at the Closing by any of the Parties and other than satisfaction of those conditions that by their terms are to be satisfied or waiver at Closing, it being understood that the occurrence of the Closing shall remain subject to the delivery of such documents and the satisfaction or waiver of such conditions) have been satisfied or waived (the “Closing Date”). For purposes of this Agreement, a “Business Day” shall be any day other than (i) a Saturday or Sunday or (ii) a day on which banking institutions located in New York, New York are permitted or required by law, executive order or governmental decree to remain closed.

  • Floor Load Tenant shall not place a load upon any floor of the Premises that exceeds 50 pounds per square foot “live load”. Landlord reserves the right to reasonably designate the position of all Equipment which Tenant wishes to place within the Premises, and to place limitations on the weight thereof.

  • Keys and Locks Landlord will furnish Tenant, free of charge, two keys to each door or lock in the Premises. Landlord may make a reasonable charge for any additional or replacement keys. Tenant will not duplicate any keys, alter any locks or install any new or additional lock or bolt on any door of its Premises or on any other part of the Building without the prior written consent of Landlord and, in any event, Tenant will provide Landlord with a key for any such lock. On the termination of the Lease, Tenant will deliver to Landlord all keys to any locks or doors in the Building which have been obtained by Tenant.

Time is Money Join Law Insider Premium to draft better contracts faster.