Scheduling of Library Faculty Sample Clauses

Scheduling of Library Faculty. The director of the library shall prepare a staffing needs schedule for each regular semester and for summer. After receiving semester and summer schedule requests from library faculty, the director of the library shall use the written procedures developed for the library faculty when determining each library faculty member’s schedule. If no written procedure is in place, the schedule assignments shall be determined by seniority until a procedure is approved.
AutoNDA by SimpleDocs
Scheduling of Library Faculty. Seniority will be used to resolve conflicts in preference for scheduling days, hours, and overload. Any disagreement regarding workload or schedule may be appealed through the Xxxx of Liberal Arts and Sciences and the Vice President of Academic Affairs for library assignments. The director of the library shall prepare an annual schedule for the librarians by August 1st.

Related to Scheduling of Library Faculty

  • Scheduling of Overtime In any case where no employee is available to work a shift or the extension of a shift at straight time, and the Employer thereupon determines that it is necessary to assign the work on an overtime basis, the following provisions will govern the assignment of the overtime.

  • Scheduling of Work Subcontractor shall provide Contractor with scheduling information and a proposed schedule for performance of the Subcontract Work consistent with the Progress Schedule and in a form acceptable to Contractor. Subcontractor shall comply with the Progress Schedule including, but not specifically limited to, commencement, duration, and sequencing of activities. Contractor shall reasonably cooperate with the Subcontractor in scheduling the Subcontract Work and shall attempt, as reasonably possible, to avoid conflicts or interference with the Subcontract Work.

  • SCHEDULING OF THE WORK The number of working days stipulated for this Contract is 5. These working days shall be consecutive. The Contractor is not required to submit a schedule for this project. Liquidated damages will be assessed beyond the number of working days specified above as well as the completion date as noted in this tender form and agreement. The Contractor must advise the Engineer 48 hours in advance of work starting.

  • Rescheduling of Tests If the Independent Engineer certifies to the Authority and the Concessionaire that it is unable to issue the Completion Certificate or Provisional Certificate, as the case may be, because of events or circumstances on account of which the Tests could not be held or had to be suspended, the Concessionaire shall be entitled to re-schedule the Tests and hold the same as soon as reasonably practicable.

  • Filing of Materials All records related to a grievance shall be filed separately from the personnel files of the employees.

  • Preparatory Contract Negotiations Meetings Where operational requirements permit, the Employer will grant leave without pay to an employee to attend preparatory contract negotiations meetings.

  • Reporting of Metered Data and Parameters 7.2.1 The grid connected Solar PV power plants will install necessary equipment for regular monitoring of solar irradiance (including GHI, DHI and solar radiation in the module plane), ambient air temperature, wind speed and other weather parameters and simultaneously for monitoring of the electric power (both DC and AC) generated from the Project.

  • Committee Composition and Selection 1. The committee shall be comprised of eight members as follows: • five Teachers • three administrators

  • Maintenance Scheduling The NTO shall schedule maintenance of its facilities designated as NTO Transmission Facilities Under ISO Operational Control and schedule any outages (other than forced transmission outages) of said transmission system facilities in accordance with outage schedules approved by the ISO. The NTO shall comply with maintenance schedules coordinated by the ISO, pursuant to this Agreement, for NTO Transmission Facilities Under ISO Operational Control. The NTO shall be responsible for providing notification of maintenance schedules to the ISO for NTO Transmission Facilities Requiring ISO Notification. The NTO shall provide notification of maintenance schedules to affected Transmission Owners for NTO Transmission Facilities Requiring ISO Notification and Local Area Transmission Facilities pursuant to Section 3.5.3 of the ISO Services Tariff.

  • Maintenance Manual No later than 60 (sixty) days prior to the Project Completion Date, the Contractor shall, in consultation with the Authority’s Engineer, evolve a maintenance manual (the “Maintenance Manual”) for the regular and preventive maintenance of the Project Highway in conformity with the Specifications and Standards, safety requirements and Good Industry Practice, and shall provide 5 (five) copies thereof to the Authority’s Engineer. The Authority’s Engineer shall review the Maintenance Manual within 15 (fifteen) days of its receipt and communicate its comments to the Contractor for necessary modifications, if any.

Time is Money Join Law Insider Premium to draft better contracts faster.