Common use of Temporary Energy Centres Clause in Contracts

Temporary Energy Centres. The TEC concept is shown on Drawing G002, and general arrangement drawings for the TEC-E and TEC-W locations are shown on Drawings C101 and C102, all in Appendix One. Each TEC consists of two 2.9 MW9 non-condensing boilers housed within a standard 53 foot shipping container. In addition to the boilers, the TEC will house circulation pumps, an expansion tank and all necessary communications and controls. The TECs will require a concrete pad for seismic anchoring and electrical and gas connections. The temporary energy centre design is based on the following criteria:  Peak heating loads of 4 MW in both the eastern and western branches of the Xxxxx 0 XXXX  Required turndown ratio of 10:1 to meet base load conditions 9 The current concept is based on a boiler selection at 2.9 MW, but this may vary (3 MW to 3.5 MW) depending upon final equipment selections.  Minimum of 70% of peak load redundancy  Containerized plant to be assembled off-site  Supply temperatures of up to 90oC  Return temperatures as low as 50oC  Thermal efficiency of 84% and  Maximum fireside heating surface area of less than 150 m2 to allow for unsupervised operation.

Appears in 3 contracts

Samples: Agreement, Infrastructure Agreement, Infrastructure Agreement

AutoNDA by SimpleDocs

Temporary Energy Centres. The TEC concept is shown on Drawing G002, and general arrangement drawings for the TEC-E and TEC-W locations are shown on Drawings C101 and C102, all in Appendix One. Each TEC consists of two 2.9 MW9 non-condensing boilers housed within a standard 53 foot shipping container. In addition to the boilers, the TEC will house circulation pumps, an expansion tank and all necessary communications and controls. The TECs will require a concrete pad for seismic anchoring and electrical and gas connections. The temporary energy centre design is based on the following criteria: Peak heating loads of 4 MW in both the eastern and western branches of the Xxxxx 0 XXXX  Phase 1 NDES • Required turndown ratio of 10:1 to meet base load conditions 9 The current concept is based on a boiler selection at 2.9 MW, but this may vary (3 MW to 3.5 MW) depending upon final equipment selections. Minimum of 70% of peak load redundancy Containerized plant to be assembled off-site Supply temperatures of up to 90oC Return temperatures as low as 50oC Thermal efficiency of 84% and Maximum fireside heating surface area of less than 150 m2 to allow for unsupervised operation.

Appears in 1 contract

Samples: Infrastructure Agreement

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.