Rotameters Sample Clauses

Rotameters. If the stream can not be properly measured with an orifice in a 2-inch line, with integral orifice d/p cell, or with corner tap meter runs, area type meters may be used for flow measurements. Also, use area meters: (1) where a suitable orifice installation cannot be used; (2) for highly viscous or highly corrosive materials; (3) for fluids containing solids in suspension; or (4) when rangeability greater than three to one is required. Glass tube meters with light metal protective cases are used for air and water unless the temperature or pressure exceeds the meter rating. Meters on other services will be armored type, either metal tube, or glass tube within a pressure sealed enclosure. Indicating scales are graduated 0 to 100 and a scale factor is used. Area meter transmitters of the deflection type and may be used. Local indication is by a deflection pointer and scale or a receiver gauge in the transmitter case. Electronic transmitters shall be used for interfacing with DCS. For further information, refer to Project Specification 5578-E2-SP-IE-00001, Flow Instruments.
AutoNDA by SimpleDocs

Related to Rotameters

  • Scaling “Scaling,” as used herein, involves:

  • Check Meters Developer, at its option and expense, may install and operate, on its premises and on its side of the Point of Interconnection, one or more check meters to check Connecting Transmission Owner’s meters. Such check meters shall be for check purposes only and shall not be used for the measurement of power flows for purposes of this Agreement, except as provided in Article 7.4 below. The check meters shall be subject at all reasonable times to inspection and examination by Connecting Transmission Owner or its designee. The installation, operation and maintenance thereof shall be performed entirely by Developer in accordance with Good Utility Practice.

  • Parameters In calculating the MtM Exposure for each Transaction, the following parameters are set on the Transaction Date: ▪ On-Peak Initial Xxxx Xxxxx ▪ Off-Peak/On-Peak Price Ratio ▪ Off-Peak Initial Xxxx Xxxxx ▪ MW-Measure: initial Capacity PLC Per Tranche ▪ On-Peak Estimated Energy Quantity Per MW-Measure for each of the twelve calendar months ▪ Off-Peak Estimated Energy Quantity Per MW-Measure for each of the twelve calendar months ▪ Number of awarded Tranches In calculating the MtM Exposure for each Transaction, the following parameters are set each Trading Day subsequent to the Transaction Date: ▪ On-Peak Forward Price ▪ Off-Peak Forward Price ▪ Current Capacity PLC Per Tranche ▪ On-Peak Estimated Energy Quantity ▪ Off-Peak Estimated Energy Quantity Process to Update the On-Peak Initial Mark Prices and Off-Peak Initial Mark Prices on a Daily Basis On each Trading Day subsequent to the Transaction Date, the Pricing Agent will contact four Reference Market-Makers to obtain price quotes for on-peak and off-peak energy for PJM Western Hub. The Pricing Agent may not rely upon quotes from Seller or any Affiliate of Seller. The updated mark for a month will be equal to the average mark for that month over all sources from which a quote is available. If a monthly quote is available from any source, only the monthly quote or monthly quotes shall be used. Where quotes provide a bid and ask, the average shall be used. Where a quote for an individual month is unavailable, but the month is quoted as part of a “packaged” quote (e.g., January 2011 is only available in the form of a January/February 2011 “packaged” quote or an annual quote): ▪ If the other month/months of the package quote is/are also unavailable, then the marks for all months of the package will be calculated by multiplying the packaged quote by the ratio of the corresponding month to the corresponding calculated package quote from the previous day. Example: There are no On-Peak quotes available on day X during the contract for July 2011 or August 2011. However, there is an On-Peak July/August 2011 packaged quote of $73.00/MWh available. The On-Peak marks from day X-1 for July 2011 and August 2011 were $73.50/MWh and $76.50/MWh respectively. The day X On-Peak mark for July 2011 is set at 73.00 * [73.50] / [( (73.50 * 352) + (76.50 * 336) ) / (352+336) ] = 73 * (73.50/ 74.97) = $71.57/MWh. The day X On-Peak mark for August 2011 is set at 73.00 * [76.50] / [( (73.50 * 352) + (76.50*336) ) / (352+336) ] = 73 * (76.50 / 74.97) = $74.49/MWh. ▪ If the other month/months of the package quote is/are available, then the mark for the month will be set such that the average of the month and the other month(s) (weighted for either the On-Peak Hours or Off-Peak Hours as applicable) equals the packaged quote (see calculation example below).

  • Meters 7.1.1 For installation of Meters, Meter testing, Meter calibration and Meter reading and all matters incidental thereto, the SPD and SECI shall follow and be bound by the Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006, the Grid Code, as amended and revised from time to time.

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Dimensions Education: Bachelor’s or Master’s Degree in Computer Science, Information Systems, or other related field. Or equivalent work experience. Experience: A minimum of 10 years of IT (including Web/Internet, database applications and data warehousing) and business/industry work experience, with at least 3 years of leadership experience in managing multiple, large, cross-functional teams or project, and influencing senior level management and key stakeholders.

  • Workloads (a) The parties agree that patient care is enhanced if concerns relating to professional practice, patient acuity, fluctuating Work-Loads and fluctuating staffing are resolved in a timely and effective manner.

  • Overbuilds Sprint will not provide non-discriminatory access to FTTH Loop or FTTC Loop on an unbundled basis when Sprint has deployed a FTTH Loop or FTTC Loop parallel to, or in replacement of, an existing loop facility, except that:

  • Outputs 11. The objectives and outcomes of this Agreement will be achieved by:

  • Grades At the end of each semester, students shall receive a final grade report that shall become a part of their permanent record. The College District’s grading system shall apply to all courses: A (90-100) - Excellent B (80-89) - Good C (70-79) - Average D (60-69) - Poor F (Below 60) - Failure I Incomplete Q Dropped W Dropped Due to Good Cause or Withdrawal from College CR Credit P Pass NP Not Passing FS Academic Fresh Start I - Incomplete: indicates that the coursework was incomplete because of serious illness or other justified emergency. The instructor shall change the grade of “I” to a grade based on the work completed for the course in addition to the work specified in the course completion contract. All incomplete work shall be completed within 90 days of the start of the next long semester. Failure to complete the work specified in the course completion contract shall result in a grade of zero, which shall be factored into the final grade calculation with appropriate weighting relative to other course grades.

Time is Money Join Law Insider Premium to draft better contracts faster.