Structural Test Facility Support Sample Clauses

Structural Test Facility Support. The Contractor shall provide technician support for all structural strength and structural dynamics work activities managed through the Structural Test Facility whether work is performed at the Structural Test Facility or at MSFC on-site test facilities. The scope of this WBS includes technician support required for maintenance, upgrade, modification and refurbishment of existing Structural Test Facility systems and equipment. This work also involves support during test buildup and test operations, and support during buildup and fabrication of new facility capabilities required to accomplish the mission of the Structural Test Facility. Typical work activities include, but are not limited to: - power hand tool operation (drills, metal cutting saws, etc.) - power equipment/machining operations (drill press, table saws, CNC xxxxx and lathe, manual xxxxx and lathe, metal cutting band saw, etc) - hydraulic pump maintenance, troubleshooting and operation - load control system maintenance, troubleshooting and operation - vacuum system maintenance, troubleshooting and operation - pneumatic system maintenance, troubleshooting and operation (air, GN2, helium, hydrogen, etc.) - cryogenic system maintenance, troubleshooting and operation (LN2, LH2, LHe) - electrical wire termination - electrical cable fabrication - tensile test machine maintenance, troubleshooting and operation - material handling, mobile crane operation, bridge crane operation, aerial lift operation, fork lift operation - rigging operations required to support lift operations - data system operations support (fabricating drag-on cables, wiring termination, etc) - data sensor installation (pressure transducers, strain gages, temperature sensors, load cells, etc) - welding operations (MIG, TIG, stick) - digital audio/video equipment installation and operation
AutoNDA by SimpleDocs

Related to Structural Test Facility Support

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Building Commissioning Services The Owner may provide as a part of its testing services the Building Commissioning services involving the project’s HVAC and exhaust systems, temperature control systems, fire detection and alarm systems, emergency power and lighting system, fire suppression system, security locks and security locking control systems, food service equipment (if applicable), and laundry equipment (if applicable). In the event the Using Agency’s Program specifies additional commissioning services, the Owner shall procure such services as well. The Owner, through its Executive Administrator, may engage an independent Commissioning Authority. It is the intent of this Article that the Commissioning Authority enforce the requirements mentioned herein and certify that the systems and equipment listed all function properly prior to the initiation of each final inspection.

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

  • System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Repair Testing At the time of repair of a LIS trunk group, at no additional charge, tests will be performed to ensure that the service is operational and meets the applicable technical parameters.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Facility Maintenance Seller shall perform, or cause to be performed, all scheduled and unscheduled maintenance required on the Facilities in order to meet the Warranty Specifications and Performance Standards. In that regard, Seller’s responsibilities hereunder shall include, without limitation, promptly correcting any Bloom System or BOF malfunctions, either by (i) recalibrating or resetting the malfunctioning Bloom System or BOF, or (ii) subject to Section 5.7(b), repairing or replacing Bloom System or BOF components which are defective, damaged, worn or otherwise in need of repair or replacement.

  • ADDITIONAL SPECIAL CONTRACT CONDITIONS A. Special Contract Conditions revisions: the corresponding subsections of the Special Contract Conditions referenced below are replaced in their entirety with the following:

  • Lodgement of SWS wage assessment agreement C.6.1 All SWS wage assessment agreements under the conditions of this schedule, including the appropriate percentage of the relevant minimum wage to be paid to the employee, must be lodged by the employer with Fair Work Australia.