Site Plan Preparation. CDW will perform civil engineering services for the revised design of a new maintenance building to be located on the existing school site. The services will include additional changes to the original design including a new gas line service, a larger building footprint to accommodate 2 additional bathrooms within the building and associated grading of the site. CDW will prepare a site plan showing the layout of the new maintenance building footprint with site grading, drainage and new utilities to service the building. SCHEDULE OF SERVICES Upon receipt of your written authorization to proceed, CDW will commence the work outlined in the SCOPE OF SERVICES. We will provide the services in a coordinated and expeditious manner to support the project deliverables and goals.
AutoNDA by SimpleDocs
Site Plan Preparation. CDW will perform civil engineering services for the design of a new maintenance building to be located on the existing school site. The services will include the design for layout, grading, drainage and new utilities. CDW will review the existing drainage calculations for the new Hunking School and determine if any new infiltration will be required for the new roof area of the maintenance building. CDW will prepare a site plan showing the layout of the new maintenance building with site grading, drainage and new utilities to service the building.

Related to Site Plan Preparation

  • Site Preparation Contractor shall not begin a project for which the site has not been prepared, unless Contractor does the preparation work at no cost, or until Region 4 ESC includes the cost of site preparation in a purchase order. Site preparation includes, but is not limited to: moving furniture, installing wiring for networks or power, and similar pre-installation requirements.

  • Construction Preparation Period 2.1.3 Construction Management Plan

  • Surface Preparation Clean the surface to be treated of all dust, dirt, clay, grass, sod and any other deleterious matter before application of the asphalt surface treatment.

  • OBJECTIVE AND PREPARATION Offer, acceptance and performance (Clause 2). 2 F: ……….… V: ….……… T: ….……... Item Documents (Clause 3). Clause 3.1 is deleted and substituted with: 'This tender is for a Government Contract. No Payment Guarantee will be provided.' Clause 3.3 is deleted and substituted with: The principal agent shall complete the schedule and arrange for formal signing of the agreement once the priced bill of quantities/lump sum document, security, insurances and waiver of lien, where acceptable, have been provided and effected'. 3 F: ……….… V: ….……… T: ….……... Item Design responsibility (Clause 4). 4 F: ……….… V: ….……… T: ….……... Item Employer's agents (Clause 5). 5 F: ……….… V: ….……… T: ….……... Item Site representative (Clause 6). 6 F: ……….… V: ….……… T: ….……... Item Compliance with regulations (Clause 7). 7 F: ……….… V: ….……… T: ….……... Item

  • Site Plan It is Licensee’s responsibility before signing this Agreement to ensure that the Site Plan correctly shows the work that Licensee intends to perform, that the Site Plan correctly shows all improvements and equipment that Licensee intends be located on the Use Areas, that the Site Plan shows no work, improvements or equipment outside the Exclusive Areas and Shared Areas properly depicted and labeled on the Boundary Plan, and that all work, improvements and equipment is encompassed within the purposes enumerated in the Standard Terms for that particular Exclusive Area or Shared Area. Any work, improvements or equipment not conforming to all the foregoing is prohibited, even if it is clearly shown on the Site Plan or discussed in the Standard Terms. Any refinement or other change to the Site Plan after Licensor executes this Agreement is void unless Licensee obtains Licensee’s approval of the change pursuant to the plans approval processes set out in the Standard Terms and pursuant to all applicable regulatory requirements.

  • Joint Preparation The preparation of this Agreement has been a joint effort of the parties and the resulting documents shall not, solely as a matter of judicial construction, be construed more severely against one of the parties than the other.

  • Proposal Preparation The contractor shall assume all costs associated with preparation of proposals for task order awards under the proposal process as an indirect charge (B&P costs). The Government will not reimburse awardees for proposals as a direct charge.

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Specific Preliminaries C1. Proprietary branded products The contractor shall take delivery of, handle, store, use, apply and/or fix all proprietary branded products in strict accordance with the manufacturer's instructions after consultation with the manufacturer's authorised representative. 95 F: ……….… V: ….……… T: ….……... Item C2. Trade Names, etc. All materials, fittings, finishings, etc., specified hereinafter under a trade name, catalogue number or reference, must be exactly as described. The Architect's approval in writing must be obtained for the use of any alternative to the specification before the submission of tenders otherwise the specified materials, fittings, finishings, etc., will be assumed to have been allowed for in the tender. The Contractor must take delivery of, handle, store, use, apply and/or fix all proprietary branded products in strict accordance with the manufacturer's instructions after consultation with the manufacturer's authorised representative. 96 F: ……….… V: ….……… T: ….……... Item C3. Contractors responsibility The Employer, the Principal Agent and the other professional consultants shall not be responsible for any act or omission on the part of the Contractor which may result in any patent or latent defects, in materials or workmanship, breach or neglect of any local regulations. The Contractor shall at all times be responsible for any such neglect, deviation or wrong act, whether the same is discovered before or after the final certificate, or any other Certificate, has been approved. 97 F: ……….… V: ….……… T: ….……... Item Carried to Collection R Section 1 Bill No. 1 Preliminaries C4. Overtime Should overtime be required to be worked for any reason whatsoever, the costs of such overtime are to be borne by the contractor unless the principal agent has specifically authorised in writing, prior to the execution thereof, that costs for such overtime are to be borne by the employer. 98 F: ……….… V: ….……… T: ….……... Item

  • Ownership of Drawings and Specifications All Drawings, Specifications and copies thereof furnished by the A/E are to remain A/E’s property. These documents are not to be used on any other project, and with the exception of one contract set for each party to the Contract, are to be returned to the A/E, upon request, following completion of the Work.