Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, the following number of sets of review documents at the required review stages: Schematic Design: 5 (1/2 size) sets with narratives Design Development: 5 (1/2 size) sets for 25% and 100% with specifications Construction Documents: 5 (1/2 size) sets for 25%, 50% & 75% 100% with specifications Construction Documents: 5 (1/2 size) sets for 100% complete with specifications The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. Firm/Position Classification Hourly Billing Rate Architecture EYP Inc. Principal $ 195-310 Associate Principal 145-220 Project Manager 145-220 Project Architect I 195-310 Project Architect II 145-222 Project Designer 195-310 Project Designer 195-310 Senior Lab Planner 250 Lab Planner 145-220 Construction Administrator 145-220 Intern Architect 75-130 BIM/CADD Technician 75-130 Administrative Staff 55-110 Co Architecture O’Xxxxxxx Xxxxxxxxx Principal $ 200 Associate Principal Project Manager 160 Project Architect I 155 Project Architect II Project Designer 105 Construction Administrator 130 Intern Architect 90 BIM/CADD Technician 90 Administrative Staff 70 MEP Engineering O’Xxxxxxx Xxxxxxxxx Principal $ 220 Project Manager 160 Senior Engineer 175 Engineer 165 Engineering Designer 115 Construction Administrator 130 BIM/CADD Technician 90 Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC Principal $ 205 Project Manager 176 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Administrator 105 BIM/CADD Technician 93 Administrative Staff 66 Structural Engineering Datum Xxxx, LLC Senior Principal $ 255.00 Principal $ 185.00 Senior Project Manager $ 160.00 Project Manager $ 145.00 Project Engineer $ 115.00 Graduate Engineer $ 100.00 Senior Production Manager $ 150.00 Senior Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 Civil Engineering Xxxxxxx Engineering & Surveying Co., Inc. Principal $ 200 Associate Principal 175 Senior Project Manager 175 Project Manager 150 Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering Designer 100 Construction Administrator 120 BIM/CADD Technician 90 Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Principal – Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75/day Research 50 Administrative Staff 60 Landscape Architecture Xxxxxxx & Associates Principal $ 160 Landscape Architect 125 Administrative Staff 50 Data/Telecommunications Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Acoustical/Audio-Visual Consultant 4b Technology Group Principal $195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Security Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Senior Designer $ 100.00 BIM/CADD Technician $ 85.00 Administrative Staff $ 60.00 EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Project Number: Brief Project Description: Additional Project Information: Construction Delivery Method: Project Schedule/Phases/Milestones: Include BIM milestones, pre-design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring Design Reviews Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Interference Check Detect problems in the model where two building components are clashing including soft and hard Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model Structural Model Mechanical Model Plumbing Model Fire Sprinkler Model Electrical Model Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). Measurement and Coordinate System Describe the measurement system and coordinate system used. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTS

Appears in 1 contract

Samples: assets.system.tamus.edu

AutoNDA by SimpleDocs

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, the following number of sets of review documents at the required review stages: Schematic Design: 5 (1/2 size3) ½ size sets with narratives Design Development: 5 (1/2 size3) ½ size sets for 25% and 100% with specifications Construction Documents: 5 (1/2 size) sets for 25%, 50% & 75% 100% with specifications complete Construction Documents: 5 (1/2 size3) ½ size sets for 100% complete with specifications The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. FirmFU irm/Position Classification Hourly Architecture (Perkins&Will) UHourly Billing Rate Architecture EYP Inc. Principal $ 195-310 Associate Principal 145-220 $300.00 Project Manager 145-220 $220.00 Technical Coordinator $220.00 Senior Interior Designer $180.00 Project Architect I 195-310 $120.00 Administrative Staff $ 80.00 MEP Engineering (Xxxx Xxxxx & Associates) Principal $268.00 Project Architect II 145-222 Project Designer 195-310 Project Designer 195-310 Manager $190.00 Senior Lab Planner 250 Lab Planner 145-220 Construction Administrator 145-220 Intern Architect 75-130 Engineer $190.00 Engineer $169.00 BIM/CADD Technician 75-130 $124.00 Administrative Staff 55-110 Co Architecture O’Xxxxxxx Xxxxxxxxx $ 89.00 Structural Engineering (Xxxxxx X. Xxxxx) Principal $ 200 Associate Principal $340.00 Senior Project Manager 160 Project Architect I 155 Project Architect II Project Designer 105 Construction Administrator 130 Intern Architect 90 $260.00 Engineer $140.00 Graduate Engineer $120.00 BIM/CADD Technician 90 $130.00 Administrative Staff 70 MEP Engineering O’Xxxxxxx Xxxxxxxxx Principal $ 220 Project Manager 160 Senior Engineer 175 Engineer 165 Engineering Designer 115 Construction Administrator 130 BIM/CADD Technician 90 Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC Principal $ 205 Project Manager 176 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Administrator 105 BIM/CADD Technician 93 Administrative Staff 66 Structural Engineering Datum Xxxx, LLC Senior Principal $ 255.00 Principal $ 185.00 Senior Project Manager $ 160.00 Project Manager $ 145.00 Project Engineer $ 115.00 Graduate Engineer $ 100.00 Senior Production Manager $ 150.00 Senior Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 Civil Engineering Xxxxxxx Engineering & Surveying Co., Inc. Principal $ 200 Associate Principal 175 Senior Project Manager 175 Project Manager 150 Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering Designer 100 Construction Administrator 120 BIM/CADD Technician 90 Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Principal – Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75/day Research 50 Administrative Staff 60 Landscape Architecture Xxxxxxx & Associates Principal $ 160 Landscape Architect 125 Administrative Staff 50 80.00 Data/Telecommunications Consultant 4b Technology Group (DataCom Group) Principal $ 195 Project Manager 185 $198.00 Senior Consultant 165 $160.00 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Acoustical/Audio-Visual Consultant 4b Technology Group Principal $195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Security Consultant 4b Technology Group Principal 138.00 Contract Administrator $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Senior Designer $ 100.00 98.00 BIM/CADD Technician $ 85.00 67.00 Administrative Staff $ 60.00 58.00 Life Safety Consultant (Xxxxxx Xxxxxx & Associates) Principal $300.00 Director $250.00 Senior Consultant $220.00 Consultant $190.00 Contract Administrator $140.00 Administrative Staff $110.00 _ EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Project Number: Brief Project Description: Additional Project Information: Construction Delivery Method: Project Schedule/Phases/Milestones: Include BIM milestones, pre-design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring Design Reviews Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Interference Check Detect problems in the model where two building components are clashing including soft and hard Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model Structural Model Mechanical Model Plumbing Model Fire Sprinkler Model Electrical Model Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). Measurement and Coordinate System Describe the measurement system and coordinate system used. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTS

Appears in 1 contract

Samples: assets.system.tamus.edu

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, the following number of sets of review documents at the required review stages: Schematic Design: 5 (1/2 size) 8 sets with narratives Design Development: 5 (1/2 size) 8 sets for 25% and 100% with specifications Construction Documents: 5 (1/2 size) 2 sets for 25%, 50% & 75% 100% with specifications complete Construction Documents: 5 (1/2 size) 8 sets for 100% complete with specifications The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. Firm/Position Classification Hourly UHourly Billing Rate Architecture EYP Inc. - Xxxxxxxx Xxxxxxxx Principal $ 195-310 Associate Principal 145-220 $250.00 Project Manager 145-220 $160.00 Project Architect I 195-310 Project Architect II 145-222 $160.00 Project Designer 195-310 Project Designer 195-310 Senior Lab Planner 250 Lab Planner 145-220 $160.00 Job Captain $150.00 Construction Administrator 145-220 $160.00 Intern Architect 75-130 $120.00 Accounting $130.00 Clerical $80.00 MEP Engineering - Xxxxx*DBR Principal $240.00 Project Manager $180.00 Senior Engineer $180.00 Engineer $140.00 Construction Administrator $110.00 BIM/CADD Technician 75-130 $65.00 Administrative Staff 55-110 Co Architecture O’Xxxxxxx Xxxxxxxxx $60.00 Structural Engineering - XXX Xxxxx Principal $ 200 Associate Principal Project Manager 160 Project Architect I 155 Project Architect II Project Designer 105 $200.00 Senior Engineer $150.00 Engineer $100.00 Senior CAD Drafter $90.00 Construction Administrator 130 Intern Architect 90 $75.00 BIM/CADD Technician 90 $75.00 Administrative Staff 70 MEP Engineering O’Xxxxxxx Xxxxxxxxx $50.00 Cost Consultant - Project Cost Resources Principal $ 220 Project Manager 160 $180.00 Senior Engineer 175 Engineer 165 Engineering Designer 115 Construction Administrator 130 BIM/CADD Technician 90 Estimator $145.00 Estimator $100.00 Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC Principal $ 205 Project Manager 176 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Administrator 105 BIM/CADD Technician 93 Administrative Staff 66 Structural Engineering Datum Xxxx, LLC Senior Principal $ 255.00 Principal $ 185.00 Senior Project Manager $ 160.00 Project Manager $ 145.00 Project Engineer $ 115.00 Graduate Engineer $ 100.00 Senior Production Manager $ 150.00 Senior Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 Civil Engineering Xxxxxxx Engineering & Surveying Co., Inc. Principal $ 200 Associate Principal 175 Senior Project Manager 175 Project Manager 150 Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering Designer 100 Construction Administrator 120 BIM/CADD Technician 90 Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Principal – Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75/day Research 50 Administrative Staff 60 Landscape Architecture Xxxxxxx & Associates Principal $ 160 Landscape Architect 125 Administrative Staff 50 Data/Telecommunications Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Acoustical/Audio-Visual Consultant 4b Technology Group Principal $195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Security Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Senior Designer $ 100.00 BIM/CADD Technician $ 85.00 Administrative Staff $ 60.00 80.00 EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Project Number: Brief Project Description: Additional Project Information: Construction Delivery Method: Project Schedule/Phases/Milestones: Include BIM milestones, pre-design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring Design Reviews Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Interference Check Detect problems in the model where two building components are clashing including soft and hard Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model Structural Model Mechanical Model Plumbing Model Fire Sprinkler Model Electrical Model Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). Measurement and Coordinate System Describe the measurement system and coordinate system used. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTS

Appears in 1 contract

Samples: assets.system.tamus.edu

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, the following number of sets of review documents at the required review stages: Schematic Design: 5 (1/2 size2) ½ size and (1) full size sets for 100% complete with narratives Design Development: 5 (1/2 size2) sets for 25% ½ size and 100% with specifications Construction Documents: 5 (1/2 size1) sets for 25%, 50% & 75% 100% with specifications Construction Documents: 5 (1/2 size) full size sets for 100% complete with specifications Construction Documents: (2) ½ size and (1) full size sets for 50% complete with specifications Construction Documents: (2) ½ size and (1) full size sets for 100% complete with specification The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. FirmFU irm/Position Classification Hourly UHourly Billing Rate Architecture EYP Populous, Inc. Senior Principal $ 195-310 Associate $445.00 Principal 145-220 – Senior Architect $310.00 Sr. Project Manager 145-220 $250.00 Project Manager $200.00 Sr. Project Architect I 195-310 $250.00 Project Architect II 145-222 $200.00 Sr. Project Designer 195-310 $250.00 Project Designer 195-310 $200.00 Architecture Designer III $155.00 Architecture Designer II $140.00 Architecture Designer I $120.00 Senior Lab Planner 250 Lab Planner 145-220 Interior Designer $220.00 Interior Designer $150.00 Interior Designer III $140.00 Interior Designer II $125.00 Interior Designer I $110.00 Senior Graphic Designer $165.00 Graphic Designer $140.00 Graphic Designer II $125.00 Graphic Designer I $110.00 Specification Writer $200.00 Intern Architect $ 65.00 Administrative Staff $110.00 MEP Engineering Xxxxx/DBR Principal $240.00 Project Manager $180.00 Senior Engineer $180.00 Engineer $140.00 Graduate Engineer $110.00 Engineering Designer $110.00 Construction Administrator 145-220 Intern Architect 75-130 $110.00 BIM/CADD Technician 75-130 $ 65.00 Administrative Staff 55-110 Co Architecture O’Xxxxxxx Xxxxxxxxx $ 60.00 Structural Engineering Xxxxxxxx Xxxxx Principal $ 200 $300.00 Associate Principal Senior Project Manager 160 $200.00 Project Architect I 155 Project Architect II Project Manager $160.00 Senior Engineer $150.00 Engineer $130.00 Graduate Engineer $110.00 Engineering Designer 105 Construction Administrator 130 Intern Architect 90 $ 90.00 BIM/CADD Technician 90 $110.00 Administrative Staff 70 MEP $ 80.00 Civil Engineering O’Xxxxxxx Xxxxxxxxx Innovative Engineering Solutions Principal $ 220 $210.00 Project Manager 160 $195.00 Senior Engineer 175 $180.00 Engineer 165 $165.00 Graduate Engineer $165.00 Engineering Designer 115 Construction Administrator 130 $ 95.00 BIM/CADD Technician 90 $ 95.00 Administrative Staff 70 Co MEP Engineering CNG Engineering$ 75.00 Landscape Architecture Populous, PLLC Inc. Principal / Sr. Landscape Architect $250.00 Landscape Architect $165.00 Landscape Designer II $120.00 Landscape Designer I $110.00 Administrative Staff $110.00 Cost Consultant Project Cost Resources Principal $190.00 Senior Estimator $136.00 Estimator $ 205 70.00 Data/Telecommunications Consultant Xxxxx/DBR Principal $240.00 Project Manager 176 $180.00 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Consultant $155.00 Designer 115 Engineer Designer 93 Construction $130.00 Contract Administrator 105 $110.00 BIM/CADD Technician 93 $ 65.00 Administrative Staff 66 Structural Engineering Datum Xxxx, LLC Senior Principal $ 255.00 Principal $ 185.00 Senior Project Manager $ 160.00 Project Manager $ 145.00 Project Engineer $ 115.00 Graduate Engineer $ 100.00 Senior Production Manager $ 150.00 Senior Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 Civil Engineering Xxxxxxx Engineering & Surveying Co., Inc. Principal $ 200 Associate Principal 175 Senior Project Manager 175 Project Manager 150 Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering Designer 100 Construction Administrator 120 BIM/CADD Technician 90 Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Principal – Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75/day Research 50 Administrative Staff 60 Landscape Architecture Xxxxxxx & Associates Principal $ 160 Landscape Architect 125 Administrative Staff 50 Data/Telecommunications Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 60.00 Acoustical/Audio-Visual Consultant 4b Technology Group Xxxxx/DBR Principal $195 240.00 Project Manager 185 $180.00 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Security Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Senior $155.00 Designer $ 100.00 $130.00 Contract Administrator $110.00 BIM/CADD Technician $ 85.00 65.00 Administrative Staff $ 60.00 Geotechnical Engineer Xxxxxxx Engineering Principal $200.00 Laboratory Consultant $ 48.00 Laboratory Design Engineer $135.00 Technical Coordinator $135.00 Laboratory Programmer $135.00 Laboratory Designer $ 48.00 Production Coordinator $ 60.00 BIM/CADD Technician $ 60.00 Technical Writer $ 60.00 Administrative Staff $ 60.00 Security Consultant Xxxxx/DBR Principal $240.00 Project Manager $180.00 Project Engineer $140.00 BIM/CADD Technician $ 65.00 Administrative Staff $ 60.00 EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Project Number: Brief Project Description: Additional Project Information: Construction Delivery Method: Project Schedule/Phases/Milestones: Include BIM milestones, pre-design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring Design Reviews Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Interference Check Detect problems in the model where two building components are clashing including soft and hard Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model Structural Model Mechanical Model Plumbing Model Fire Sprinkler Model Electrical Model Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). Measurement and Coordinate System Describe the measurement system and coordinate system used. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTS

Appears in 1 contract

Samples: assets.system.tamus.edu

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, the following number of sets of review documents at the required review stages: Schematic Design: 5 (1/2 25% 2 – ½ size 50% 2 – ½ size 75% 2 – ½ size 100% 7 – ½ size) , 2 full-size, 9 sets with narratives outline specifications Design Development: 5 (1/2 size) sets for 25% and 2 – ½ size 50% 2 – ½ size 75% 2 – ½ size 100% with 7 - ½ size, 2 full-size, 9 sets specifications Construction Documents: 5 (1/2 Documents 25% 2 – ½ size) , 2 sets for 25%, specifications 50% & 4 – ½ size, 4 sets specifications 75% 2 – ½ size, 2 sets specifications 100% with specifications Construction Documents: 5 (1/2 8 – ½ size) , 6 full-size, 14 sets for 100% complete with specifications The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. FirmUFirm/Position Classification Hourly UHourly Billing Rate Architecture EYP Inc. – VAI Architects Principal $ 195-310 $225.00/hour Associate Principal 145-220 $200.00/hour Project Manager 145-220 $190.00/hour Project Architect I 195-310 $165.00/hour Project Architect II 145-222 $150.00/hour Project Designer 195-310 Project Designer 195-310 Senior Lab Planner 250 Lab Planner 145-220 $120.00/hour Construction Administrator 145-220 $150.00/hour Intern Architect 75-130 $110.00/hour BIM/CADD Technician 75-130 $80.00/hour Administrative Staff 55-110 Co $55.00/hour Design Architecture O’Xxxxxxx Xxxxxxxxx – Xxxx Architects Principal $ 200 $225.00/hour Associate Principal $200.00/hour Project Manager 160 $190.00/hour Project Architect I 155 $165.00/hour Project Architect II $150.00/hour Project Designer 105 $120.00/hour Construction Administrator 130 $150.00/hour Intern Architect 90 $110.00/hour BIM/CADD Technician 90 $80.00/hour Administrative Staff 70 $55.00/hour MEP Engineering O’Xxxxxxx Xxxxxxxxx – CCRD Engineering Principal $ 220 $195.00/hour Associate Principal $155.00/hour Senior Associate $155.00/hour Associate $135.00/hour Senior Engineer $110.00/hour Engineer $100.00/hour Senior Designer $100.00/hour Designer $100.00/hour CAD Operator $65.00/hour Administrative $65.00/hour Structural Engineering - JQ Infrastructure Engineering Partner $240.00/hour Principal $210.00/hour Senior Project Manager 160 $175.00/hour Engineering Technical Lead $190.00/hour Project Manager $155.00/hour Senior Project Engineer 175 $135.00/hour Project Engineer 165 $120.00/hour Senior Technician $110.00/hour Technician $90.00/hour Administrative $75.00/hour Civil Engineering - Xxxxxxx Xxxx Engineering Principal $225.00/hour Associate Principal $190.00/hour Senior Project Manager $140.00/hour Project Manager $120.00/hour Project Coordinator $120.00/hour Project Engineer $95.00/hour Senior Technician $110.00/hour Design Technician $80.00/hour Technician $75.00/hour Research Manager $70.00/hour Technical Assistant $50.00/hour Landscape Architecture - Xxxxxxx and Associates Partner Landscape Architect I $160.00/hour Partner Landscape Architect II $140.00/hour Principal Landscape Architect III $125.00/hour Landscape Designer 115 Construction I $100.00/hour Landscape Designer II $75.00/hour CADD Draftsman $75.00/hour Clerical $50.00/hour Cost Consultant - Xxxxx Program Management Principal $195.00/hour Senior Estimator $175.00/hour Jr. Estimator / Quantity Surveyor $145.00/hour Administrative Staff $75.00/hour Data/Telecom/ AV/ Security Consultant -Datacom Design Group Principal $190.00/hour Associate Principal $180.00/hour Senior Project Manager $170.00/hour Senior Technology Consultant $145.00/hour Technology Consultant $124.00/hour Contract Administrator 130 $98.00/hour BIM/CADD Technician 90 Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC Principal $ 205 Project Manager 176 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Administrator 105 BIM$65.00/CADD Technician 93 Administrative Staff 66 Structural Engineering Datum Xxxx, LLC Senior Principal $ 255.00 Principal $ 185.00 Senior Project Manager $ 160.00 Project Manager $ 145.00 Project Engineer $ 115.00 Graduate Engineer $ 100.00 Senior Production Manager $ 150.00 Senior Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 Civil Engineering Xxxxxxx Engineering & Surveying Co., Inc. Principal $ 200 Associate Principal 175 Senior Project Manager 175 Project Manager 150 Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering Designer 100 Construction Administrator 120 BIMhour Clerical / Accounting $56.00/CADD Technician 90 Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Principal – Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75/day Research 50 Administrative Staff 60 Landscape Architecture Xxxxxxx & Associates Principal $ 160 Landscape Architect 125 Administrative Staff 50 Data/Telecommunications Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Acoustical/Audio-Visual Consultant 4b Technology Group Principal $195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Security Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Senior Designer $ 100.00 BIM/CADD Technician $ 85.00 Administrative Staff $ 60.00 hour EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Project Number: Brief Project Description: Additional Project Information: Construction Delivery Method: Project Schedule/Phases/Milestones: Include BIM milestones, pre-design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring Design Reviews Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Interference Check Detect problems in the model where two building components are clashing including soft and hard Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model Structural Model Mechanical Model Plumbing Model Fire Sprinkler Model Electrical Model Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). Measurement and Coordinate System Describe the measurement system and coordinate system used. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTSBY

Appears in 1 contract

Samples: assets.system.tamus.edu

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, the following number of sets of review documents at the required review stages: Schematic Design: 5 (1/2 size) 13 sets with narratives Design Development: 5 (1/2 size) 15 sets for 25% and 100% with specifications Construction Documents: 5 (1/2 size) 17 sets for 25%, 50% & 7590% 100% with specifications complete Construction Documents: 5 (1/2 size) 17 sets for 100% complete with specifications The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. FirmUFirm/Position Classification Hourly UHourly Billing Rate Architecture EYP Inc. PBK Architects, Inc Partner $310 Principal $ 195-310 $275 Associate Principal 145-$240 Project Manager/ Associate $220 Project Manager 145-220 Project Architect I 195-310 Project Architect II 145-222 Project Designer 195-310 Project Designer 195-310 Senior Lab Planner 250 Lab Planner 145-220 Construction Administrator 145-220 $200 Intern Architect 75-130 BIM/CADD Technician 75-130 Administrative Staff 55-110 Co Architecture O’Xxxxxxx Xxxxxxxxx Principal $ 200 Associate Principal Project Manager 160 Project Architect I 155 Project Architect II Project Designer 105 Construction Administrator 130 Intern Architect 90 BIM/CADD Technician 90 Administrative Staff 70 $120 Field $115 Office _$85 MEP Engineering O’Xxxxxxx Xxxxxxxxx Principal $ 220 Project Manager 160 Senior Engineer 175 Engineer 165 Engineering Designer 115 Construction Administrator 130 BIM/CADD Technician 90 Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC Principal $ 205 Project Manager 176 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Administrator 105 BIM/CADD Technician 93 Administrative Staff 66 Structural Engineering Datum Xxxx, LLC Senior Principal $ 255.00 Principal $ 185.00 Xxxxx*DBR Partner $210 Senior Project Manager $ 160.00 $180 Project Manager $ 145.00 $170 Senior Engineer $160 Engineer / Sr. Designer $120 Senior Technology Designer $140 Technology Designer $130 Commissioning Agent $120 Senior Construction Administrator $120 Construction Administrator $100 Sustainability Advisor $110 Designer $110 CAD Operator $65 Administrative $60 Structural Engineering Intelligent Engineering Services Principal / Managing Partner $210 Project Manager $195 Senior Project Engineer $ 115.00 Graduate $180 Project Engineer $ 100.00 Senior Production Manager $ 150.00 Senior $165 Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 / CAD Operator $95 Administrative $75 Civil Engineering Xxxxxxx Engineering & Surveying Co., Inc. Principal $ 200 Associate Principal 175 Xxxxxx- Xxxx Analyst $105-$175 Professional $160-$210 Senior Project Manager 175 Project Manager 150 Professional I $240-$265 Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering Designer 100 Construction Administrator 120 BIM/CADD Technician 90 Administrative Professional II $180-$250 Support Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Principal – Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 $75-$115 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75/day Research 50 Administrative Staff 60 Technical Support $115-$190 Technical Support $70-$100 Landscape Architecture Xxxxxxx & Associates Principal $ 160 Landscape Architect 125 Administrative Xxxxxx Xxxxx Xxxxx Design Principals- Xxxxx $165 Principals- Xxxxx $165 Other Staff 50 Data/Telecommunications Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Acoustical/Audio-Visual Consultant 4b Technology Group Principal $195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Security Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Senior Designer $ 100.00 BIM/CADD Technician $ 85.00 Administrative Staff $ 60.00 EXHIBIT B 50-$100 BIM Execution Plan DEVELOPED BY (Name and Company) Xxxxx Xxxxxx, PBK Architects PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Academic and Xxxxxxxxxxxxxx Xxxxxxxx Xxxxx 0 Project Number: 25-3255 (TAMU System Project Number) / 18101 (PBK project Number) Brief Project Description: The Academic and Administration Building - Phase I located on the Texas A&M University-San Antonio Campus is proposed to provide approximately 45,500 gross square feet of space. Future phases are projected for this building but are as yet unfunded and the scope of those phases is not known beyond general academic instruction and administrative functions. The scope of this project includes lecture spaces, classrooms a 100 seat lecture hall, Art studios, an incubator classroom and faculty and administration offices. The building has been identified in the recently completed campus master plan to be located just south of the existing Central Academic Building on the northeast corner of the future “quad.” Additional Project Information: Construction Delivery Method: XXXX Project Schedule/Phases/Milestones: Include BIM milestones, pre-design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design March 27th, 2018 July 11th, 2018 Arch, MEP, Struct, Landscape, Owner Design Development August 8th, 2018 November 7th, 2018 Arch, MEP, Struct, Landscape, Owner Construction Documents November 20, 2018 March 27th, 2019 Arch, MEP, Struct, Landscape, Owner Facility Data Review August 8th, 2018 March 27th, 2019 Arch, MEP, Struct, Landscape, Owner Construction May 27th, 2019 July 1st, 2020 Arch, MEP, Struct, Landscape, Owner KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone PBK Architects Xxxxx Xxxxxx BIM Coordinator/ Visualization Specialist San Antonio, Texas xxxxx.xxxxxx@xxx.xx m 210-829- 0123 Intelligent Engineering Services Xxxxxxxx Xxxxxx Production Manager San Antonio, Texas mmendez@ie- xxxxxxxx.xxx 210-349- 9098 Xxxxx*DBR Xxxxxxxx Xxxxxxx BIM Manager Houston, Texas wramirez@jonesdbr.c om 713-914- 4333 BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions - Architectural will use existing surveys, CADD plans, and site drawings to develop a model with existing conditions. The model will properly address true north and project north from an existing survey. Involves: Civil & Architectural Design Authoring - The design team will utilize Revit modeling to accurately depict the design through design documentation. This will involve all consultants, all discipline files will be linked and reviewed against each other. Design Reviews - Design reviews will be handled by either viewing the Revit model through views set up in Revit or through Lumion Review with a direct export of the Revit model. Involves: Architectural, Structural, MEP Space Tracking - Space Tracking will be handled by the Rooms & Spaces function of Revit and will be set up such that each space has the appropriate parameters to define function, general finishes, and MEP zones. Involves: Architectural & MEP Energy Analysis - The Architectural team will use Sefaira during the design process to test the efficiency of the design. Daylighting Analysis - The Architectural team will use Sefaira during the design process to evaluate daylighting in the building. Cost Estimation - In addition to the Contract Documents, General Square footages, linear square footages, and material schedules can be exported to provide tools for estimation to the Contractor. These exports can be used for an appropriate estimate but are not a stand in for the contract documents. Involves: Architectural, MEP, Structural 3D Coordination (design and construction) - During design the team will utilize Lumion for review preceding each milestone. This relies on all team members providing BIM models and appropriately linking all files. When construction begins less Lumion reviews will occur, but models will be linked and coordinated through Revit views. Additional review with Navisworks Manage will be provided immediately prior to the final deadline of each phase. Model Updates during Construction - Model updates should occur with clouding and revisions on sheets by each consultant. After updates are made all models with changes should be shared across all disciplines for review. Facilities Management Data - All disciplines will coordinate with the contractor as required to ensure that the COBie data extracted from all Revit files will be usable by the contractor for input into the FM software as required by Facilities Management. Record Modeling - The final models will be provided to the Contractor as necessary for Close-outs. These models will have all the revisions incorporated into them, but they will not qualify as the as-built model without further contractor review and revision. Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type All Design Documents All teams Every Friday Model Kick-off Meeting Main Model and Consultants Revit .rvt 2017 FTP All Design Documents All teams Each Milestone Deadline SD, DD, & CD submissions (all) Main Model and Consultants Revit .rvt 2017 FTP BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. All teams will use the appropriate Revit tools to account for the Calculation of Building Areas as outlined in the Facility Design Guidelines as it pertains to gross area, net assignable area, and unassignable area. The Revit model will include schedules which provide information about the rooms and will include these areas. These schedules will also include the appropriate naming of room numbers. All disciplines will coordinate with the contractor as required to ensure that the COBie data extracted from all Revit files will be usable by the contractor for input into the FM software. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed PBK Architects Lumion & Revit Once per milestone (each submission) Interference Check Detect problems in the model where two building components are clashing including soft and hard PBK Architects Navisworks Manage 100% DD 50% CD 90% CD Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) PBK Architects Revit Major Milestones (each submission) Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans PBK Architects Revit 50% CD 90% CD Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model "Campus Number - Project Number Abbreviated Project Name - A17.rvt" Structural Model " Campus Number - Project Number Abbreviated Project Name - S17.rvt" Mechanical Model " Campus Number - Project Number Abbreviated Project Name - M17.rvt" Plumbing Model " Campus Number - Project Number Abbreviated Project Name - P17.rvt" Fire Sprinkler Model " Campus Number - Project Number Abbreviated Project Name - F17.rvt" Electrical Model " Campus Number - Project Number Abbreviated Project Name - E17.rvt" Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). Each discipline will have their own model. Each of these models will contain the whole building and relevant site information. Should a building not fit on a sheet with notes at 1/8" scale then the drawing set will refer to different areas, however these areas will still remain in one model and work-set. The only other consideration for a separate model is site. If the building or scope requires an extensive site then a separate and linked Architectural site model will be required and maintained alongside the Architectural model. Measurement and Coordinate System Describe the measurement system and coordinate system used. Within Revit the team will locate the model at 0, 0. The location may then be set at the project address but the origin point will remain consistent across all linked models. The team will use imperial measurement with the following tolerances below. The model will also align with any available survey data and reference the same survey points to align true and project north. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents Architecture ACCURATE TO +/- [ # ] 1/16" OF ACTUAL SIZE AND LOCATION Shop Drawings Architecture ACCURATE TO +/- [ # ] 1/16" OF ACTUAL SIZE AND LOCATION Model Architecture ACCURATE TO +/- [ # ] 1/256" OF ACTUAL SIZE AND LOCATION Model Structure ACCURATE TO +/- 1/256" OF ACTUAL SIZE AND LOCATION Design Documents Structure ACCURATE TO +/- 1/256" OF ACTUAL SIZE AND LOCATION Shop Drawings Structure ACCURATE TO +/- 1/256" OF ACTUAL SIZE AND LOCATION Model MEP ACCURATE TO +/- 1/16" OF ACTUAL SIZE AND LOCATION Design Documents MEP ACCURATE TO +/- 1" OF ACTUAL SIZE AND LOCATION Shop Drawings MEP ACCURATE TO +/- 1/16" OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes Major Milestones BIM Models As needed Varies .rvt Upon Contractor Request TAMU Design Model Upon Approval for Construction April 26th, 2019 .rvt Delivered via E-Builder Design Close-out (Record Model) Post-Revisions - End of Construction August 1st, 2019 .rvt Not close-out model, for comparison against as- built models. ATTACHMENTS

Appears in 1 contract

Samples: Agreement

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, the following number of sets of review documents at the required review stages: Schematic Design: 5 (1/2 size) sets with narratives 1 set Design Development: 5 (1/2 size) sets for 25% and 100% with specifications 1 set Construction Documents: 5 (1/2 size) sets 1 set for 25%, 50% & 75% 100% with specifications complete Construction Documents: 5 (1/2 size) sets 1 set for 100% complete with specifications The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. FirmFU irm/Position Classification Hourly Architecture - Energy Architecture UHourly Billing Rate Architecture EYP Inc. Principal $ 195-310 Associate Principal 145-220 Project Manager 145-220 Project Architect I 195-310 Project Architect II 145-222 Project Designer 195-310 Project Designer 195-310 Senior Lab Planner 250 Lab Planner 145-220 Construction Administrator 145-220 Intern Architect 75-130 BIM/CADD Technician 75-130 Administrative Staff 55-110 Co Architecture O’Xxxxxxx Xxxxxxxxx Principal $ 200 Associate Principal Project Manager 160 Project Architect I 155 Project Architect II Project Designer 105 Construction Administrator 130 Intern Architect 90 BIM/CADD Technician 90 Administrative Staff 70 MEP Engineering O’Xxxxxxx Xxxxxxxxx Principal $ 220 Project Manager 160 Senior Engineer 175 Engineer 165 Engineering Designer 115 Construction Administrator 130 BIM/CADD Technician 90 Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC Principal $ 205 Project Manager 176 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Administrator 105 BIM/CADD Technician 93 Administrative Staff 66 Structural Engineering Datum Xxxx, LLC Senior Principal $ 255.00 Principal $ 185.00 $225.00 Senior Project Manager $ 160.00 $200.00 Project Manager $175.00 Senior Project Architect $140.00 Laboratory Planner $125.00 Project Architect $115.00 Intern Architect $ 145.00 Project Engineer 90.00 Administrative Staff $ 115.00 Graduate Engineer $ 100.00 Senior Production Manager $ 150.00 Senior Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 Civil 65.00 MEP Engineering Xxxxxxx Engineering & Surveying Co.– Xxxx Xxxxx and Associates, Inc. Principal $271.00 Project Manager $191.00 Department Head/Associate $191.00 Engineer, Design Coordinator/Const. Coord. $173.00 CAD Specialist/Designer $127.00 Clerical $ 200 91.00 Structural/Civil Engineering - Xxxxxxx Engineering Principal $200.00 Senior Engineer $160.00 Prof. Engineer / Land Surv. / CMT Manager / Survey Crew $135.00 Graduate Engineer II $105.00 Graduate Engineer I $ 80.00 Designer/ / Survey Tech $ 80.00 Clerical / Drafter / Drilling Manager $ 60.00 Landscape Architecture – TBD Principal $200.00 Landscape Architect $150.00 Administrative Staff $ 80.00 Cost Consultant – Vermeulens Principal $280.00 Associate Principal 175 $250.00 Associate Director $220.00 Senior Project Manager 175 $190.00 Project Manager 150 / Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering Designer 100 Construction Administrator 120 BIM/CADD Technician 90 Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Principal – Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75/day Research 50 Administrative Staff 60 Landscape Architecture Xxxxxxx & Associates Principal $ 160 Landscape Architect 125 Administrative Staff 50 Estimator / IT $160.00 Estimator / Support $130.00 Data/Telecommunications Consultant 4b Technology Group – Datacom Principal $ 195 $190.00 Associate Principal $180.00 Senior Project Manager 185 $170.00 Senior Technology Consultant 165 $145.00 Technology Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Acoustical/Audio-Visual Consultant 4b $124.00 Contract Administrator $ 98.00 Technology Group Principal $195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Security Consultant 4b Technology Group Principal Support $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy 65.00 Clerical / Accounting $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Senior Designer $ 100.00 BIM/CADD Technician $ 85.00 Administrative Staff $ 60.00 56.00 EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Project Number: Brief Project Description: Additional Project Information: Construction Delivery Method: Project Schedule/Phases/Milestones: Include BIM milestones, pre-design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring Design Reviews Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Interference Check Detect problems in the model where two building components are clashing including soft and hard Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model Structural Model Mechanical Model Plumbing Model Fire Sprinkler Model Electrical Model Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). Measurement and Coordinate System Describe the measurement system and coordinate system used. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTS

Appears in 1 contract

Samples: assets.system.tamus.edu

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, the following number of sets of review documents at the required review stages: Schematic Design: 5 (1/2 size) 4 ½ size sets with narratives Design Development: 5 (1/2 size) 4 ½ size sets for 25% and 100% with specifications Construction Documents: 5 (1/2 size) 4 ½ size sets for 25%, 50% & 75% 100% with specifications complete Construction Documents: 5 (1/2 size) 4 ½ size sets for 100% complete with specifications [SIGNATURES PROVIDED ON FOLLOWING PAGE] The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. FirmFU irm/Position Classification Hourly Architecture SmithGroup H ourly Billing Rate Architecture EYP Inc. Principal $ 195-310 Associate Principal 145-220 $205.00 Project Manager 145-220 Project Architect I 195-310 Project $150.00 Architect II 145-222 $105.00 Architect III $130.00 Project Designer 195-310 Project Designer 195-310 Senior Lab Planner 250 Lab Planner 145-220 $175.00 Construction Administrator 145-220 Intern Architect 75-130 $130.00 Administrative Staff $ 75.00 MEP Engineering SmithGroup Principal $205.00 Engineer II $120.00 Engineer III $150.00 Engineer IV $180.00 Engineering Designer II $ 95.00 Engineering Designer III $125.00 Administrative Staff $ 75.00 Structural Engineering JQ Infrastructure, LLC Partner $225.00 Engineering Technical Lead $195.00 Senior Project Manager $185.00 Project Manager $160.00 Senior Engineer $145.00 Engineer $130.00 Graduate Engineer $130.00 Senior Technician $115.00 BIM/CADD Technician 75-130 $ 95.00 Administrative Staff 55-110 Co Architecture O’Xxxxxxx Xxxxxxxxx $ 80.00 Civil Engineering Pacheko Xxxx Principal $ 200 $245.00 Associate Principal $210.00 Senior Project Manager 160 $170.00 Project Architect I 155 Project Architect II Project Manager $125.00 Senior Engineer $170.00 Engineer $100.00 Graduate Engineer $100.00 Engineering Designer 105 Construction Administrator 130 Intern Architect 90 $ 85.00 BIM/CADD Technician 90 $ 80.00 Administrative Staff 70 MEP Engineering O’Xxxxxxx Xxxxxxxxx $ 75.00 Landscape Architecture Xxxxxxx Xxxx Principal $245.00 Landscape Architect $100.00 Administrative Staff $ 220 75.00 Cost Consultant Project Manager 160 Cost Resources Principal $175.00 Senior Engineer 175 Engineer 165 Engineering Estimator $165.00 Estimator $ 90.00 Administrative Staff $ 50.00 Data/Telecommunications Consultant Datacom Design Group Principal $190.00 Associate $180.00 Senior Consultant $170.00 Consultant $145.00 Designer 115 Construction $124.00 Contract Administrator 130 $ 98.00 BIM/CADD Technician 90 $ 65.00 Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC Principal $ 205 Project Manager 176 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Administrator 105 BIM/CADD Technician 93 Administrative Staff 66 Structural Engineering Datum Xxxx, LLC Senior Principal $ 255.00 Principal $ 185.00 Senior Project Manager $ 160.00 Project Manager $ 145.00 Project Engineer $ 115.00 Graduate Engineer $ 100.00 Senior Production Manager $ 150.00 Senior Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 Civil Engineering Xxxxxxx Engineering & Surveying Co., Inc. Principal $ 200 Associate Principal 175 Senior Project Manager 175 Project Manager 150 Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering Designer 100 Construction Administrator 120 BIM/CADD Technician 90 Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Principal – Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75/day Research 50 Administrative Staff 60 Landscape Architecture Xxxxxxx & Associates Principal $ 160 Landscape Architect 125 Administrative Staff 50 Data/Telecommunications Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 56.00 Acoustical/Audio-Visual Consultant 4b Technology Datacom Design Group Principal $195 Project Manager 185 190.00 Associate Principal $180.00 Senior Consultant 165 $170.00 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Security Consultant 4b Technology Group Principal $145.00 Designer $124.00 Contract Administrator $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Senior Designer $ 100.00 98.00 BIM/CADD Technician $ 85.00 65.00 Administrative Staff $ 60.00 56.00 Security Consultant Datacom Design Group Principal $190.00 Associate Principal $180.00 Senior Consultant $170.00 Consultant $145.00 Designer $124.00 Contract Administrator $ 98.00 BIM/CADD Technician $ 65.00 Administrative Staff $ 56.00 EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Project Number: Brief Project Description: Additional Project Information: Construction Delivery Method: Project Schedule/Phases/Milestones: Include BIM milestones, pre-design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring Design Reviews Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Interference Check Detect problems in the model where two building components are clashing including soft and hard Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model Structural Model Mechanical Model Plumbing Model Fire Sprinkler Model Electrical Model Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). Measurement and Coordinate System Describe the measurement system and coordinate system used. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTS

Appears in 1 contract

Samples: assets.system.tamus.edu

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, the following number of sets of review documents at the required review stages: Schematic Design: 5 (1/2 size) sets with narratives Design Development: 5 (1/2 size) sets for 25% and 100% with specifications Construction Documents: 5 (1/2 size) sets for 25%, 50% & 75% 100% with specifications Construction Documents: 5 (1/2 size) sets for 100% complete with specifications as outlined in Exhibit C – Document Distribution Matrix. [SIGNATURES PROVIDED ON FOLLOWING PAGE] A/E -XXXX BIM Contract No. 5904 02/16 Project No. 23-3202 The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan EXHIBIT Ex C Document Distribution Matrix Exhibit A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this scheduleCompany Name Hourly Rate Abadi Accessibility $150.00 BRW Architects, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. Firm/Position Classification Hourly Billing Rate Architecture EYP Inc. Project Principal $ 195-310 $240.00 Project Director $200.00 Project Manager $175.00 Project Architect $140.00 Architect $120.00 Intern Architect I $90.00 Intern Architect II $75.00 Administrative Staff $70.00 DataCom Design Group Principal $170.00 Associate Principal 145-220 $160.00 Senior Project Manager 145-220 $152.00 Senior Technology Consultant $130.00 Technology Consultant $110.00 Contract Administration $85.00 Technology (CAD / BIM) $62.00 Clerical / Accounting $56.00 XxXxxxx Group, Inc. Principals $250.00 Professional, Technical & Clerical Salary x 2.5 Xxxxxxx Xxxxx Principal $192.50 Senior Estimator $180.00 Estimator $148.50 Administrative Staff $75.00 JQ Infrastructure, LLC Partner $240.00 Principal $210.00 Senior Project Manager $175.00 Engineering Technical Lead $190.00 Project Manager $155.00 Senior Project Engineer $135.00 Project Engineer $120.00 Senior Technician $110.00 Technician $90.00 Administrative $75.00 Xxxxxx Xxxxxx Principal $215.00 Project Manager $160.00 Project Architect I 195-310 $90.00 Project Architect II 145-222 $146.00 Project Designer 195-310 Project $123.00 Programmer / Planner $136.00 Interior Designer 195-310 Senior Lab Planner 250 Lab Planner 145-220 Construction Administrator 145-220 Intern Architect 75-130 BIM/CADD Technician 75-130 $124.00 Administrative Staff 55-110 Co Architecture O’Xxxxxxx Xxxxxxxxx $84.00 Xxxxxxx Xxxx Consulting Engineers, Inc. Engineering Services Principal $ 200 $225.00 Associate Principal Project Manager 160 Project Architect I 155 Project Architect II Project Designer 105 Construction Administrator 130 Intern Architect 90 BIM/CADD Technician 90 Administrative Staff 70 MEP Engineering O’Xxxxxxx Xxxxxxxxx Principal $ 220 Project Manager 160 Senior Engineer 175 Engineer 165 Engineering Designer 115 Construction Administrator 130 BIM/CADD Technician 90 Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC Principal $ 205 Project Manager 176 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Administrator 105 BIM/CADD Technician 93 Administrative Staff 66 Structural Engineering Datum Xxxx, LLC Senior Principal $ 255.00 Principal $ 185.00 $200.00 Director $200.00 Senior Project Manager $ 160.00 $150.00 Senior Project Coordinator $150.00 Project Manager $ 145.00 $120.00 Project Coordinator $120.00 Project Engineer $ 115.00 Graduate Engineer $ 100.00 Senior Production Manager $ 150.00 $95.00 Senior Technician $ 120.00 $110.00 Technician II $ 98.00 Technician $ 72.00 $80.00 Drafter $75.00 Research Manager $80.00 Technical Assistant $50.00 Executive Assistant $85.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 Civil Engineering Xxxxxxx Engineering & Administrative Assistant $80.00 Administrative Assistant $70.00 Expert Witness Testimony $350.00 Surveying Co., Inc. Principal $ 200 $225.00 Associate Principal 175 $200.00 Director $200.00 Senior Project Manager 175 $150.00 Senior Project Coordinator $150.00 Project Manager 150 $120.00 Project Coordinator $120.00 Project Surveyor $95.00 Survey Intern $90.00 Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering Designer 100 Construction Administrator 120 BIM/CADD Technician 90 $90.00 Technician $80.00 Drafter $75.00 Research Manager $80.00 Technical Assistant $50.00 Executive Assistant $85.00 Senior Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Principal – Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Assistant $80.00 Administrative Assistant $70.00 Expert Witness Testimony $350.00 Survey Field Crew (1-person) $95.00 Survey Field Crew (2-Man w/ GPSperson) 135 ATV $140.00 Survey Field Crew (All3-Terrain Vehicleperson) 75/day Research 50 Administrative Staff 60 Landscape Architecture Xxxxxxx $195.00 Survey Field Crew (4-person) $250.00 Xxxx Fire Protection Engineering President $175.00 Senior Designer $125.00 Designer $85.00 CAD Operator $60.00 Clerical $50.00 Xxxx Xxxxx & Associates Principal $ 160 Landscape Architect 125 Administrative Staff 50 Data/Telecommunications Consultant 4b Technology Group Principal $ 195 $263.00 Project Manager 185 Senior Consultant 165 Consultant 145 BIM$186.00 Department Head/Associate $186.00 Engineer, Design Coordinator, Construction Coordinator $161.00 CADD Technician 95 Administrative Staff 65 AcousticalSpecialist/Audio-Visual Consultant 4b Technology Group Designer $118.00 Clerical $85.00 SMR Landscape Architects, Inc. Principal Design / Administration $195 Project 220.00 Associate / RLA $200.00 Landscape Designer $175.00 Irrigation Designer $175.00 VOC Associates, LLC Sr. Vice President $130.00 Sr. Implementation Manager 185 Senior Consultant 165 Consultant 145 BIM$130.00 Equipment Planner $130.00 Procurement $90.00 Revit $100.00 TAMUS/CADD Technician 95 Administrative Staff 65 Security Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Senior Designer $ 100.00 BIM/CADD Technician $ 85.00 Administrative Staff $ 60.00 EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Project Number: Brief Project Description: Additional Project Information: Construction Delivery Method: Project Schedule/Phases/Milestones: Include BIM milestones, pre-design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring Design Reviews Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type FPC Review Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Interference Check Detect problems in the model where two building components are clashing including soft and hard Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model Structural Model Mechanical Model Plumbing Model Fire Sprinkler Model Electrical Model Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). Measurement and Coordinate System Describe the measurement system and coordinate system used. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTSDistribution Matrix

Appears in 1 contract

Samples: assets.system.tamus.edu

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, Refer to Exhibit C: Document Distribution Matrix for the following required number of sets of documents required for each review documents at the required review stages: Schematic Design: 5 (1/2 size) sets with narratives Design Development: 5 (1/2 size) sets for 25% and 100% with specifications Construction Documents: 5 (1/2 size) sets for 25%, 50% & 75% 100% with specifications Construction Documents: 5 (1/2 size) sets for 100% complete with specifications stage. The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan Ex C Document Distribution Matrix EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. FirmUFirm/Position Classification Hourly UHourly Billing Rate Architecture EYP Inc. – Huckabee Principal $ 195-310 / Executive $250.00 Project Architect / Associate Principal 145$200.00 BIM Specialist $150.00 Project Leader $80.00 Project Engineer $200.00 Quality Control $100.00 Structural Leader $100.00 Engineer-220 in-Training $80.00 Intern / Draftsman $60.00 Administrative Staff $45.00 Urban Planner $150.00 Public Relations Consultant $150.00 Construction Observer $100.00 Design Architecture – Xxxxx Sports Principal $300.00 Senior Designer $200.00 Project Manager 145-220 $160.00 Project Architect I 195-310 $130.00 Architect $110.00 Intern Architect $90.00 Interior Designer $100.00 MEP Engineering – Xxxxx DBR Partner $240.00 Project Architect II 145-222 Project Manager $185.00 Senior Engineer $185.00 Senior Technology Designer 195-310 Project $155.00 Engineer / Senior Designer 195-310 $140.00 Senior Lab Planner 250 Lab Planner 145-220 Construction Administrator 145-220 Intern Architect 75-130 BIM/$140.00 Technology Designer $130.00 Commissioning Agent $130.00 Quality Assurance / Quality Control $130.00 Construction Administrator $110.00 Sustainability Advisor $110.00 Designer (M, E, P) $110.00 CADD Technician 75-130 Operator $65.00 Administrative Staff 55-110 Co Architecture O’Xxxxxxx Xxxxxxxxx Principal $ 200 Associate Principal Project Manager 160 Project Architect I 155 Project Architect II Project Designer 105 Construction Administrator 130 Intern Architect 90 BIM/CADD Technician 90 Administrative Staff 70 MEP Engineering O’Xxxxxxx Xxxxxxxxx Principal $ 220 Project Manager 160 Senior Engineer 175 Engineer 165 Engineering Designer 115 Construction Administrator 130 BIM/CADD Technician 90 Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC Principal $ 205 Project Manager 176 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Administrator 105 BIM/CADD Technician 93 Administrative Staff 66 $60.00 Structural Engineering Datum Xxxx, LLC Senior – JQ + Tsen Partner $240.00 Principal $ 255.00 Principal $ 185.00 $210.00 Senior Project Manager $ 160.00 $175.00 Engineering Technical Lead $190.00 Project Manager $ 145.00 $155.00 Senior Project Engineer $ 115.00 Graduate $135.00 Project Engineer $ 100.00 Senior Production Manager $ 150.00 $120.00 Senior Technician $ 120.00 $110.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 $90.00 Administrative Staff $75.00 Civil Engineering Xxxxxxx Engineering & Surveying Co., Inc. Xxxx Principal $ 200 $225.00 Associate Principal 175 $200.00 Director $200.00 Senior Project Manager 175 $150.00 Senior Project Coordinator $150.00 Project Manager 150 $120.00 Project Coordinator $120.00 Project Engineer $95.00 Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering Technician $110.00 Technician $80.00 Drafter $75.00 Research Manager $80.00 Technical Assistant $50.00 Executive Assistant $85.00 Senior Administrative Assistant $80.00 Administrative Assistant $70.00 Expert Witness Testimony $350.00 Landscape Architecture – Xxxxxxx Xxxx Principal $225.00 Associate Principal $200.00 Director $200.00 Senior Project Manager $150.00 Project Manager $120.00 Project Landscape Architect $95.00 Landscape Designer 100 Construction Administrator 120 BIM/CADD Technician 90 $75.00 Drafter $75.00 Executive Assistant $85.00 Senior Administrative Assistant $80.00 Administrative Assistant $70.00 Expert Witness Testimony $350.00 Cost Consultant – Vermeleuns Principal $275.00 Associate Principal $245.00 Associate $215.00 Senior Project Manager $185.00 Senior Estimator $185.00 Estimator $125.00 Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Principal – Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75/day Research 50 Administrative Staff 60 Landscape Architecture Xxxxxxx & Associates Principal $ 160 Landscape Architect 125 Administrative Staff 50 $125.00 Data/Telecommunications Consultant 4b – Crux Technology Group + Security Design Project Principal $ 195 $150.00 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 $150.00 Quality Assurance $130.00 Design Support Services $130.00 Production / Drawing Support $90.00 Acoustical/Audio-Visual Consultant 4b Technology Group – BAi Principal $195 200.00 Technical Systems Specialist $150.00 Food Service Consultant – Xxxxx Design Solutions Project Administrator $175.00 Project Designer $155.00 Production Staff $125.00 Security Consultant – Crux Technology + Security Design Project Principal $150.00 Project Manager 185 $150.00 Quality Assurance $130.00 Design Support Services $130.00 Production / Drawing Support $90.00 Fire & Life Safety Consultant – Xxxxxx Xxxxxx Director / Operation Manager $230.00 Senior Fire Protection Engineer $215.00 Senior Consultant 165 $165.00 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Security $150.00 Fire Protection Engineer $150.00 Associate $135.00 Roofing Consultant 4b Technology Group – Rooftech Expert Witness $250.00 Principal $ 195 Engineer $150.00 Principal Architect $150.00 Senior Construction Consultant $150.00 Project Manager 185 Senior $150.00 Certified Infrared Themographer $150.00 Registered Roof Consultant 165 Consultant 145 BIM/$150.00 Laboratory Technician $125.00 CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager Designer I $115.00 CADD Designer II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Senior Designer $ $95.00 Contract Administrator $100.00 BIM/CADD Technician $ 85.00 Administrative Staff $ Registered Roof Observer $75.00 Full-Time Registered Roof Observer $75.00 Clerical / Report Processor $60.00 EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- cost‐ effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Memorial Stadium Renovation and Expansion Project Number: 04-3176 Brief Project Description: Additional Project Information: Construction Delivery Method: Competitive Sealed Proposal (CSP) Project Schedule/Phases/Milestones: See Attached Include BIM milestones, pre-design pre‐design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Existing Documentation May 12, 2016 May 25, 2016 Huckabee Planning / Programming May 12,2016 May 24,2016 Huckabee/Xxxxx/Owner Schematic Design May 25, 2016 July 29, 2016 Design Team Design Development July 29, 2016 October 14, 2016 Design Team SD/DD Coordination September 28, 2016 October 6, 2016 Design Team/Owner Construction Documents October 17, 2016 January 16, 2017 Design team Facility Data Review XXX XXX TBD Construction May 26,2017 July 2018 GC/Design Team/Owner KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone Huckabee Huckabee Xxxxx Sports Xxxxx DBR JQ+Xxxx Xxxxxxx Xxxx (Civil) Xxxxxxx Xxxx (Landscape) Crux (data) Crux (security) XXX Xxxxx Xxxxxx Xxxxxx Xxxxxxxxx Xxxx Xxxxxx Xxxx Xxxxxx Xxxxxxx Xxxxxxxx Xxxxx Xxxxx Xxxx Xxxxxx Xxxxxx Xxxxxxxx Xxxxxx Xxxxxxxx Xxxx Xxxxxxxxxx Xxxx Xxxxxxxxxx Xxxxxxx Xxxxx Xxxxx Xxxxx Chi Do Xxxxx Xxxxxxx Project Leader BIM Spec. Designer MEP Civil Landscape Tech Security Acoustical Food Service Fire/Life Safe Cost Est. Houston Houston Atlanta Houston Dallas Dallas Dallas Ft Worth Ft Worth Xxxxxx Xxxxxx Dallas S Antonio ggorham@huckabee‐xxx.xxx xxxxxxx@huckabee‐xxx.xxx XXxxxxxx@xxxxx.xxx XXxxxx@xxxxxx.xxx xxxxxxx@xxxxx.xxx xxxxxxxxx@xxxx.xxx xxxxxxxxx@xxxx.xxx xxxxxxxxxxx@xxxxxxxxxxxxx.xxx xxxxxxxxxxx@xxxxxxxxxxxxx.xxx xxxxxx@xxxxxxxxx.xxx xxxxx@xxxxxxxxxxx.xxx xxx@xxxxxxxxxxxx.xxx xxxxxxxx@xxxxxxxxxx.xxx BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions – Huckabee-BIM Specialist-Xxxx Xxxxxx Upon delivery of existing documentation to Huckabee, the BIM specialist will construct a Revit model of the existing conditions, to the extent required for the completion of the project. Conditions will be field verified and the finished existing model will be delivered to Xxxxx for use as a design background. Design Authoring Authoring-Xxxxx-TBD Design Reviews Concept in Sketchup can begin based on approximations of existing conditions. From multiple design concepts, one will be chosen to carry into Schematic Design. Schematic Design will be based on actual existing conditions. The Schematic Design may combine the use of Revit and Sketchup to adequately convey the design intent while assuring accuracy and constructability Design Reviews-Owner-TBD The owner and Xxxxx will review the SD for design intent while Huckabee will review the SD with Xxxxx for adequacy of information to proceed into Design Development. The SD will be accurately scaled with appropriate consideration for Structural and Mechanical design before moving into Design Development. Space Tracking Tracking-Xxxxx-TBD/Huckabee-Project Leader-Xxxx Xxxxxx At the end of SD, upon transition to DD, and at the completion of DD, the model will be reviewed to assure continuing adherence to the space program for the project. Energy Analysis Analysis-Xxxxx DBR Daylighting Analysis Analysis-Xxxxx DBR Cost Estimation Estimation-Vermeulens 3D Coordination (design and construction) construction)-Owner/Xxxxx/Huckabee Upon transition to DD, at the completion of DD, at 50% CD, and at any point a structural or mechanical issue impacts the design, the model will be reviewed to assure continuing adherence to the design intent. Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time One‐Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type Arch Existing documentation Huckabee Upon completion Revit V16 .rvt Arch‐ Design/Conceptual Xxxxx Every two weeks Sketchup Arch‐ Design/Schematic Xxxxx Every two weeks Sketchup Arch‐Design Development Huckabee Every week Revit BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Huckabee & Xxxxx Revit v2016 Daily Interference Check Detect problems in the model where two building components are clashing including soft and hard Huckabee Navisworks Bi‐weekly Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Huckabee Revit v2016; Bluebeam Weekly Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant non‐compliant elements and corrective action plans Huckabee Revit v2016 Weekly Other MODEL STRUCTURE File Naming Structure File Name Formatting <ProjectNumber>_<District>_<ProjectName>_<Discipline>_v16 Architectural Model 1754-01-01_TSU_MemorialStadiumReno_ARCH_v16 Structural Model 1754-01-01_TSU_MemorialStadiumReno_STRUC_v16 Mechanical Model 1754-01-01_TSU_MemorialStadiumReno_MECH_v16 Plumbing Model 1754-01-01_TSU_MemorialStadiumReno_PLUMB_v16 Fire Sprinkler Model 1754-01-01_TSU_MemorialStadiumReno_FIRE_v16 Electrical Model 1754-01-01_TSU_MemorialStadiumReno_ELEC_v16 Model Structure Describe and diagram how The single Architectural model will contain all architectural information, including interiors information as a part of the model is separated (buildingmodel. All other disciplines will be linked as separate models. The civil will be linked as a flattened CAD file, floorunless extreme site terrain warrants the development of a topographical surface. In that instance, zone, area and/or discipline)the topography would be included in the architectural model. Measurement and Coordinate System Describe the measurement system BIM Project Location by Project Address through Internet Mapping Service. Shared Coordinates to be defined in architectural model and coordinate system usedacquired by all consultant models. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] /‐ 1/8” OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] /‐ 1/8” OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- /‐ [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTSBIM models and CAD files coordination as required (max. weekly) .rvt v2016; .dwg v2016 ATTACHMENTS List any supporting information and attach. TAMUS/FPC Review Document Distribution Matrix

Appears in 1 contract

Samples: assets.system.tamus.edu

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, the following number of sets of review documents at the required review stages: documents defined in Exhibit C – Document Distribution Matrix. Schematic Design: 5 (1/2 size) sets with narratives Design Development: 5 (1/2 size) sets for 25% and 100% with specifications Construction Documents: 5 (1/2 size) sets for 25%, 50% & 75% 100% with specifications complete Construction Documents: 5 (1/2 size) sets for 100% complete with specifications [SIGNATURES PROVIDED ON FOLLOWING PAGE] The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan Ex C Document Distribution Matrix EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. FirmUF irm/Position Classification Hourly Billing Rate Architecture EYP Inc. - TreanorHL Principal $ 195-310 Associate Principal 145-220 in Charge $330 Principal/Project Manager 145-220 $250 Associate Principal/Project Architect I 195-310 Project Architect II 145-222 Project $190 Building Envelope Specialist $190 Interior Design Lead $170 Designer 195-310 Project Designer 195-310 Senior Lab Planner 250 Lab Planner 145-220 $150 Construction Administrator 145-220 $190 Intern Architect 75-130 $100 BIM/CADD Technician 75-130 $110 Administrative Staff 55-110 Co $105 Design Architecture O’Xxxxxxx Xxxxxxxxx - Xxxxx Saint Gross Principal $ 200 III $335 Principal II $300 Principal I $250 Project Director $215 Project Manager $190 Architect III $160 Architect II $135 Architect I $115 Planner III $160 Planner II $135 Planner I $115 Director of Graphics $185 Sr. Graphic Designer $135 Graphic Designer $95 Design Professional I $105 Emerging Professional $95 Student Intern $65 Specifications Writer II $195 Programmer III $170 Programmer II $125 Project Administrator $95 MEP Engineering - Xxxx Xxxxx & Associates Principal $271 Project Manager $191 Department Head/Associate $191 Engineer $173 Design Coordinator $173 Construction Coordinator $173 BIM Specialist/Designer $127 Administrative Staff $91 Structural Engineering - JQ Partner $260 Principal $225 Senior Project Manager $185 Project Manager $160 Senior Engineer $145 Engineering Technical Lead $195 Project Engineer $130 Senior Technician $125 Technician $95 Administrative Staff $80 Civil Engineering - JQ Partner $260 Principal $225 Senior Project Manager $185 Project Manager $160 Senior Engineer $145 Engineering Technical Lead $195 Project Engineer $130 Senior Technician $125 Technician $95 Administrative Staff $80 Senior Registered Professional Land Surveyor $180 Registered Professional Land Surveyor $130 Survey Crew (1 Person) $130 Survey Crew (2 Person) $170 Landscape Architecture - Xxxxxxx & Associates Partner Landscape Architect $160 Principal Landscape Architect $130 Project Manager Landscape Architect $115 Landscape Designer III $105 Landscape Designer II $95 Landscape Designer I $85 CADD Draftsman $75 Graphics/Administrative Staff $75 Cost Consultant - Vermeulens Principal $280 Associate Principal $250 Associate/Director $220 Senior Project Manager $190 Project Manager $160 Senior Estimator/IT $160 Estimator/Support $130 Data/Telecommunications/Security/AV/Acoustics/Vibration Consultant - 4B with SLR - 4B Data/Telecommunications/Security/AV Managing Principal $225 Project Architect I 155 Manager $185 Assistant Project Architect II Project Manager $165 Communications Designer 105 $165 A/V Designer $165 Revit Designer $140 Construction Administrator 130 Intern Architect 90 $140 [SLR Vibration/Acoustics] Principal Engineer/Scientist) $265 Senior Engineer/Scientist $240 Associate Engineer/Scientist $220 Project Engineer/Scientist $200 Staff Engineer/Scientist $185 Senior Technician $165 Technician $140 Staff Technician $120 Project Coordinator $100 Staff Assistant $70 Acoustics/Vibration Equipment Rate Schedule ($/Day) Type 1 Sound Level Meter/Analyzer $100 Type 2 Sound Level Meter $50 Sound Intensity Testing $140 Multi-Channel Data Acquisition System $500 TEF/Smaart Room Acoustics Testing $150 Sound System/Noise Source $75 Tapping Machine $250 Weather Monitoring Systems $50 High-temperature Microphone Probe $100 Pipe Noise Measurement System $100 Laboratory Consultant - TreanorHL Principal $330 Laboratory Programmer $170 Laboratory Designer $170 BIM/CADD Technician 90 $110 Specifications/Technical Writer $190 Administrative Staff 70 MEP Engineering O’Xxxxxxx Xxxxxxxxx $105 Environmental Wind Tunnel Testing - Ambient Air Technologies Principal $ 220 in Charge/Project Manager 160 Senior $150 Assistant Project Manager $100 Engineer 175 Engineer 165 Engineering Designer 115 Construction Administrator 130 BIM$125 Drafter/CADD Model Building $75 Technician 90 $75 Wind Tunnel and Equipment $2,500 (per day) Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC Principal $ 205 Project Manager 176 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Administrator 105 BIM/CADD Technician 93 Administrative Staff 66 Structural Engineering Datum Xxxx, LLC Senior Principal $ 255.00 Principal $ 185.00 Senior Project Manager $ 160.00 Project Manager $ 145.00 Project Engineer $ 115.00 Graduate Engineer $ 100.00 Senior Production Manager $ 150.00 Senior Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 Civil Engineering Xxxxxxx Engineering & Surveying Co., Inc. Principal $ 200 Associate Principal 175 Senior Project Manager 175 Project Manager 150 Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering Designer 100 Construction Administrator 120 BIM/CADD Technician 90 Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Principal – Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75/day Research $50 Administrative Staff 60 Landscape Architecture Xxxxxxx & Associates Principal $ 160 Landscape Architect 125 Administrative Staff 50 Data/Telecommunications Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Acoustical/Audio-Visual Consultant 4b Technology Group Principal $195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Security Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Consultant - Xxxx Xxxxxx, Elstner Associates Principal $290 Associate Principal $235 Senior Associate $205 Accessibility Consultant - Abadi Architect/principal consultant $150 Accounting $75 Administrative Assistant $50 Geotechnical Consultant - Terracon Principal $190 Senior Project Manager/Engineer $155 Project Manager/Engineer $125 Geotechnical Technician/Geologist $90 Signage and Wayfinding - FocusEGD Principal $190 Vice President/Project Manager $180 Associate Sr. Designer $ 100.00 BIM/CADD Technician $ 85.00 Administrative Staff $ 60.00 $120 Professional Designer $110 EXHIBIT B BIM Execution Plan The AE and XXXX teams have 30 days after the design kick-off meeting to develop and submit a unified BIM Execution Plan that reflects both teams responsibilities for delivering a BIM model. DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Project Number: Brief Project Description: Additional Project Information: Construction Delivery Method: Project Schedule/Phases/Milestones: Include BIM milestones, pre-design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring Design Reviews Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Interference Check Detect problems in the model where two building components are clashing including soft and hard Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model Structural Model Mechanical Model Plumbing Model Fire Sprinkler Model Electrical Model Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). Measurement and Coordinate System Describe the measurement system and coordinate system used. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTSATTACHMENTS List any supporting information and attach. TAMUS/FPC Review Document Distribution Matrix

Appears in 1 contract

Samples: assets.system.tamus.edu

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, the following number of sets of review documents at the required review stages: Schematic Design: 5 (1/2 size) sets with narratives Design Development: 5 (1/2 size) sets for 25% and 100% with specifications Construction Documents: 5 (1/2 size) sets for 25%Reference Exhibit C, 50% & 75% 100% with specifications Construction Documents: 5 (1/2 size) sets for 100% complete with specifications Document Distribution Matrix Redacted A/E -XXXX BIM Contract No.5922 02/16 Project No. 04-3191 The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan Ex C Document Distribution Matrix EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. U Firm/Position Classification U Architecture / Interior Design – Xxxxxxx+Will Hourly Billing Rate Architecture EYP Inc. Principal $ 195-310 $325/hr Associate Principal 145-220 $275/hr Project Manager 145-220 $240/hr Project Architect II $240/hr Project Architect I 195-310 Project Architect II 145-222 $205/hr Project Designer 195-310 $240/hr Senior Project Interior Designer 195-310 Senior Lab Planner 250 Lab Planner 145-220 $175/hr Project Interior Designer $120/hr Construction Administrator 145-220 $205/hr Intern Architect 75-130 $105/hr Arch III / Design III $170/hr Arch II / Design II $130/hr Arch I / Design I $120/hr Specifications Writer $240/hr BIM/CADD Technician 75-130 $130/hr Administrative Staff 55-110 Co Architecture O’Xxxxxxx Xxxxxxxxx $95/hr MEP Engineering / Commissioning – Xxxx Xxxxx Principal $ 200 Associate Principal $263/hr Project Manager 160 Project Architect I 155 Project Architect II Project Designer 105 $186/hr Department Head / Associate $186/hr Commissioning Agent $165/hr Engineer, Design Coordinator, Construction Administrator 130 Intern Architect 90 Coordinator $161/hr BIM/CADD Technician 90 $118/hr Clerical $85/hr Structural Engineering – JQ Partner $240/hr Principal $210/hr Senior Project Manager $175/hr Engineering Technical Lead $190/hr Project Manager $155/hr Senior Project Engineer $135/hr Project Engineer $120/hr Senior Technician Technician Administrative Civil Engineering / Surveying – Stantec $110/hr $90/hr $75/hr Managing Principal $240/hr Principal $225/hr Senior Project Manager $190/hr Project Manager $175/hr Senior Consultant $160/hr Consultant $140/hr Senior Technical Designer $110/hr Technical Designer $100/hr Managing Surveyor $160/hr Senior Surveyor $120/hr Administration $80/hr Construction Observation $120/hr Landscape Architecture – TBG Partners Staff V $250/hr Staff IV $140/hr Staff III $110/hr Staff II $85/hr Staff I $60/hr Cost Consultant – Xxxxxxxx Chief Estimator $210/hr Estimator 1 $170/hr Administrative Staff 70 MEP Engineering O’Xxxxxxx Xxxxxxxxx $45/hr AV/Technology/Security – Sextant Group Principal-In-Charge $190/hr Principal $ 220 Designer / Consultant $180/hr Project Manager 160 Senior Consultant / Technology Planner $145/hr Designer $145/hr Assistant Designer $115/hr Project Coordinator $105/hr Graphic Artist $105/hr BIM Modeler / CAD Specialist $85/hr Administration $65/hr Laboratory Consultant – Xxxxxxx+Will Principal $325/hr Laboratory Consultant $240/hr Laboratory Design Engineer 175 Engineer 165 Engineering $240/hr Technical Coordinator $180/hr Laboratory Programmer $240/hr Laboratory Designer 115 Construction Administrator 130 $240/hr Production Coordinator $205/hr Arch I $120/hr Arch II $130/hr Arch III $170/hr Specifications Writer $240/hr BIM/CADD Technician 90 $130/hr Technical Writer $180/hr Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC $95/hr Fire Protection & Code Consultant – Xxxxxx Xxxxxx Vice President $232/hr Office Leader/Practice Leader $219/hr Project Director $199/xx Xx. Consultant/Designer $177/hr Associate Consultant/Designer $156/hr Consultant/Designer $146/hr Technician $114/hr Intern $114/hr CADD Operator $95/hr Geotechnical Consultant - Terracon Principal $ 205 Project Manager 176 Engineer $185/hr Senior Associate $170/hr Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Administrator 105 BIM$145/CADD Technician 93 Administrative Staff 66 Structural Engineering Datum Xxxx, LLC Senior Principal $ 255.00 Principal $ 185.00 Senior Project Manager $ 160.00 Project Manager $ 145.00 hr Project Engineer $ 115.00 Graduate $120/hr Staff Engineer $ 100.00 $105/hr Senior Production Manager $ 150.00 Senior Engineering Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 Civil Engineering Xxxxxxx Engineering & Surveying Co., Inc. Principal $ 200 Associate Principal 175 Senior Project Manager 175 Project Manager 150 Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering Designer 100 Construction Administrator 120 BIM$60/CADD Technician 90 Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Principal hr Drafter $60/hr Accessibility Consultant Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75ARS Consulting $150/day Research 50 Administrative Staff 60 Landscape Architecture Xxxxxxx & Associates Principal $ 160 Landscape Architect 125 Administrative Staff 50 Data/Telecommunications Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Acoustical/Audio-Visual Consultant 4b Technology Group Principal $195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Security Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Senior Designer $ 100.00 BIM/CADD Technician $ 85.00 Administrative Staff $ 60.00 hr EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Project Number: Brief Project Description: Additional Project Information: Construction Delivery Method: Project Schedule/Phases/Milestones: Include BIM milestones, pre-design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring Design Reviews Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Interference Check Detect problems in the model where two building components are clashing including soft and hard Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model Structural Model Mechanical Model Plumbing Model Fire Sprinkler Model Electrical Model Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). Measurement and Coordinate System Describe the measurement system and coordinate system used. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTSATTACHMENTS List any supporting information and attach. TAMUS/FPC Review Document Distribution Matrix

Appears in 1 contract

Samples: Agreement

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, Refer to Exhibit C: Document Distribution Matrix for the following required number of sets of documents required for each review documents at the required review stages: Schematic Design: 5 (1/2 size) sets with narratives Design Development: 5 (1/2 size) sets for 25% and 100% with specifications Construction Documents: 5 (1/2 size) sets for 25%, 50% & 75% 100% with specifications Construction Documents: 5 (1/2 size) sets for 100% complete with specifications stage. The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan Ex C Document Distribution Matrix EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. FirmUFirm/Position Classification Hourly UHourly Billing Rate Architecture EYP Inc. – Xxxxxxx+Will Principal $ 195-310 $325/hr Associate Principal 145-220 $275/hr Project Manager 145-220 $240/hr Project Architect I 195-310 $205/hr Project Architect II 145-222 $240/hr Project Designer 195-310 Project Designer 195-310 Senior Lab Planner 250 Lab Planner 145-220 $240/hr Construction Administrator 145-220 $205/hr Intern Architect 75-130 $105/hr Arch I $120/hr Arch II $130/hr Arch III $170/hr Specifications Writer $240/hr BIM/CADD Technician 75-130 $130/hr Administrative Staff 55-110 Co $95/hr Design Architecture O’Xxxxxxx Xxxxxxxxx - Xxxxxxx+Will Principal $ 200 $325/hr Associate Principal $275/hr Project Manager 160 $240/hr Project Architect I 155 $205/hr Project Architect II $240/hr Project Designer 105 $240/hr Construction Administrator 130 $205/hr Intern Architect 90 $105/hr Arch I $120/hr Arch II $130/hr Arch III $170/hr Specifications Writer $240/hr BIM/CADD Technician 90 $130/hr Administrative Staff 70 $95/hr MEP Engineering O’Xxxxxxx Xxxxxxxxx Principal $ 220 Project Manager 160 – WSPennington + ccrd Executive Vice President $250.00/hr Vice President $200.00/hr Senior Associate $150.00/hr Associate $135.00/hr Senior Engineer 175 $125.00/hr Engineer 165 Engineering $115.00/hr Senior Designer 115 $110.00/hr Designer $90.00/hr Construction Administrator 130 $90.00/hr BIM/CADD Technician 90 $75.00/hr Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC $65.00/hr Commissioning – WSPennington + ccrd Principal $ 205 in Charge of Commissioning $220.00/hr Commissioning Group Manager $165.00/hr CxA Project Manager 176 $145.00/hr Cx Provider – MEP Engineer $125.00/hr Cx Provider – MEP Specialist $110.00/hr Cx Project Delivery Support $65.00/hr Clerical $45.00/hr Structural Engineering – Ensight Xxxxxx Xxxxxx Principal $275/hr Associate Principal $195/hr Senior Project Manager $175/hr Project Manager $175/hr Senior Engineer 160 Quality Control Supervisor 148 $165/hr Engineer 126 $135/hr Graduate Engineer 115 Senior Engineer $110/hr Engineering Designer 115 Engineer Designer 93 $110/hr Construction Administrator 105 $110/hr BIM/CADD Technician 93 $110/hr Administrative Staff 66 Structural $85/hr Civil Engineering Datum Xxxx, LLC Senior – JQ Partner $240/hr Principal $ 255.00 Principal $ 185.00 $210/hr Engineering Tech Lead $190/hr Senior Project Manager $ 160.00 $170/hr Project Manager $ 145.00 Project Engineer $ 115.00 Graduate Engineer $ 100.00 Senior Production Manager $ 150.00 Senior Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 Civil Engineering Xxxxxxx Engineering & Surveying Co., Inc. Principal $ 200 Associate Principal 175 Senior Project Manager 175 Project Manager 150 $155/hr Senior Engineer 175 $135/hr Engineer 150 Graduate Engineer 115 $120/hr Senior Engineering Designer 100 Construction Administrator 120 $110/hr BIM/CADD Technician 90 $90/hr Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. $75/hr Landscape Architecture – TBG Partners Principal – Registered Professional Land Surveyor $ 140 $165/hr Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) $75/day Research 50 hr Landscape Architect $65/hr Administrative Staff 60 Landscape Architecture Xxxxxxx & Associates $50/hr Cost Consultant – Project Cost Resources Principal $ 160 Landscape Architect 125 $190/hr Senior Estimator $135/hr Estimator $65/hr Administrative Staff 50 Data$45/Telecommunications Consultant 4b Technology hr Technology/Security – Datacom Design Group Principal $ 195 $190/hr Associate Principal $180/hr Senior Project Manager 185 $170/hr Senior Technology Consultant 165 $145/hr Technology Consultant 145 $124/hr Contract Administrator $98/hr BIM/CADD Technician 95 $65/hr Administrative Staff 65 Acoustical$56/Audio-Visual hr Acoustical Consultant 4b Technology Group – JEAcoustics Principal $195 Project Manager 185 248/hr Senior Associate $215/hr Associate $190/hr Senior Consultant 165 $150/hr Consultant 145 $115/hr BIM/CADD Technician 95 $85/hr Administrative Staff 65 Security $65/hr Laboratory Consultant 4b Technology Group – Xxxxxxx+Will Principal $ 195 Project Manager 185 Senior $325/hr Laboratory Consultant 165 Consultant 145 $240/hr Laboratory Design Engineer $240/hr Technical Coordinator $180/hr Laboratory Programmer $240/hr Laboratory Designer $240/hr Production Coordinator $205/hr Arch I $120/hr Arch II $130/hr Arch III $170/hr Specifications Writer $240/hr BIM/CADD Technician 95 $130/hr Technical Writer $180/hr Administrative Staff 65 Energy $95/hr Fire Protection & Code Consultant The Xxxxx Group – Xxxxxx Xxxxxx Principal - Energy $ 245 $265/hr Project Director $230/hr Project Manager III - Energy 175 $205/hr Project Manager II - Energy 140 Consultant $135/hr Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Engineer $150/hr Project Manager $ 150.00 Life SafetyAdministrator $125/Code Specialist $ 125.00 Senior Designer $ 100.00 hr BIM/CADD Technician $ 85.00 N/A Administrative Staff $ 60.00 Included in overhead Wind Analysis Consultant - CPP Principal $336/hr Project Director $246/hr Project Manager $200/hr Engineering Technician $84/hr Project Engineer $182/hr BIM/CADD Technician $122/hr Administrative Staff $90/hr Geotechnical Consultant - Terracon Principal $200/hr Project Director $170/hr Project Manager $150/hr Project Consultant $120/hr Project Engineer $110/hr BIM/CADD Technician $60/hr Administrative Staff $50/hr EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- cost‐ effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Project Number: Brief Project Description: Additional Project Information: Construction Delivery Method: Project Schedule/Phases/Milestones: Include BIM milestones, pre-design pre‐design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring Design Reviews Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time One‐Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Interference Check Detect problems in the model where two building components are clashing including soft and hard Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant non‐compliant elements and corrective action plans Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model Structural Model Mechanical Model Plumbing Model Fire Sprinkler Model Electrical Model Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). Measurement and Coordinate System Describe the measurement system and coordinate system used. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- /‐ [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- /‐ [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- /‐ [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTSATTACHMENTS List any supporting information and attach. TAMUS/FPC Review Document Distribution Matrix Project : 02-3205 Biocontainment Research Facility Recipient SD 100% Review DD 100% Review CD 50% Review CD 100% Review FC1 For Const. Package 1 FC2 For Const. Package 2 FC3 For Const. Package 3

Appears in 1 contract

Samples: assets.system.tamus.edu

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, the following number of sets of review documents at the required review stages: No printed specifications needed – only electronic Schematic Design: 5 (1/2 size) sets with narratives Design Development: 5 (1/2 size) 10 ½ size sets for 25% and 100% with specifications ½ size sets Construction Documents: 5 (1/2 size) 10 ½ size sets for 25%, 50% & 75% 100% with specifications complete Construction Documents: 5 (1/2 size) 10 ½ size sets for 100% complete with specifications [SIGNATURES PROVIDED ON FOLLOWING PAGE] The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. FirmUFirm/Position Classification Hourly HU ourly Billing Rate Architecture EYP Inc. - PBK Partner $300.00 Principal $ 195-310 265.00 Associate Principal 145-220 Principle 230.00 Project Manager 145-220 Manager/Associate 210.00 Architect 190.00 Intern 115.00 Field 110.00 Office 85.00 Design Architecture - Lake/Flato Architects Partner $295.00 Associate Partner 220.00 Associate 185.00 Project Architect I 195-310 165.00 Project Architect II 145-222 Director 140.00 Project Designer 195-310 Project 120.00 Designer 195-310 Senior Lab Planner 250 Lab Planner 145-220 Construction Administrator 145-220 100.00 Intern Architect 75-130 65.00 BIM/CADD Technician 75-130 174.24 Sustainability Director 174.24 Sustainability Director 112.12 MEP Engineering - Xxxx Xxxxx & Associates, Inc. Principal $263.00 Project Manager 186.00 Engineer 161.00 Construction Administrator 161.00 BIM 118.00 Administrative Staff 55-110 Co Architecture O’Xxxxxxx Xxxxxxxxx 85.00 Structural Engineering - Intelligent Engineering Services Principal $ 200 Associate Principal $210.00 Project Manager 160 195.00 Senior Project Architect I 155 Engineer 180.00 Project Architect II Project Designer 105 Construction Administrator 130 Intern Architect 90 BIMEngineer 165.00 Technician/CADD Technician 90 CAD Operator 95.00 Administrative Staff 70 MEP 75.00 Civil Engineering O’Xxxxxxx Xxxxxxxxx - Intelligent Engineering Services Principal $ 220 $210.00 Project Manager 160 Senior Engineer 175 Engineer 165 Engineering Designer 115 Construction Administrator 130 BIM/CADD Technician 90 Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC Principal $ 205 Project Manager 176 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Administrator 105 BIM/CADD Technician 93 Administrative Staff 66 Structural Engineering Datum Xxxx, LLC Senior Principal $ 255.00 Principal $ 185.00 195.00 Senior Project Manager $ 160.00 Project Manager $ 145.00 180.00 Project Engineer $ 115.00 Graduate Engineer $ 100.00 Senior Production Manager $ 165.00 Technician/CAD Operator 95.00 Administrative 75.00 Survey Crew 150.00 Senior Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 Civil Engineering Xxxxxxx Engineering & Surveying Co., Inc. Principal $ 200 Associate Principal 175 Senior Project Manager 175 Project Manager 150 Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering Designer 100 Construction Administrator 120 BIM/CADD Technician 90 Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Principal – Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75/day Research 50 Administrative Staff 60 RPLS 130.00 Landscape Architecture - Xxxxxxx & Associates Principal $ 160 Partner Landscape Architect 125 $160.00 Principal Landscape Architect 130.00 Project Manager Landscape Architect 115.00 Landscape Designer III 105.00 Landscape Designer II 95.00 Landscape Designer I 85.00 CADD Draftsman 75.00 Graphics/Administrative Staff 50 75.00 Data/Telecommunications Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Consultant/ Acoustical/Audio-Visual Consultant 4b Technology Consultant/Security - Datacom Design Group Principal $195 190.00 Associate 180.00 Senior Project Manager 185 170.00 Senior Technology Consultant 165 145.00 Technology Consultant 145 124.00 Contract Administration 98.00 Technology Support (CAD/BIM) 65.00 Clerical/CADD Technician 95 Administrative Staff 65 Security Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Senior Designer $ 100.00 BIM/CADD Technician $ 85.00 Administrative Staff $ 60.00 Accounting 56.00 EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Student Services Building Project Number: 02-3235 Brief Project Description: Additional Project Information: Construction Delivery Method: XXXX Project Schedule/Phases/Milestones: Include BIM milestones, pre-design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring Design Reviews Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Interference Check Detect problems in the model where two building components are clashing including soft and hard Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model Structural Model Mechanical Model Plumbing Model Fire Sprinkler Model Electrical Model Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). Measurement and Coordinate System Describe the measurement system and coordinate system used. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTS

Appears in 1 contract

Samples: assets.system.tamus.edu

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, the following number of sets of review documents at the required review stages: Schematic Design: 5 (1/2 size) sets with narratives Design Development: 5 (1/2 size) 2 sets for 25% and 100% with specifications 2 sets Construction Documents: 5 (1/2 size) 2 sets for 25%, 50% & 75% 100% with specifications complete Construction Documents: 5 (1/2 size) 2 sets for 100% complete with specifications The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. FirmUFirm/Position Classification Hourly UHourly Billing Rate Architecture EYP Inc. and Interior Design [Xxxxxxx+Will] Principal $ 195-310 $345.00 Associate Principal 145-220 295.00 Senior Project Manager 145-220 285.00 Project Manager 260.00 Senior Project Architect I 195-310 250.00 Project Architect II 145-222 220.00 Senior Project Designer 195-310 260.00 Project Designer 195-310 220.00 Senior Lab Planner 250 Lab Planner 145-220 Construction Administrator 145-220 Technical Coordinator 245.00 Technical Coordinator 220.00 Arch III / Design III 180.00 Arch II / Design II 140.00 Arch I / Design I 130.00 Intern Architect 75-130 115.00 Administrative Staff 100.00 MEP Engineering [WSP and M3T CxA Authorities] Executive Vice President $300.00 Senior Vice President 250.00 Vice President 225.00 Senior Associate 160.00 Associate 140.00 Senior Fire Protection Engineer 180.00 Senior Engineer 125.00 Fire Protection Engineer 150.00 Engineer 115.00 Senior Designer 110.00 Designer 90.00 BIM/CADD Technician 75-130 75.00 Administrative Staff 55-110 Co Architecture O’Xxxxxxx Xxxxxxxxx 65.00 Structural Engineering [Structures] Principal $ 200 $200.00 Associate Principal 200.00 Senior Project Manager 160 160.00 Project Architect I 155 Project Architect II Project Manager 145.00 Engineer 130.00 Graduate Engineer 100.00 Engineering Designer 105 Construction Administrator 130 Intern Architect 90 90.00 BIM/CADD Technician 90 65.00 Administrative Staff 70 MEP 60.00 Civil Engineering O’Xxxxxxx Xxxxxxxxx [JQ] Partner $240.00 Principal $ 220 210.00 Engineering Technical Lead 190.00 Senior Project Manager 160 175.00 Project Manager 155.00 Senior Project Engineer 175 135.00 Project Engineer 165 Engineering 120.00 Senior Technician 110.00 Technician 90.00 Administrative Staff 75.00 Senior Registered Professional Land Surveyor 165.00 Registered Professional Land Surveyor 125.00 Survey Crew 160.00 Landscape Architecture [TBG] Principal $165.00 Landscape Architect 90.00 Administrative Staff 65.00 Cost Consultant [Project Cost Resources] Principal $190.00 Senior Estimator 136.00 Estimator 60.00 Data/Telecommunications and Audio-Visual Consultant [Datacom] Principal $190.00 Associate 180.00 Senior Consultant 145.00 Consultant/Designer 115 Construction Administrator 130 124.00 BIM/CADD Technician 90 65.00 Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC 56.00 Acoustical Consultant [JEAcoustics] Principal $ 205 Project Manager 176 $260.00 Associate 200.00 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Consultant 160.00 Consultant 125.00 Contract Administrator 105 75.00 BIM/CADD Technician 93 Administrative Staff 66 Structural Engineering Datum Xxxx, LLC Senior Principal $ 255.00 Principal $ 185.00 Senior Project Manager $ 160.00 Project Manager $ 145.00 Project Engineer $ 115.00 Graduate Engineer $ 100.00 Senior Production Manager $ 150.00 Senior Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 Civil Engineering Xxxxxxx Engineering & Surveying Co., Inc. Principal $ 200 Associate Principal 175 Senior Project Manager 175 Project Manager 150 Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering Designer 100 Construction Administrator 120 BIM/CADD Technician 90 Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Principal – Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75/day Research 50 Administrative Staff 60 Landscape Architecture Xxxxxxx & Associates Principal $ 160 Landscape Architect 125 Administrative Staff 50 Data/Telecommunications Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Acoustical/Audio-Visual Consultant 4b Technology Group Principal $195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Security Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Senior Designer $ 100.00 BIM/CADD Technician $ 85.00 Administrative Staff $ 60.00 65.00 Fire Protection/Code Consultant [Xxxxxx Xxxxxx] Project Director $250.00 Project Manager 220.00 Project Consultant 150.00 Project Engineer 180.00 EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) Xxxxxxx+Will PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Texas A&M Veterinary Education, Research & Outreach Center, Canyon, Texas Project Number: 02-3266 Brief Project Description: Additional Project Information: Construction Delivery Method: Construction Manager @ Risk Project Schedule/Phases/Milestones: Include BIM milestones, pre-design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone Xxxxxxx+Will (Arch) Xxxxxx Xxxxx Design Applications Manager Houston Xxxxxx.xxxxx@xxxxxxxxxxx.xxx 713.366.4000 WSP (MEP) Structures(Structure) JQ (Civil) TBG (Landscape) DataCom (IT/AV) BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring • Each discipline is responsible for authoring their respective BIMs. Design Reviews • Each discipline will participate in design reviews as scheduled by Xxxxxxx+Will throughout the design and documentation process. Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) • Each discipline will be responsible for the coordination of their own systems. The team as a whole will be subject to Clash Detection reports generated by Xxxxxxx+Will. The reports will be reviewed during the Design Review meetings. Model Updates during Construction • Each Discipline will be responsible for updating their BIMs accordingly through the Construction phase of the project. Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed All team members Revit Daily Interference Check Detect problems in the model where two building components are clashing including soft and hard Xxxxxxx+Will Revit, Navisworks Before each major milestone Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) All team members Revit Daily Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans All team members Revit Daily Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model ARCH_VERO Structural Model STRU_VERO Mechanical Model MECH_VERO Plumbing Model PLBG_VERO Fire Sprinkler Model (to be included in plumbing) Electrical Model ELEC_VERO Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). In an ideal situation, the model will not be separated. If it does need to be separated because of file size or complexity, the first step would be to break apart the Shell or Skin of the building from the Build-Out. If further separation is needed, the models would be analyzed to determine how to best accomplish this and still easily maintain documentation all the way through the construction phase of the project. Measurement and Coordinate System Describe the measurement system and coordinate system used. The Coordinate and Measurement Systems to be used will be established by Xxxxxxx+Xxxx and inherited by the other disciplines. The model will be placed as accurately as possible on a global map using a Geographic Information System (GIS). Doing this will ensure the daylighting and solar analysis is completed accurately for the location of the project. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTS

Appears in 1 contract

Samples: assets.system.tamus.edu

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, the following number of sets of review documents at the required review stages: Schematic Design: 5 (1/2 size) sets with narratives Design Development: 5 (1/2 size) 8 sets for 25% and 100% with specifications Construction Documents: 5 (1/2 size) 8 sets for 25%, 50% & 75% 100% with specifications complete Construction Documents: 5 (1/2 size) 8 sets for 100% complete with specifications The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. FirmUFirm/Position Classification Hourly UHourly Billing Rate Architecture EYP Inc. - ENERGY ARCHITECTURE Principal $ 195-310 $225 Associate Principal 145-220 200 Project Manager 145-220 175 Project Architect I 195-310 140 Project Architect II 145-222 115 Project Designer 195-310 200 Intern Architect 90 Administrative Staff 65 MEP Engineering – WSP XXXXXXXXXX Principal $250 Associate Principal 215 Senior Project Manager 160 Project Manager 150 Senior Engineer 120 Engineer 100 Graduate Engineer 85 Engineering Designer 195-310 Senior Lab Planner 250 Lab Planner 145-220 75 Construction Administrator 145-220 Intern Architect 75-130 120 BIM/CADD Technician 75-130 60 Administrative Staff 55-110 Co Architecture O’Xxxxxxx Xxxxxxxxx Principal $ 200 Associate Principal Project Manager 160 Project Architect I 155 Project Architect II Project Designer 105 Construction Administrator 130 Intern Architect 90 BIM/CADD Technician 90 Administrative Staff 70 MEP Engineering O’Xxxxxxx Xxxxxxxxx Principal $ 220 Project Manager 160 Senior Engineer 175 Engineer 165 Engineering Designer 115 Construction Administrator 130 BIM/CADD Technician 90 Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC Principal $ 205 Project Manager 176 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Administrator 105 BIM/CADD Technician 93 Administrative Staff 66 55 Structural Engineering Datum Xxxx, LLC Senior - XXXXXXX ENGINEERS Principal $ 255.00 Principal $ 185.00 Senior Project Manager $ 160.00 Project Manager $ 145.00 Project Engineer $ 115.00 Graduate Engineer $ 100.00 Senior Production Manager $ 150.00 Senior Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 Civil Engineering Xxxxxxx Engineering & Surveying Co., Inc. Principal $ $200 Associate Principal 175 Senior Project Manager 175 145 Project Manager 150 120 Senior Engineer 175 145 Engineer 150 120 Graduate Engineer 115 95 Engineering Designer 100 80 Construction Administrator 120 60 BIM/CADD Technician 90 Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Principal – Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75/day Research 50 Administrative Staff 44 Civil Engineering – XXXXXXX ENGINEERS Principal $200 Associate Principal 175 Senior Project Manager 145 Project Manager 120 Senior Engineer 145 Engineer 120 Graduate Engineer 95 Engineering Designer 80 Construction Administrator 60 BIM/CADD Technician 50 Administrative Staff 44 Landscape Architecture Xxxxxxx & Associates – XXXXXX-XXXXXXXXXX Principal $ 160 $180 Landscape Architect 125 120 Administrative Staff 50 100 Cost Consultant – CCS INTERNATIONAL Principal $225 Senior Estimator 185 Estimator 155 Administrative Staff 65 Data/Telecommunications Consultant 4b Technology Group – 4B TECHNOLOGY Principal $ $195 Project Manager Associate 185 Senior Consultant 165 Consultant 145 Designer 145 Contract Administrator 125 BIM/CADD Technician 95 Administrative Staff 65 Acoustical/Audio-Visual Consultant 4b Technology Group – 4B TECHNOLOGY Principal $195 Project Manager Associate Principal 185 Senior Consultant 165 Consultant 145 Designer 145 Contract Administrator 125 BIM/CADD Technician 95 Administrative Staff 65 Laboratory Consultant – ENERGY ARCHITECTURE Principal $225 Laboratory Consultant 200 Laboratory Design Engineer 175 Technical Coordinator 160 Laboratory Programmer 175 Laboratory Designer 140 BIM/CADD Technician 95 Administrative Staff 65 Security Consultant 4b Technology Group – 4B TECHNOLOGY Principal $ $195 Project Director 185 Project Manager 185 Senior Project Consultant 165 Consultant 145 Project Engineer 165 BIM/CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Senior Designer $ 100.00 BIM/CADD Technician $ 85.00 Administrative Staff $ 60.00 EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Project Number: Brief Project Description: Additional Project Information: Construction Delivery Method: Project Schedule/Phases/Milestones: Include BIM milestones, pre-design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring Design Reviews Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Interference Check Detect problems in the model where two building components are clashing including soft and hard Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model Structural Model Mechanical Model Plumbing Model Fire Sprinkler Model Electrical Model Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). Measurement and Coordinate System Describe the measurement system and coordinate system used. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTS

Appears in 1 contract

Samples: assets.system.tamus.edu

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, the following number of sets of review documents at the required review stages: Schematic Design: 5 (1/2 size) sets with narratives Design Development: 5 (1/2 size) sets for 25% and 100% with specifications Construction Documents: 5 (1/2 size) sets for 25%, 50% & 75% 100% with specifications Construction Documents: 5 (1/2 size) sets for 100% complete with specifications Please refer to Exhibit C – Document Distribution Matrix The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan Ex C Document Distribution Matrix EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. FirmUFirm/Position Classification Hourly UHourly Billing Rate Architecture EYP Inc. - Xxxxxxx+Will Senior Principal $ 195-310 $425 Principal 335 Associate Principal 145-220 285 Sr. Project Manager 145-220 250 Sr. Project Designer 250 Sr. Project Architect I 195-310 250 Sr. Technical Coordinator 225 Project Manager 225 Project Designer 210 Project Architect 210 Technical Coordinator 210 Arch III/ Design III 180 Arch II/ Design II 145-222 Project 140 Arch I/ Design I 125 Intern 110 Administrative 95 Design Architecture - Bora Principal $240 Architect / Designer 195-310 Project IV 140 Architect / Designer 195-310 Senior Lab Planner 250 Lab Planner 145-220 Construction Administrator 145-220 III 110 Architect / Designer II 95 Architect / Designer I 80 Architect / Designer Intern Architect 75-130 BIM/CADD Technician 75-130 70 Administrative Staff 55-110 Co Architecture O’Xxxxxxx Xxxxxxxxx 75 MEP Engineering - Xxxx Xxxxx & Associates Principal $ 200 Associate Principal $266 Project Manager 160 Project Architect I 155 Project Architect II Project 188 Department Head/Associate 188 Engineer, Design Coordinator, Construction Coordinator 164 CADD Specialist/Designer 105 Construction Administrator 130 Intern Architect 90 BIM/CADD Technician 90 Administrative Staff 70 MEP Engineering O’Xxxxxxx Xxxxxxxxx Principal $ 220 Project Manager 160 Senior Engineer 175 Engineer 165 Engineering Designer 115 Construction Administrator 130 BIM/CADD Technician 90 Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC Principal $ 205 Project Manager 176 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Administrator 105 BIM/CADD Technician 93 Administrative Staff 66 120 Clerical 87 Structural Engineering Datum Xxxx, LLC Senior Principal $ 255.00 Principal $ 185.00 Senior Project Manager $ 160.00 Project Manager $ 145.00 Project Engineer $ 115.00 Graduate Engineer $ 100.00 Senior Production Manager $ 150.00 Senior Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 & Civil Engineering Xxxxxxx - JQ Engineering & Surveying Co., Inc. Partner $240 Principal $ 200 Associate Principal 175 210 Engineering Technical Lead 190 Senior Project Manager 175 Project Manager 150 155 Senior Project Engineer 175 135 Project Engineer 150 Graduate Engineer 115 Engineering Designer 100 Construction 120 Senior Technician 110 Technician 90 Administrative 75 Senior Registered Professional Land Surveyor 165 Registered Professional Land Surveyor 125 Survey Crew 160 Data/Telecommunications/Audio-Visual/Security Consultant - Datacom Design Group Principal $190 Associate Principal 180 Senior Project Manager 170 Senior Technology Consultant 145 Technology Consultant 124 Contract Administrator 120 98 BIM/CADD Technician 90 Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. 65 Clerical / Accounting 56 Theater Planning - The Shalleck Collaborative Principal – Registered Professional Land Surveyor $ 140 $175-200 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2and Systems Designer 120-Man w/ GPS) 135 ATV (All175 Draftsperson 110-Terrain Vehicle) 75/day Research 50 Administrative Staff 60 Landscape Architecture Xxxxxxx & Associates 130 Acoustical Design - Xxxxx Holden Principal $ 160 Landscape Architect 125 Administrative Staff 50 Data/Telecommunications Consultant 4b Technology Group $265 Associate Principal $ 195 Project Manager 185 200 Senior Consultant 165 185 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Acoustical/Audio-Visual Consultant 4b Technology Group Principal $195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Security Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Senior Designer $ 100.00 BIM/CADD Technician $ 85.00 Administrative Staff $ 60.00 120 Draftsperson 100 EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Project Number: Brief Project Description: Additional Project Information: Construction Delivery Method: Project Schedule/Phases/Milestones: Include BIM milestones, pre-design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring Design Reviews Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Interference Check Detect problems in the model where two building components are clashing including soft and hard Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model Structural Model Mechanical Model Plumbing Model Fire Sprinkler Model Electrical Model Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). Measurement and Coordinate System Describe the measurement system and coordinate system used. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTS

Appears in 1 contract

Samples: assets.system.tamus.edu

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, the following number of sets of review documents at the required review stages: documents defined in Exhibit C – Document Distribution Matrix. Schematic Design: 5 (1/2 size) sets with narratives Design Development: 5 (1/2 size) sets for 25% and 100% with specifications Construction Documents: 5 (1/2 size) sets for 25%, 50% & 75% 100% with specifications complete Construction Documents: 5 (1/2 size) sets for 100% complete with specifications [SIGNATURES PROVIDED ON FOLLOWING PAGE] The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan Ex C Document Distribution Matrix EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. FirmFU irm/Position Classification Hourly H ourly Billing Rate Architecture EYP Inc. - TreanorHL Principal $ 195-310 Associate Principal 145-220 in Charge $330 Principal/Project Manager 145-220 $250 Associate Principal/Project Architect I 195-310 Project Architect II 145-222 Project $190 Building Envelope Specialist $190 Interior Design Lead $170 Designer 195-310 Project Designer 195-310 Senior Lab Planner 250 Lab Planner 145-220 $150 Construction Administrator 145-220 $190 Intern Architect 75-130 $100 BIM/CADD Technician 75-130 $110 Administrative Staff 55-110 Co $105 Design Architecture O’Xxxxxxx Xxxxxxxxx - Xxxxx Saint Gross Principal $ 200 III $335 Principal II $300 Principal I $250 Project Director $215 Project Manager $190 Architect III $160 Architect II $135 Architect I $115 Planner III $160 Planner II $135 Planner I $115 Director of Graphics $185 Sr. Graphic Designer $135 Graphic Designer $95 Design Professional I $105 Emerging Professional $95 Student Intern $65 Specifications Writer II $195 Programmer III $170 Programmer II $125 Project Administrator $95 MEP Engineering - Xxxx Xxxxx & Associates Principal $271 Project Manager $191 Department Head/Associate $191 Engineer $173 Design Coordinator $173 Construction Coordinator $173 BIM Specialist/Designer $127 Administrative Staff $91 Structural Engineering - JQ Partner $260 Principal $225 Senior Project Manager $185 Project Manager $160 Senior Engineer $145 Engineering Technical Lead $195 Project Engineer $130 Senior Technician $125 Technician $95 Administrative Staff $80 Civil Engineering - JQ Partner $260 Principal $225 Senior Project Manager $185 Project Manager $160 Senior Engineer $145 Engineering Technical Lead $195 Project Engineer $130 Senior Technician $125 Technician $95 Administrative Staff $80 Senior Registered Professional Land Surveyor $180 Registered Professional Land Surveyor $130 Survey Crew (1 Person) $130 Survey Crew (2 Person) $170 Landscape Architecture - Xxxxxxx & Associates Partner Landscape Architect $160 Principal Landscape Architect $130 Project Manager Landscape Architect $115 Landscape Designer III $105 Landscape Designer II $95 Landscape Designer I $85 CADD Draftsman $75 Graphics/Administrative Staff $75 Cost Consultant - Vermeulens Principal $280 Associate Principal $250 Associate/Director $220 Senior Project Manager $190 Project Manager $160 Senior Estimator/IT $160 Estimator/Support $130 Data/Telecommunications/Security/AV/Acoustics/Vibration Consultant - 4B with SLR - 4B Data/Telecommunications/Security/AV Managing Principal $225 Project Architect I 155 Manager $185 Assistant Project Architect II Project Manager $165 Communications Designer 105 $165 A/V Designer $165 Revit Designer $140 Construction Administrator 130 Intern Architect 90 $140 [SLR Vibration/Acoustics] Principal Engineer/Scientist) $265 Senior Engineer/Scientist $240 Associate Engineer/Scientist $220 Project Engineer/Scientist $200 Staff Engineer/Scientist $185 Senior Technician $165 Technician $140 Staff Technician $120 Project Coordinator $100 Staff Assistant $70 Acoustics/Vibration Equipment Rate Schedule ($/Day) Type 1 Sound Level Meter/Analyzer $100 Type 2 Sound Level Meter $50 Sound Intensity Testing $140 Multi-Channel Data Acquisition System $500 TEF/Smaart Room Acoustics Testing $150 Sound System/Noise Source $75 Tapping Machine $250 Weather Monitoring Systems $50 High-temperature Microphone Probe $100 Pipe Noise Measurement System $100 Laboratory Consultant - TreanorHL Principal $330 Laboratory Programmer $170 Laboratory Designer $170 BIM/CADD Technician 90 $110 Specifications/Technical Writer $190 Administrative Staff 70 MEP Engineering O’Xxxxxxx Xxxxxxxxx $105 Environmental Wind Tunnel Testing - Ambient Air Technologies Principal $ 220 in Charge/Project Manager 160 Senior $150 Assistant Project Manager $100 Engineer 175 Engineer 165 Engineering Designer 115 Construction Administrator 130 BIM$125 Drafter/CADD Model Building $75 Technician 90 $75 Wind Tunnel and Equipment $2,500 (per day) Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC Principal $ 205 Project Manager 176 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Administrator 105 BIM/CADD Technician 93 Administrative Staff 66 Structural Engineering Datum Xxxx, LLC Senior Principal $ 255.00 Principal $ 185.00 Senior Project Manager $ 160.00 Project Manager $ 145.00 Project Engineer $ 115.00 Graduate Engineer $ 100.00 Senior Production Manager $ 150.00 Senior Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 Civil Engineering Xxxxxxx Engineering & Surveying Co., Inc. Principal $ 200 Associate Principal 175 Senior Project Manager 175 Project Manager 150 Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering Designer 100 Construction Administrator 120 BIM/CADD Technician 90 Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Principal – Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75/day Research $50 Administrative Staff 60 Landscape Architecture Xxxxxxx & Associates Principal $ 160 Landscape Architect 125 Administrative Staff 50 Data/Telecommunications Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Acoustical/Audio-Visual Consultant 4b Technology Group Principal $195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Security Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Consultant - Wiss Janney, Elstner Associates Principal $290 Associate Principal $235 Senior Associate $205 Accessibility Consultant - Abadi Architect/principal consultant $150 Accounting $75 Administrative Assistant $50 Geotechnical Consultant - Terracon Principal $190 Senior Project Manager/Engineer $155 Project Manager/Engineer $125 Geotechnical Technician/Geologist $90 Signage and Wayfinding - FocusEGD Principal $190 Vice President/Project Manager $180 Associate Sr. Designer $ 100.00 BIM/CADD Technician $ 85.00 Administrative Staff $ 60.00 $120 Professional Designer $110 EXHIBIT B BIM Execution Plan The AE and XXXX teams have 30 days after the design kick-off meeting to develop and submit a unified BIM Execution Plan that reflects both teams responsibilities for delivering a BIM model. DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Project Number: Brief Project Description: Additional Project Information: Construction Delivery Method: Project Schedule/Phases/Milestones: Include BIM milestones, pre-design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring Design Reviews Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Interference Check Detect problems in the model where two building components are clashing including soft and hard Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model Structural Model Mechanical Model Plumbing Model Fire Sprinkler Model Electrical Model Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). Measurement and Coordinate System Describe the measurement system and coordinate system used. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTSATTACHMENTS List any supporting information and attach. TAMUS/FPC Review Document Distribution Matrix

Appears in 1 contract

Samples: assets.system.tamus.edu

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, the following number of sets of review documents at the required review stages: Schematic Design: 5 (1/2 size) 8 sets with narratives Design Development: 5 (1/2 size) 8 sets for 25% and 100% with specifications Construction Documents: 5 (1/2 size) 8 sets for 25%, 50% & 75% 100% with specifications complete Construction Documents: 5 (1/2 size) 8 sets for 100% complete with specifications Redacted The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed project. or required by the project. FirmUFirm/Position Classification Hourly HU ourly Billing Rate Architecture EYP Inc. Engineering/Architect [Xxxxxxx Consultants] Principal $ 195-310 Associate Principal 145-220 Engineer $234.00 Senior Project Manager 145-220 $234.00 Project Architect I 195-310 Project Architect II 145-222 Project Manager $213.00 Senior Engineer $213.00 Engineer $178.00 Graduate Engineer $131.00 Engineering Designer 195-310 Project Designer 195-310 Senior Lab Planner 250 Lab Planner 145-220 Construction Administrator 145-220 Intern Architect 75-130 $121.00 BIM/CADD Technician 75-130 $111.00 Administrative Staff 55-110 Co Architecture O’Xxxxxxx Xxxxxxxxx $84.00 Principal $ 200 Associate Architect $234.00 Landscape Architect $131.00 Cost Estimator $121.00 Environmental Consultant [Xxxxxxx & Associates] Principal $200.00 Project Manager 160 Project Architect $140.00 Senior Environmental Professional $140.00 Staff Scientist II $120.00 Staff Scientist I 155 Project Architect $110.00 Environmental Tech II Project Designer 105 Construction Administrator 130 Intern Architect 90 BIM$110.00 Environmental Tech I $90.00 GIS Analyst/CADD Technician 90 Cartography $95.00 GIS Tech $80.00 Administrative Staff 70 MEP Engineering O’Xxxxxxx Xxxxxxxxx Principal $ 220 Project Manager 160 Senior Engineer 175 Engineer 165 Engineering Designer 115 Construction Administrator 130 BIM/CADD Technician 90 Administrative Staff 70 Co MEP Engineering CNG $70.00 Surveying Consultant [Xxxxxxx Engineering, PLLC Principal $ 205 Project Manager 176 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Administrator 105 BIM/CADD Technician 93 Administrative Staff 66 Structural Engineering Datum Xxxx, LLC Senior Principal $ 255.00 Principal $ 185.00 Senior Project Manager $ 160.00 Project Manager $ 145.00 Project Engineer $ 115.00 Graduate Engineer $ 100.00 Senior Production Manager $ 150.00 Senior Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 Civil Engineering Xxxxxxx Engineering & Surveying Co., Inc. Principal $ 200 Associate Principal 175 Senior Project Manager 175 Project Manager 150 Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering Designer 100 Construction Administrator 120 BIM/CADD Technician 90 Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Principal – ] Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 $120.00 Survey Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75/day Research 50 Administrative Staff 60 Landscape Architecture Xxxxxxx & Associates Principal $ 160 Landscape Architect 125 Administrative Staff 50 Data/Telecommunications Consultant 4b Technology Group Principal $ 195 Project $135.00 Survey Technician $80.00 Professional Engineer $120.00 Graduate Engineer $95.00 Drilling Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD $60.00 Draftsman $50.00 Technician 95 Administrative Staff 65 Acoustical/Audio-Visual Consultant 4b Technology Group Principal $195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Security Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Senior Designer $ 100.00 BIM/CADD Technician $ 85.00 Administrative Staff $ 60.00 44.00 Clerical $44.00 EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Project Number: Brief Project Description: Additional Project Information: Construction Delivery Method: Project Schedule/Phases/Milestones: Include BIM milestones, pre-design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring Design Reviews Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Interference Check Detect problems in the model where two building components are clashing including soft and hard Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model Structural Model Mechanical Model Plumbing Model Fire Sprinkler Model Electrical Model Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). Measurement and Coordinate System Describe the measurement system and coordinate system used. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTS

Appears in 1 contract

Samples: assets.system.tamus.edu

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, the following number of sets of review documents at the required review stages: Schematic Design: 5 (1/2 size) 4 sets with narratives Design Development: 5 (1/2 size) 4 sets for 25% and 100% with specifications Construction Documents: 5 (1/2 size) 4 sets for 25%, 50% & 75% 100% with specifications complete Construction Documents: 5 (1/2 size) 4 sets for 100% complete with specifications The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. FirmFU irm/Position Classification Hourly UHourly Billing Rate Architecture EYP Inc. Principal $ 195-310 Associate Principal 145-220 Project Manager 145-220 Project Architect I 195-310 Project Architect II 145-222 Project Designer 195-310 Project Designer 195-310 Senior Lab Planner 250 Lab Planner 145-220 Construction Administrator 145-220 Intern Architect 75-130 BIM/CADD Technician 75-130 Administrative Staff 55-110 Co Architecture O’Xxxxxxx Xxxxxxxxx Principal $ 200 Associate Principal Project Manager 160 Project Architect I 155 Project Architect II Project Designer 105 Construction Administrator 130 Intern Architect 90 BIM/CADD Technician 90 Administrative Staff 70 MEP Engineering O’Xxxxxxx Xxxxxxxxx Principal $ 220 Project Manager 160 Senior Engineer 175 Engineer 165 Engineering Designer 115 Construction Administrator 130 BIM/CADD Technician 90 Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC Principal $ 205 Project Manager 176 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Administrator 105 BIM/CADD Technician 93 Administrative Staff 66 Structural Engineering Datum Xxxx, LLC Architecture: Lord Xxxx Xxxxxxx Senior Principal $ 255.00 $285.00 Principal $ 185.00 $235.00 Senior Project Manager $ 160.00 / Discipline Specialist $175.00 Senior Project Architect / Senior Interior Designer $150.00 Project Manager / Discipline Specialist $145.00 Project Architect / Interior Designer $120.00 Design Staff $100.00 Administrative Staff $ 90.00 Food Service Consultant: Bakergroup Senior Principal $285.00 Consulting Principal $270.00 Operations Consultant / Associate $243.00 Production Principal $233.00 Project Manager $192.00 Design / Technical Associate $175.00 Interior Designer $135.00 Administrative Assistant $ 83.00 MEP Engineering: TG&W Principal Engineer $248.00 Senior Engineer $218.00 Staff Engineer $194.00 Engineer $179.00 Senior Designer $173.00 Staff Designer $158.00 Engineer-in-training $135.00 Designer $129.00 Designer / drafter $113.00 Technical Assistant $107.00 Drafter $105.00 Administrator $ 98.00 Clerical $ 71.00 Structural Engineering: JQ Infrastructure Partner $260.00 Principal $225.00 Senior Project Manager $185.00 Engineering Technical Lead $195.00 Project Manager $160.00 Senior Project Engineer $145.00 Project Engineer $130.00 Senior Technician $125.00 Technician $ 115.00 95.00 Administrative $ 80.00 Civil Engineering: Xxxxxxx Engineering Clerical $ 60.00 Designer $ 90.00 Draftsman $ 85.00 Graduate Engineer I $ 100.00 80.00 Graduate Engineer II $105.00 Principal $200.00 Senior Production Manager Engineer $160.00 Technician $ 150.00 48.00 Senior Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 60.00 Landscape Architecture: Asakura Robinson Senior Support Personnel $ 125.00 Support Personnel $ 68.00 Civil Engineering Xxxxxxx Engineering & Surveying Co., Inc. Principal $ 200 $225.00 Associate Principal 175 Administrative Staff $160.00 Cost Consultant: Vermeulens Principal $280.00 Associate Principal $250.00 Associate / Director $220.00 Senior Project Manager 175 $190.00 Project Manager 150 / Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering Designer 100 Construction Administrator 120 BIM/CADD Technician 90 Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Principal – Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75/day Research 50 Administrative Staff 60 Landscape Architecture Xxxxxxx & Associates Principal $ 160 Landscape Architect 125 Administrative Staff 50 Estimator / IT $160.00 Estimator / Support $130.00 Data/Telecommunications Consultant Consultant: 4b Technology Group Principal $ 195 Principal-in-Charge $225.00 Project Manager 185 $185.00 Senior Consultant 165 $165.00 Consultant 145 BIM/CADD Technician 95 $145.00 Revit / CAD Professional $110.00 Administrative Staff 65 Acoustical/Audio-Visual Consultant 4b Technology Group Principal $195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Security Consultant 4b Technology Group Principal Assistant $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Senior Designer $ 100.00 BIM/CADD Technician $ 85.00 Administrative Staff $ 60.00 65.00 EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Project Number: Brief Project Description: Additional Project Information: Construction Delivery Method: Project Schedule/Phases/Milestones: Include BIM milestones, pre-design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring Design Reviews Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Interference Check Detect problems in the model where two building components are clashing including soft and hard Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model Structural Model Mechanical Model Plumbing Model Fire Sprinkler Model Electrical Model Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). Measurement and Coordinate System Describe the measurement system and coordinate system used. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTS

Appears in 1 contract

Samples: assets.system.tamus.edu

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, the following number of sets of review documents at the required review stages: Schematic Design: 5 (1/2 size3) ½ size sets with narratives Design Development: 5 (1/2 size3) ½ size sets for 25% and 100% with specifications Construction Documents: 5 (1/2 size) sets for 25%, 50% & 75% 100% with specifications complete Construction Documents: 5 (1/2 size3) ½ size sets for 100% complete with specifications The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. FirmFU irm/Position Classification Hourly UHourly Billing Rate Architecture EYP Inc. (Perkins&Will) Principal $ 195-310 Associate Principal 145-220 $300.00 Project Manager 145-220 $220.00 Technical Coordinator $220.00 Senior Interior Designer $180.00 Project Architect I 195-310 $120.00 Administrative Staff $ 80.00 MEP Engineering (Xxxx Xxxxx & Associates) Principal $268.00 Project Architect II 145-222 Project Designer 195-310 Project Designer 195-310 Manager $190.00 Senior Lab Planner 250 Lab Planner 145-220 Construction Administrator 145-220 Intern Architect 75-130 Engineer $190.00 Engineer $169.00 BIM/CADD Technician 75-130 $124.00 Administrative Staff 55-110 Co Architecture O’Xxxxxxx Xxxxxxxxx $ 89.00 Structural Engineering (Xxxxxx X. Xxxxx) Principal $ 200 Associate Principal $340.00 Senior Project Manager 160 Project Architect I 155 Project Architect II Project Designer 105 Construction Administrator 130 Intern Architect 90 $260.00 Engineer $140.00 Graduate Engineer $120.00 BIM/CADD Technician 90 $130.00 Administrative Staff 70 MEP Engineering O’Xxxxxxx Xxxxxxxxx Principal $ 220 Project Manager 160 Senior Engineer 175 Engineer 165 Engineering Designer 115 Construction Administrator 130 BIM/CADD Technician 90 Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC Principal $ 205 Project Manager 176 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Administrator 105 BIM/CADD Technician 93 Administrative Staff 66 Structural Engineering Datum Xxxx, LLC Senior Principal $ 255.00 Principal $ 185.00 Senior Project Manager $ 160.00 Project Manager $ 145.00 Project Engineer $ 115.00 Graduate Engineer $ 100.00 Senior Production Manager $ 150.00 Senior Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 Civil Engineering Xxxxxxx Engineering & Surveying Co., Inc. Principal $ 200 Associate Principal 175 Senior Project Manager 175 Project Manager 150 Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering Designer 100 Construction Administrator 120 BIM/CADD Technician 90 Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Principal – Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75/day Research 50 Administrative Staff 60 Landscape Architecture Xxxxxxx & Associates Principal $ 160 Landscape Architect 125 Administrative Staff 50 80.00 Data/Telecommunications Consultant 4b Technology Group (DataCom Group) Principal $ 195 Project Manager 185 $198.00 Senior Consultant 165 $160.00 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Acoustical/Audio-Visual Consultant 4b Technology Group Principal $195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Security Consultant 4b Technology Group Principal 138.00 Contract Administrator $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Senior Designer $ 100.00 98.00 BIM/CADD Technician $ 85.00 67.00 Administrative Staff $ 60.00 58.00 Life Safety Consultant (Xxxxxx Xxxxxx & Associates) Principal $300.00 Director $250.00 Senior Consultant $220.00 Consultant $190.00 Contract Administrator $140.00 Administrative Staff $110.00 _ EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Project Number: Brief Project Description: Additional Project Information: Construction Delivery Method: Project Schedule/Phases/Milestones: Include BIM milestones, pre-design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring Design Reviews Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Interference Check Detect problems in the model where two building components are clashing including soft and hard Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model Structural Model Mechanical Model Plumbing Model Fire Sprinkler Model Electrical Model Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). Measurement and Coordinate System Describe the measurement system and coordinate system used. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTS

Appears in 1 contract

Samples: assets.system.tamus.edu

AutoNDA by SimpleDocs

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, Refer to Exhibit C: Document Distribution Matrix for the following required number of sets of documents required for each review documents at the required review stages: Schematic Design: 5 (1/2 size) sets with narratives Design Development: 5 (1/2 size) sets for 25% and 100% with specifications Construction Documents: 5 (1/2 size) sets for 25%, 50% & 75% 100% with specifications Construction Documents: 5 (1/2 size) sets for 100% complete with specifications stage. The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan Ex C Document Distribution Matrix EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. FirmUFirm/Position Classification Hourly Architecture – Xxxxxxx+Will UHourly Billing Rate Architecture EYP Inc. Principal $ 195-310 $325/hr Associate Principal 145-220 $275/hr Project Manager 145-220 $240/hr Project Architect I 195-310 $205/hr Project Architect II 145-222 $240/hr Project Designer 195-310 Project Designer 195-310 Senior Lab Planner 250 Lab Planner 145-220 $240/hr Construction Administrator 145-220 $205/hr Intern Architect 75-130 $105/hr Arch I $120/hr Arch II $130/hr Arch III $170/hr Specifications Writer $240/hr BIM/CADD Technician 75-130 $130/hr Administrative Staff 55-110 Co $95/hr Design Architecture O’Xxxxxxx Xxxxxxxxx - Xxxxxxx+Will Principal $ 200 $325/hr Associate Principal $275/hr Project Manager 160 $240/hr Project Architect I 155 $205/hr Project Architect II $240/hr Project Designer 105 $240/hr Construction Administrator 130 $205/hr Intern Architect 90 $105/hr Arch I $120/hr Arch II $130/hr Arch III $170/hr Specifications Writer $240/hr BIM/CADD Technician 90 $130/hr Administrative Staff 70 $95/hr MEP Engineering O’Xxxxxxx Xxxxxxxxx Principal $ 220 Project Manager 160 – WSPennington + ccrd Executive Vice President $250.00/hr Vice President $200.00/hr Senior Associate $150.00/hr Associate $135.00/hr Senior Engineer 175 $125.00/hr Engineer 165 Engineering $115.00/hr Senior Designer 115 $110.00/hr Designer $90.00/hr Construction Administrator 130 $90.00/hr BIM/CADD Technician 90 $75.00/hr Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC $65.00/hr Commissioning – WSPennington + ccrd Principal $ 205 in Charge of Commissioning $220.00/hr Commissioning Group Manager $165.00/hr CxA Project Manager 176 $145.00/hr Cx Provider – MEP Engineer $125.00/hr Cx Provider – MEP Specialist $110.00/hr Cx Project Delivery Support $65.00/hr Clerical $45.00/hr Structural Engineering – Ensight Xxxxxx Xxxxxx Principal $275/hr Associate Principal $195/hr Senior Project Manager $175/hr Project Manager $175/hr Senior Engineer 160 Quality Control Supervisor 148 $165/hr Engineer 126 $135/hr Graduate Engineer 115 Senior Engineer $110/hr Engineering Designer 115 Engineer Designer 93 $110/hr Construction Administrator 105 $110/hr BIM/CADD Technician 93 $110/hr Administrative Staff 66 Structural $85/hr Civil Engineering Datum Xxxx, LLC Senior – JQ Partner $240/hr Principal $ 255.00 Principal $ 185.00 $210/hr Engineering Tech Lead $190/hr Senior Project Manager $ 160.00 $170/hr Project Manager $ 145.00 Project Engineer $ 115.00 Graduate Engineer $ 100.00 Senior Production Manager $ 150.00 Senior Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 Civil Engineering Xxxxxxx Engineering & Surveying Co., Inc. Principal $ 200 Associate Principal 175 Senior Project Manager 175 Project Manager 150 $155/hr Senior Engineer 175 $135/hr Engineer 150 Graduate Engineer 115 $120/hr Senior Engineering Designer 100 Construction Administrator 120 $110/hr BIM/CADD Technician 90 $90/hr Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Landscape Architecture – TBG Partners $75/hr Principal – Registered Professional Land Surveyor $ 140 $165/hr Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) $75/day Research 50 hr Landscape Architect $65/hr Administrative Staff 60 Landscape Architecture Xxxxxxx & Associates $50/hr Cost Consultant – Project Cost Resources Principal $ 160 Landscape Architect 125 $190/hr Senior Estimator $135/hr Estimator $65/hr Administrative Staff 50 Data$45/Telecommunications Consultant 4b Technology hr Technology/Security – Datacom Design Group Principal $ 195 $190/hr Associate Principal $180/hr Senior Project Manager 185 $170/hr Senior Technology Consultant 165 $145/hr Technology Consultant 145 $124/hr Contract Administrator $98/hr BIM/CADD Technician 95 $65/hr Administrative Staff 65 Acoustical$56/Audio-Visual hr Acoustical Consultant 4b Technology Group – JEAcoustics Principal $195 Project Manager 185 248/hr Senior Associate $215/hr Associate $190/hr Senior Consultant 165 $150/hr Consultant 145 $115/hr BIM/CADD Technician 95 $85/hr Administrative Staff 65 Security $65/hr Laboratory Consultant 4b Technology Group – Xxxxxxx+Will Principal $ 195 Project Manager 185 Senior $325/hr Laboratory Consultant 165 Consultant 145 $240/hr Laboratory Design Engineer $240/hr Technical Coordinator $180/hr Laboratory Programmer $240/hr Laboratory Designer $240/hr Production Coordinator $205/hr Arch I $120/hr Arch II $130/hr Arch III Specifications Writer $170/hr $240/hr BIM/CADD Technician 95 $130/hr Technical Writer $180/hr Administrative Staff 65 Energy $95/hr Fire Protection & Code Consultant The Xxxxx Group – Xxxxxx Xxxxxx Principal - Energy $ 245 $265/hr Project Director $230/hr Project Manager III - Energy 175 $205/hr Project Manager II - Energy 140 Consultant $135/hr Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Engineer $150/hr Project Manager $ 150.00 Life SafetyAdministrator $125/Code Specialist $ 125.00 Senior Designer $ 100.00 hr BIM/CADD Technician $ 85.00 N/A Administrative Staff $ 60.00 Included in overhead Wind Analysis Consultant - CPP Principal $336/hr Project Director $246/hr Project Manager $200/hr Engineering Technician $84/hr Project Engineer $182/hr BIM/CADD Technician $122/hr Administrative Staff $90/hr Geotechnical Consultant - Terracon Principal $200/hr Project Director $170/hr Project Manager $150/hr Project Consultant $120/hr Project Engineer $110/hr BIM/CADD Technician $60/hr Administrative Staff $50/hr EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- cost‐ effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Project Number: Brief Project Description: Additional Project Information: Construction Delivery Method: Project Schedule/Phases/Milestones: Include BIM milestones, pre-design pre‐design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring Design Reviews Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time One‐Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Interference Check Detect problems in the model where two building components are clashing including soft and hard Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant non‐compliant elements and corrective action plans Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model Structural Model Mechanical Model Plumbing Model Fire Sprinkler Model Electrical Model Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). Measurement and Coordinate System Describe the measurement system and coordinate system used. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- /‐ [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- /‐ [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- /‐ [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTSATTACHMENTS List any supporting information and attach. TAMUS/FPC Review Document Distribution Matrix Project : 02-3205 Biocontainment Research Facility Recipient SD 100% Review DD 100% Review CD 50% Review CD 100% Review FC1 For Const. Package 1 FC2 For Const. Package 2 FC3 For Const. Package 3

Appears in 1 contract

Samples: assets.system.tamus.edu

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, the following number of sets of review documents at the required review stages: Schematic Design: 5 (1/2 size) sets with narratives Design Development: 5 (1/2 size) 1 set 2 sets for 25% and 100% with specifications Construction Documents: 5 (1/2 size) sets 1 set for 25%, 50% & 75% 100% with specifications complete Construction Documents: 5 (1/2 size) 3 sets for 100% complete with specifications The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or listingsand/or position classifications may be added as needed or required by the project. PERSONNEL TITLES AND HOURLY RATES Firm/Position Classification Hourly Billing Rate Architecture EYP Inc. Principal $ 195Civil Engineer – Xxxxxx-310 Associate Principal 145-220 Project Manager 145-220 Project Architect I 195-310 Project Architect II 145-222 Project Designer 195-310 Project Designer 195-310 Senior Lab Planner 250 Lab Planner 145-220 Construction Administrator 145-220 Intern Architect 75-130 BIM/CADD Technician 75-130 Administrative Staff 55-110 Co Architecture O’Xxxxxxx Xxxxxxxxx Principal $ 200 Associate Principal Project Manager 160 Project Architect I 155 Project Architect II Project Designer 105 Construction Administrator 130 Intern Architect 90 BIM/CADD Technician 90 Administrative Staff 70 MEP Engineering O’Xxxxxxx Xxxxxxxxx Principal $ 220 Project Manager 160 Senior Engineer 175 Engineer 165 Engineering Designer 115 Construction Administrator 130 BIM/CADD Technician 90 Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC Principal $ 205 Project Manager 176 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Administrator 105 BIM/CADD Technician 93 Administrative Staff 66 Structural Engineering Datum Xxxx, LLC Senior Principal $ 255.00 Principal $ 185.00 Senior Project Manager $ 160.00 Project Manager $ 145.00 Project Engineer $ 115.00 Graduate Engineer $ 100.00 Senior Production Manager $ 150.00 Senior Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 Civil Engineering Xxxxxxx Engineering & Surveying Co.Xxxx and Associates, Inc. Principal $ 200 Associate Principal 175 Senior Project Manager 175 Project Manager 150 Professional Professional Analyst Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering Designer 100 Construction Administrator 120 BIM/CADD Technician 90 Technical Support Technical Support Administrative Staff 60 Surveying $285.00 $220.00 $175.00 $145.00 $150.00 $110.00 $ 90.00 Cost and Scheduling Services – Xxxxxxx Project Resources, LLC Principal Lead Estimator Estimator Senior Scheduler $175.00 $150.00 $135.00 $145.00 Survey – Gorrondona & Associates, Inc. Project Coordinator (am, ap, hal) Certified Photogrammetrist Orthophoto Specialist Aerial Mapping Technician Mapping Editor Aerial Office Technician Photo Processing Technician Aerial Photography/Helicopter Lidar Flight Crew Mobile Lidar Processing Technician Admin/Clerical $130.00 $ 98.00 $ 86.00 $ 88.00 $ 86.00 $ 74.00 $ 74.00 $200.00 $105.00 $ 60.00 Geotechnical Engineer – CME Engineering & Surveying Co.and Testing, Inc. Principal – Registered Professional Land Surveyor Engineer Senior Engineer Project Engineer Staff Engineer Technical Drafting Production Graphics Senior Field Geotechnologist Field Geotechnologist $140.00 $125.00 $110.00 $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75/day Research 50 Administrative Staff 60 Landscape Architecture Xxxxxxx & Associates Principal 95.00 $ 160 Landscape Architect 125 Administrative Staff 50 Data/Telecommunications Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Acoustical/Audio-Visual Consultant 4b Technology Group Principal $195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Security Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Senior Designer $ 100.00 BIM/CADD Technician $ 85.00 Administrative Staff 70.00 $ 60.00 $ 55.00 $ 48.00 EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Project Number: Brief Project Description: Additional Project Information: Construction Delivery Method: Project Schedule/Phases/Milestones: Include BIM milestones, pre-design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring Design Reviews Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Interference Check Detect problems in the model where two building components are clashing including soft and hard Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model Structural Model Mechanical Model Plumbing Model Fire Sprinkler Model Electrical Model Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). Measurement and Coordinate System Describe the measurement system and coordinate system used. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTSATTACHMENTS CONTRACT FOR ARCHTIECT / ENGINEER SERVICES ATTACHMENT NO. 1 SCOPE OF WORK RELLIS RUNWAY 35R REHABILITATION PROJECT NO. 01-3331 Prepare the Engineering Design for the paving rehabilitation for Runway 35R at the RELLIS campus. The following assumptions and exclusions based on the original Program of Requirements have been made: ASSUMPTIONS o Previously obtained LIDAR data will be reprocessed for feature extraction including crack mapping. o Original LIDAR data will be used for topographic survey purposes. o Field survey for establishment of construction control and on-ground topographic survey. o Up to 10 Geotechnical borings in existing pavement. o Survey of existing conditions with an inertial profiler to establish baseline IRI values. o Post construction survey with an inertial profiler to establish final IRI values. o Development of plans and specifications for the replacement or rehabilitation of existing pavement and pavement joints. o Development of phased construction plans coordinated with RELLIS / TTI schedules. o Development of estimated construction schedule and sequencing for coordination with users. o Opinion of probable construction cost provided at each project milestone. o Construction phase services. BASIC SERVICES

Appears in 1 contract

Samples: assets.system.tamus.edu

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, the following number of sets of review documents at the required review stages: Schematic Design: 5 (1/2 sizeSize) & 2 (Full Size) sets with narratives Design Development: 5 (1/2 sizeSize) & 2 (Full Size) sets for & 3 sets specifications Construction Documents: 2 (Full Size progress sets) 25% and 100% with specifications %, 50%, Construction Documents: 5 (1/2 sizeSize) & 2 (Full Size) sets for 25%, 50% & 75% 100% with specifications Construction Documents: 5 (1/2 size) sets for 100% complete with specifications A/E -XXXX BIM Contract No. 5918 02/16 Project No. 17- 3207 The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan EXHIBIT Exhibit A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this scheduleCompany Name Hourly Rate BRW Architects, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. Firm/Position Classification Hourly Billing Rate Architecture EYP Inc. Project Principal $ 195-310 Associate Principal 145-220 $240.00 Project Director $200.00 Project Manager 145-220 $175.00 Project Architect $140.00 Architect $120.00 Intern Architect I 195-310 Project $90.00 Intern Architect II 145-222 $75.00 Administrative Staff $70.00 HGA Architects & Engineers Principal $175 - $250 Design Principal $250 - $370 Project Manager $130 - $180 Senior Project Designer 195-310 $140 - $160 Project Designer 195$115 - $165 Arts Specialist/Planner $155 - $240 Visualization Specialist $ 95 - $170 Senior Project Architect/Coordinator $105 - $250 Project Architect/Coordinator $ 95 - $195 Architect or Design Coordinator $ 85 - $125 Intern or Technician $ 75 - $110 Senior Interior Designer or Senior Designer $110 - $200 Interior Designer or Designer $ 85 - $130 Junior Interior Designer $ 70 - $105 Senior Landscape Architect/Designer $135 - $165 Landscape Architect/Designer $100 - $135 Intern Landscape Designer $ 80 - $ 95 Senior Project Engineer $135 - $265 Project Engineer or Senior Designer $100 - $175 Engineer or Designer $ 90 - $140 Staff $ 70 - $125 Industrial Engineer $125 - $235 Lighting Designer $105 - $195 Telecommunications Designer $165 - $175 Project Specifier $105 - $245 Cost Estimator $175 - $210 Administrative Assistant $ 60 - $145 Research Librarian/Specialist $100 - $140 Urban Engineering Civil Engineering Tech I Engineering Tech II $65.00 $75.00 Engineering Tech III $90.00 Engineering Tech IV $115.00 Engineer I $95.00 Engineer II (EIT) $105.00 Engineer III (PE) $125.00 Engineer IV (PE) $150.00 Engineer V (PE) $155.00 Engineer VI (PE) $170.00 Engineer VII (PE) $225.00 Principal Engineer $240.00 Sr. Administrative Asst. $85.00 Survey Administrative Asst. $70.00 Administrative Asst. $65.00 Print Clerk $45.00 Resident Inspector $75.00 Surveying Survey Tech I $50.00 Survey Tech II $70.00 GIS Specialist $80.00 Platting Specialist $95.00 Surveyor I (SIT) $80.00 Surveyor II (RPLS) $120.00 Surveyor III (RPLS) $145.00 Surveyor IV (RPLS) $160.00 Survey Operations Manager $105.00 2-310 Men Field Crew $150.00 3-Men Field Crew $195.00 Xxxxxx Xxxxxxxx / Acoustic Distinctions Principal Consultant $300.00 Senior Lab Planner 250 Lab Planner 145Associate VP $260.00 Senior Associate $260.00 Senior Consultant $210.00 Consultant $175.00 Designer $140.00 Technical Support $100.00 Xxxxxxx Xxxxx Partners $260.00 Principals $235.00 Senior Theatre Consultants $185.00 Project Theatre Consultants $135.00 Theatre Consultants $120.00 Drafters, Specialists $90.00 Travel One-220 Construction Administrator 145-220 Intern Architect 75-130 BIM/CADD half hourly rate JQ Infrastructure, LLC Partner $240.00 Principal $210.00 Senior Project Manager $175.00 Engineering Technical Lead $190.00 Project Manager $155.00 Senior Project Engineer $135.00 Project Engineer $120.00 Senior Technician 75-130 $110.00 Technician $90.00 Administrative Staff 55-110 Co Architecture O’Xxxxxxx Xxxxxxxxx Principal $ 200 Associate $75.00 Xxxx Xxxxx & Associates Principal Project Manager 160 Project Architect I 155 Project Architect II Project Department Head/Associate Engineer, Design Coordinator, Construction Coordinator CADD Specialist/Designer 105 Construction Administrator 130 Intern Architect 90 BIM/CADD Technician 90 Administrative Staff 70 MEP Engineering O’Xxxxxxx Xxxxxxxxx Clerical Datacom Design Group $263.00 $186.00 $186.00 $161.00 $118.00 $85.00 Principal $ 220 Project Manager 160 Senior Engineer 175 Engineer 165 Engineering Designer 115 Construction Administrator 130 BIM/CADD Technician 90 Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC $190.00 Associate Principal $ 205 Project Manager 176 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Administrator 105 BIM/CADD Technician 93 Administrative Staff 66 Structural Engineering Datum Xxxx, LLC Senior Principal $ 255.00 Principal $ 185.00 $180.00 Senior Project Manager $ 160.00 Project Manager $ $170.00 Senior Technology Consultant $145.00 Project Engineer $ 115.00 Graduate Engineer $ 100.00 Technology Consultant $124.00 Contract Administration $98.00 Technology Support (CAD / BIM) $65.00 Clerical / Accounting $56.00 J. Xxxxxx Xxxxxxxx Landscape Architects Principal $175.00 Senior Production Manager $ 150.00 Senior Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 Civil Engineering Xxxxxxx Engineering & Surveying Co., Inc. Principal $ 200 Associate Principal 175 Senior Project Manager 175 Project Manager 150 Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering Designer 100 Construction Administrator 120 BIM/CADD Technician 90 Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Principal – Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75/day Research 50 Administrative Staff 60 Landscape Architecture Xxxxxxx & Associates Principal $ 160 Landscape Architect 125 Administrative $115.00 Staff 50 Data/Telecommunications Landscape Architect $100.00 Landscape Designer $90.00 CADD $80.00 Irrigation Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Acoustical/Audio-Visual Consultant 4b Technology Group Principal $195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Security Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance 100.00 Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Engineering President $175.00 Senior Designer $ 100.00 BIM/CADD $125.00 Designer $85.00 CAD Operator $60.00 Clerical $50.00 Abadi Accessibility & Architecture Principal HVJ $150.00 Principal $245.00 Senior Engineer $170.00 Environmental Scientist $126.00 Project Engineer $128.00 Staff Engineer I $93.00 Staff Engineer II $104.00 Senior Engineering Technician $ 85.00 Administrative Staff $ 60.00 $90.00 Engineering Assistant $55.00 Project Administration $64.00 EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) Xxxxxx Xxxxxxxx BRW Architects PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- effectively. If the delivery method is competitive sealed proposal proposal, then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Texas A&M University-Kingsville Education Complex Project Number: Brief Project Description: Additional Project Information: Construction Delivery Method: Project Schedule/Phases/Milestones: Include BIM milestones, pre17-design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring Design Reviews Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Interference Check Detect problems in the model where two building components are clashing including soft and hard Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model Structural Model Mechanical Model Plumbing Model Fire Sprinkler Model Electrical Model Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). Measurement and Coordinate System Describe the measurement system and coordinate system used. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTS3207

Appears in 1 contract

Samples: assets.system.tamus.edu

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, the following number of sets of review documents at the required review stages: Schematic Design: 5 (1/2 size) 0 sets with narratives Design Development: 5 (1/2 size) 0 sets for 25% and 100% with specifications Construction Documents: 5 (1/2 size) 2 sets for 25%, 50% & 75% 100% with specifications complete Construction Documents: 5 (1/2 size) 2 sets for 10090% complete with specifications [SIGNATURES PROVIDED ON FOLLOWING PAGE] The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. FirmFU irm/Position Classification Hourly UHourly Billing Rate Architecture EYP Inc. - Energy Architecture Principal $ 195-310 Associate Principal 145-220 $225 Senior Project Manager 145-220 $200 Project Manager $175 Senior Project Architect I 195-310 $140 Laboratory Planner $125 Project Architect II 145-222 Project Designer 195-310 Project Designer 195-310 Senior Lab Planner 250 Lab Planner 145-220 Construction Administrator 145-220 $115 Intern Architect 75-130 BIM/CADD Technician 75-130 Administrative Staff 55-110 Co Architecture O’Xxxxxxx Xxxxxxxxx Principal $ 200 Associate Principal Project Manager 160 Project Architect I 155 Project Architect II Project Designer 105 Construction Administrator 130 Intern Architect 90 BIM/CADD Technician 90 Administrative Staff 70 $ 65 MEP Engineering O’Xxxxxxx Xxxxxxxxx – Xxxx Xxxxx and Associates, Inc. Principal $ 220 $271 Project Manager 160 $191 Department Head/Associate $191 Engineer, Design Coordinator/Const. Coord. $173 CAD Specialist/Designer $127 Clerical $ 91 Structural/Civil Engineering - Xxxxxxx Engineering Principal $200 Senior Engineer 175 $160 Prof. Engineer 165 Engineering Designer 115 Construction Administrator 130 BIM/CADD Technician 90 / Land Surv. / CMT Manager / Survey Crew $135 Graduate Engineer II $105 Graduate Engineer I $ 80 Designer/ / Survey Tech $ 80 Clerical / Drafter / Drilling Manager $ 60 Landscape Architecture – TBD Principal $200 Landscape Architect $150 Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC $ 80 Cost Consultant – Vermeulens Principal $ 205 Project Manager 176 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Administrator 105 BIM/CADD Technician 93 Administrative Staff 66 Structural Engineering Datum Xxxx, LLC Senior $280 Associate Principal $ 255.00 Principal $ 185.00 $250 Associate Director $220 Senior Project Manager $ 160.00 $190 Project Manager $ 145.00 Project Engineer $ 115.00 Graduate Engineer $ 100.00 / Senior Production Manager $ 150.00 Senior Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 Senior Estimator / IT $160 Estimator / Support Personnel $ 125.00 Support Personnel $ 68.00 Civil Engineering Xxxxxxx Engineering & Surveying Co., Inc. Principal $ 200 Associate Principal 175 Senior Project Manager 175 Project Manager 150 Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering Designer 100 Construction Administrator 120 BIM/CADD Technician 90 Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Principal – Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75/day Research 50 Administrative Staff 60 Landscape Architecture Xxxxxxx & Associates Principal $ 160 Landscape Architect 125 Administrative Staff 50 $130 Data/Telecommunications Consultant 4b Technology Group – Datacom Principal $ 195 $190 Associate Principal $180 Senior Project Manager 185 $170 Senior Technology Consultant 165 $145 Technology Consultant 145 BIM/CADD Technician 95 Administrative Staff $124 Contract Administrator $ 98 Technology Support $ 65 Acoustical/Audio-Visual Consultant 4b Technology Group Principal $195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Security Consultant 4b Technology Group Principal Clerical / Accounting $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Senior Designer $ 100.00 BIM/CADD Technician $ 85.00 Administrative Staff $ 60.00 56 EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Project Number: Brief Project Description: Additional Project Information: Construction Delivery Method: Project Schedule/Phases/Milestones: Include BIM milestones, pre-design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring Design Reviews Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Interference Check Detect problems in the model where two building components are clashing including soft and hard Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model Structural Model Mechanical Model Plumbing Model Fire Sprinkler Model Electrical Model Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). Measurement and Coordinate System Describe the measurement system and coordinate system used. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTS

Appears in 1 contract

Samples: assets.system.tamus.edu

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, the following number of sets of review documents at the required review stages: Schematic Design: 5 (1/2 size) sets with narratives Design Development: 5 (1/2 size) 2 sets for 25% and 100% with specifications 2 sets Construction Documents: 5 (1/2 size) 2 sets for 25%, 50% & 75% 100% with specifications complete Construction Documents: 5 (1/2 size) 2 sets for 100% complete with specifications The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. FirmUFirm/Position Classification Hourly Architecture and Interior Design [Xxxxxxx+Will] HU ourly Billing Rate Architecture EYP Inc. Principal $ 195-310 $345.00 Associate Principal 145-220 295.00 Senior Project Manager 145-220 285.00 Project Manager 260.00 Senior Project Architect I 195-310 250.00 Project Architect II 145-222 220.00 Senior Project Designer 195-310 260.00 Project Designer 195-310 220.00 Senior Lab Planner 250 Lab Planner 145-220 Construction Administrator 145-220 Technical Coordinator 245.00 Technical Coordinator 220.00 Arch III / Design III 180.00 Arch II / Design II 140.00 Arch I / Design I 130.00 Intern Architect 75-130 115.00 Administrative Staff 100.00 MEP Engineering [WSP and M3T CxA Authorities] Executive Vice President $300.00 Senior Vice President 250.00 Vice President 225.00 Senior Associate 160.00 Associate 140.00 Senior Fire Protection Engineer 180.00 Senior Engineer 125.00 Fire Protection Engineer 150.00 Engineer 115.00 Senior Designer 110.00 Designer 90.00 BIM/CADD Technician 75-130 75.00 Administrative Staff 55-110 Co Architecture O’Xxxxxxx Xxxxxxxxx 65.00 Structural Engineering [Structures] Principal $ 200 $200.00 Associate Principal 200.00 Senior Project Manager 160 160.00 Project Architect I 155 Project Architect II Project Manager 145.00 Engineer 130.00 Graduate Engineer 100.00 Engineering Designer 105 Construction Administrator 130 Intern Architect 90 90.00 BIM/CADD Technician 90 65.00 Administrative Staff 70 MEP 60.00 Civil Engineering O’Xxxxxxx Xxxxxxxxx [JQ] Partner $240.00 Principal $ 220 210.00 Engineering Technical Lead 190.00 Senior Project Manager 160 175.00 Project Manager 155.00 Senior Project Engineer 175 135.00 Project Engineer 165 Engineering 120.00 Senior Technician 110.00 Technician 90.00 Administrative Staff 75.00 Senior Registered Professional Land Surveyor 165.00 Registered Professional Land Surveyor 125.00 Survey Crew 160.00 Landscape Architecture [TBG] Principal $165.00 Landscape Architect 90.00 Administrative Staff 65.00 Cost Consultant [Project Cost Resources] Principal $190.00 Senior Estimator 136.00 Estimator 60.00 Data/Telecommunications and Audio-Visual Consultant [Datacom] Principal $190.00 Associate 180.00 Senior Consultant 145.00 Consultant/Designer 115 Construction Administrator 130 124.00 BIM/CADD Technician 90 65.00 Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC 56.00 Acoustical Consultant [JEAcoustics] Principal $ 205 Project Manager 176 $260.00 Associate 200.00 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Consultant 160.00 Consultant 125.00 Contract Administrator 105 75.00 BIM/CADD Technician 93 Administrative Staff 66 Structural Engineering Datum Xxxx, LLC Senior Principal $ 255.00 Principal $ 185.00 Senior Project Manager $ 160.00 Project Manager $ 145.00 Project Engineer $ 115.00 Graduate Engineer $ 100.00 Senior Production Manager $ 150.00 Senior Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 Civil Engineering Xxxxxxx Engineering & Surveying Co., Inc. Principal $ 200 Associate Principal 175 Senior Project Manager 175 Project Manager 150 Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering Designer 100 Construction Administrator 120 BIM/CADD Technician 90 Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Principal – Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75/day Research 50 Administrative Staff 60 Landscape Architecture Xxxxxxx & Associates Principal $ 160 Landscape Architect 125 Administrative Staff 50 Data/Telecommunications Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Acoustical/Audio-Visual Consultant 4b Technology Group Principal $195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Security Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Senior Designer $ 100.00 BIM/CADD Technician $ 85.00 Administrative Staff $ 60.00 65.00 Fire Protection/Code Consultant [Xxxxxx Xxxxxx] Project Director $250.00 Project Manager 220.00 Project Consultant 150.00 Project Engineer 180.00 EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) Xxxxxxx+Will PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Texas A&M Veterinary Education, Research & Outreach Center, Canyon, Texas Project Number: 02-3266 Brief Project Description: Additional Project Information: Construction Delivery Method: Construction Manager @ Risk Project Schedule/Phases/Milestones: Include BIM milestones, pre-design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone Xxxxxxx+Will (Arch) Xxxxxx Xxxxx Design Applications Manager Houston Xxxxxx.xxxxx@xxxxxxxxxxx.xxx 713.366.4000 WSP (MEP) Structures(Structure) JQ (Civil) TBG (Landscape) DataCom (IT/AV) BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring • Each discipline is responsible for authoring their respective BIMs. Design Reviews • Each discipline will participate in design reviews as scheduled by Xxxxxxx+Will throughout the design and documentation process. Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) • Each discipline will be responsible for the coordination of their own systems. The team as a whole will be subject to Clash Detection reports generated by Xxxxxxx+Will. The reports will be reviewed during the Design Review meetings. Model Updates during Construction • Each Discipline will be responsible for updating their BIMs accordingly through the Construction phase of the project. Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed All team members Revit Daily Interference Check Detect problems in the model where two building components are clashing including soft and hard Xxxxxxx+Will Revit, Navisworks Before each major milestone Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) All team members Revit Daily Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans All team members Revit Daily Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model ARCH_VERO Structural Model STRU_VERO Mechanical Model MECH_VERO Plumbing Model PLBG_VERO Fire Sprinkler Model (to be included in plumbing) Electrical Model ELEC_VERO Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). In an ideal situation, the model will not be separated. If it does need to be separated because of file size or complexity, the first step would be to break apart the Shell or Skin of the building from the Build-Out. If further separation is needed, the models would be analyzed to determine how to best accomplish this and still easily maintain documentation all the way through the construction phase of the project. Measurement and Coordinate System Describe the measurement system and coordinate system used. The Coordinate and Measurement Systems to be used will be established by Xxxxxxx+Will and inherited by the other disciplines. The model will be placed as accurately as possible on a global map using a Geographic Information System (GIS). Doing this will ensure the daylighting and solar analysis is completed accurately for the location of the project. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTS

Appears in 1 contract

Samples: assets.system.tamus.edu

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, the following number of sets of review documents at the required review stages: Schematic Design: 5 (1/2 sizeSize) & 2 (Full Size) sets with narratives Design Development: 5 (1/2 sizeSize) & 2 (Full Size) sets for & 3 sets specifications Construction Documents: 2 (Full Size progress sets) 25% and 100% with specifications %, 50%, Construction Documents: 5 (1/2 sizeSize) & 2 (Full Size) sets for 25%, 50% & 75% 100% with specifications Construction Documents: 5 (1/2 size) sets for 100% complete with specifications A/E -XXXX BIM Contract No. 5918 02/16 Project No. 17- 3207 The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan EXHIBIT Exhibit A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this scheduleCompany Name Hourly Rate BRW Architects, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. Firm/Position Classification Hourly Billing Rate Architecture EYP Inc. Project Principal $ 195-310 Associate Principal 145-220 $240.00 Project Director $200.00 Project Manager 145-220 $175.00 Project Architect $140.00 Architect $120.00 Intern Architect I 195-310 Project $90.00 Intern Architect II 145-222 $75.00 Administrative Staff $70.00 HGA Architects & Engineers Principal $175 - $250 Design Principal $250 - $370 Project Manager $130 - $180 Senior Project Designer 195-310 $140 - $160 Project Designer 195$115 - $165 Arts Specialist/Planner $155 - $240 Visualization Specialist $ 95 - $170 Senior Project Architect/Coordinator $105 - $250 Project Architect/Coordinator $ 95 - $195 Architect or Design Coordinator $ 85 - $125 Intern or Technician $ 75 - $110 Senior Interior Designer or Senior Designer $110 - $200 Interior Designer or Designer $ 85 - $130 Junior Interior Designer $ 70 - $105 Senior Landscape Architect/Designer $135 - $165 Landscape Architect/Designer $100 - $135 Intern Landscape Designer $ 80 - $ 95 Senior Project Engineer $135 - $265 Project Engineer or Senior Designer $100 - $175 Engineer or Designer $ 90 - $140 Staff $ 70 - $125 Industrial Engineer $125 - $235 Lighting Designer $105 - $195 Telecommunications Designer $165 - $175 Project Specifier $105 - $245 Cost Estimator $175 - $210 Administrative Assistant $ 60 - $145 Research Librarian/Specialist $100 - $140 Urban Engineering Civil Engineering Tech I Engineering Tech II $65.00 $75.00 Engineering Tech III $90.00 Engineering Tech IV $115.00 Engineer I $95.00 Engineer II (EIT) $105.00 Engineer III (PE) $125.00 Engineer IV (PE) $150.00 Engineer V (PE) $155.00 Engineer VI (PE) $170.00 Engineer VII (PE) $225.00 Principal Engineer $240.00 Sr. Administrative Asst. $85.00 Survey Administrative Asst. $70.00 Administrative Asst. $65.00 Print Clerk $45.00 Resident Inspector $75.00 Surveying Survey Tech I $50.00 Survey Tech II $70.00 GIS Specialist $80.00 Platting Specialist $95.00 Surveyor I (SIT) $80.00 Surveyor II (RPLS) $120.00 Surveyor III (RPLS) $145.00 Surveyor IV (RPLS) $160.00 Survey Operations Manager $105.00 2-310 Men Field Crew $150.00 3-Men Field Crew $195.00 Xxxxxx Xxxxxxxx / Acoustic Distinctions Principal Consultant $300.00 Senior Lab Planner 250 Lab Planner 145Associate VP $260.00 Senior Associate $260.00 Senior Consultant $210.00 Consultant $175.00 Designer $140.00 Technical Support $100.00 Xxxxxxx Xxxxx Partners $260.00 Principals $235.00 Senior Theatre Consultants $185.00 Project Theatre Consultants $135.00 Theatre Consultants $120.00 Drafters, Specialists $90.00 Travel One-220 Construction Administrator 145-220 Intern Architect 75-130 BIM/CADD half hourly rate JQ Infrastructure, LLC Partner $240.00 Principal $210.00 Senior Project Manager $175.00 Engineering Technical Lead $190.00 Project Manager $155.00 Senior Project Engineer $135.00 Project Engineer $120.00 Senior Technician 75-130 $110.00 Technician $90.00 Administrative Staff 55-110 Co Architecture O’Xxxxxxx Xxxxxxxxx Principal $ 200 Associate $75.00 Xxxx Xxxxx & Associates Principal Project Manager 160 Project Architect I 155 Project Architect II Project Department Head/Associate Engineer, Design Coordinator, Construction Coordinator CADD Specialist/Designer 105 Construction Administrator 130 Intern Architect 90 BIM/CADD Technician 90 Administrative Staff 70 MEP Engineering O’Xxxxxxx Xxxxxxxxx Clerical Datacom Design Group $263.00 $186.00 $186.00 $161.00 $118.00 $85.00 Principal $ 220 Project Manager 160 Senior Engineer 175 Engineer 165 Engineering Designer 115 Construction Administrator 130 BIM/CADD Technician 90 Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC $190.00 Associate Principal $ 205 Project Manager 176 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Administrator 105 BIM/CADD Technician 93 Administrative Staff 66 Structural Engineering Datum Xxxx, LLC Senior Principal $ 255.00 Principal $ 185.00 $180.00 Senior Project Manager $ 160.00 Project Manager $ $170.00 Senior Technology Consultant $145.00 Project Engineer $ 115.00 Graduate Engineer $ 100.00 Technology Consultant $124.00 Contract Administration $98.00 Technology Support (CAD / BIM) $65.00 Clerical / Accounting $56.00 X. Xxxxxx Xxxxxxxx Landscape Architects Principal $175.00 Senior Production Manager $ 150.00 Senior Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 Civil Engineering Xxxxxxx Engineering & Surveying Co., Inc. Principal $ 200 Associate Principal 175 Senior Project Manager 175 Project Manager 150 Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering Designer 100 Construction Administrator 120 BIM/CADD Technician 90 Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Principal – Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75/day Research 50 Administrative Staff 60 Landscape Architecture Xxxxxxx & Associates Principal $ 160 Landscape Architect 125 Administrative $115.00 Staff 50 Data/Telecommunications Landscape Architect $100.00 Landscape Designer $90.00 CADD $80.00 Irrigation Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Acoustical/Audio-Visual Consultant 4b Technology Group Principal $195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Security Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance 100.00 Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Engineering President $175.00 Senior Designer $ 100.00 BIM/CADD $125.00 Designer $85.00 CAD Operator $60.00 Clerical $50.00 Abadi Accessibility & Architecture Principal HVJ $150.00 Principal $245.00 Senior Engineer $170.00 Environmental Scientist $126.00 Project Engineer $128.00 Staff Engineer I $93.00 Staff Engineer II $104.00 Senior Engineering Technician $ 85.00 Administrative Staff $ 60.00 $90.00 Engineering Assistant $55.00 Project Administration $64.00 EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) Xxxxxx Xxxxxxxx XXX Architects PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- effectively. If the delivery method is competitive sealed proposal proposal, then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Texas A&M University-Kingsville Education Complex Project Number: Brief Project Description: Additional Project Information: Construction Delivery Method: Project Schedule/Phases/Milestones: Include BIM milestones, pre17-design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring Design Reviews Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Interference Check Detect problems in the model where two building components are clashing including soft and hard Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model Structural Model Mechanical Model Plumbing Model Fire Sprinkler Model Electrical Model Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). Measurement and Coordinate System Describe the measurement system and coordinate system used. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTS3207

Appears in 1 contract

Samples: assets.system.tamus.edu

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, the following number of sets of review documents at the required review stages: Schematic Design: 5 (1/2 size) 8 sets with narratives Design Development: 5 (1/2 size) 8 sets for 25% and 100% with specifications Construction Documents: 5 (1/2 size) 8 sets for 25%, 50% & 75% 100% with specifications complete Construction Documents: 5 (1/2 size) 8 sets for 100% complete with specifications Redacted The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed project. or required by the project. FirmUFirm/Position Classification Hourly UHourly Billing Rate Architecture EYP Inc. Engineering/Architect [Xxxxxxx Consultants] Principal $ 195-310 Associate Principal 145-220 Engineer $234.00 Senior Project Manager 145-220 $234.00 Project Architect I 195-310 Project Architect II 145-222 Project Manager $213.00 Senior Engineer $213.00 Engineer $178.00 Graduate Engineer $131.00 Engineering Designer 195-310 Project Designer 195-310 Senior Lab Planner 250 Lab Planner 145-220 Construction Administrator 145-220 Intern Architect 75-130 $121.00 BIM/CADD Technician 75-130 $111.00 Administrative Staff 55-110 Co Architecture O’Xxxxxxx Xxxxxxxxx $84.00 Principal $ 200 Associate Architect $234.00 Landscape Architect $131.00 Cost Estimator $121.00 Environmental Consultant [Xxxxxxx & Associates] Principal $200.00 Project Manager 160 Project Architect $140.00 Senior Environmental Professional $140.00 Staff Scientist II $120.00 Staff Scientist I 155 Project Architect $110.00 Environmental Tech II Project Designer 105 Construction Administrator 130 Intern Architect 90 BIM$110.00 Environmental Tech I $90.00 GIS Analyst/CADD Technician 90 Cartography $95.00 GIS Tech $80.00 Administrative Staff 70 MEP Engineering O’Xxxxxxx Xxxxxxxxx Principal $ 220 Project Manager 160 Senior Engineer 175 Engineer 165 Engineering Designer 115 Construction Administrator 130 BIM/CADD Technician 90 Administrative Staff 70 Co MEP Engineering CNG $70.00 Surveying Consultant [Xxxxxxx Engineering, PLLC Principal $ 205 Project Manager 176 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Administrator 105 BIM/CADD Technician 93 Administrative Staff 66 Structural Engineering Datum Xxxx, LLC Senior Principal $ 255.00 Principal $ 185.00 Senior Project Manager $ 160.00 Project Manager $ 145.00 Project Engineer $ 115.00 Graduate Engineer $ 100.00 Senior Production Manager $ 150.00 Senior Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 Civil Engineering Xxxxxxx Engineering & Surveying Co., Inc. Principal $ 200 Associate Principal 175 Senior Project Manager 175 Project Manager 150 Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering Designer 100 Construction Administrator 120 BIM/CADD Technician 90 Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Principal – ] Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 $120.00 Survey Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75/day Research 50 Administrative Staff 60 Landscape Architecture Xxxxxxx & Associates Principal $ 160 Landscape Architect 125 Administrative Staff 50 Data/Telecommunications Consultant 4b Technology Group Principal $ 195 Project $135.00 Survey Technician $80.00 Professional Engineer $120.00 Graduate Engineer $95.00 Drilling Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD $60.00 Draftsman $50.00 Technician 95 Administrative Staff 65 Acoustical/Audio-Visual Consultant 4b Technology Group Principal $195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Security Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Senior Designer $ 100.00 BIM/CADD Technician $ 85.00 Administrative Staff $ 60.00 44.00 Clerical $44.00 EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Project Number: Brief Project Description: Additional Project Information: Construction Delivery Method: Project Schedule/Phases/Milestones: Include BIM milestones, pre-design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring Design Reviews Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Interference Check Detect problems in the model where two building components are clashing including soft and hard Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model Structural Model Mechanical Model Plumbing Model Fire Sprinkler Model Electrical Model Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). Measurement and Coordinate System Describe the measurement system and coordinate system used. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTS

Appears in 1 contract

Samples: assets.system.tamus.edu

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, the following number of sets of review documents at the required review stages: Schematic Design: 5 (1/2 size) sets with narratives Design Development: 5 (1/2 size) 1 ½ sets for 25% and 100% with specifications Construction Documents: 5 (1/2 size) 1 ½ sets for 25%, 50% & 75% 100% with specifications complete Construction Documents: 5 (1/2 size) sets 1 set for 100% complete with specifications The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. FirmFU irm/Position Classification Hourly Architecture: Page Xxxxxxxxxxx Page Leadership UHourly Billing Rate Architecture EYP Inc. Senior Principal $ 195-310 Associate $260.00 Principal 145-220 $225.00 Project Director $205.00 Project Manager 145-220 III $200.00 Project Manager II $170.00 Project Manager I $145.00 Architecture Architectural Lead $165.00 Architectural Designer III $160.00 Architectural Designer II $125.00 Architectural Designer I $110.00 Architect III $160.00 Architect II $130.00 Architect I 195-310 Project Architect $110.00 Designer II 145-222 Project $100.00 Designer 195-310 Project I $ 85.00 BIM Manager $125.00 BIM Specialist $ 85.00 Interiors Interior Lead $180.00 Interior Designer 195-310 III $125.00 Interior Designer II $ 95.00 Interior Designer I $ 85.00 Planning Planning Lead $205.00 Senior Lab Urban Planner 250 Lab $140.00 Urban Planner 145-220 Construction Administrator 145-220 Intern Architect 75-130 BIM/CADD Technician 75-130 $105.00 Administrative Staff 55-110 Co Architecture O’Xxxxxxx Xxxxxxxxx Principal $ 200 Associate Principal 85.00 Civil Engineer: Xxxxxxx Clerical $ 60.00 CMT Project Manager 160 Project Architect $ 90.00 Construction Inspector $ 85.00 Designer $ 80.00 Draftsman $ 60.00 Drilling Manager $ 60.00 Graduate Engineer I 155 Project Architect $ 80.00 Graduate Engineer II Project Designer 105 Construction Administrator 130 Intern Architect 90 BIM/CADD Technician 90 Administrative Staff 70 MEP Engineering O’Xxxxxxx Xxxxxxxxx $105.00 Principal $ 220 $200.00 Professional Engineer $135.00 Registered Professional Land Surveyor $135.00 Senior CMT Project Manager 160 $135.00 Senior Engineer 175 Engineer 165 Engineering Designer 115 Construction Administrator 130 BIM$160.00 Senior Survey Technician $ 95.00 Survey Field Crew $135.00 Survey Field Crew – Two Man $ 67.50 Survey Technician $ 80.00 Technician $ 48.00 Technician (Weekend/CADD Holiday) $ 72.00 Senior Technician 90 Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC $ 60.00 Senior Technician (Weeknd/Holiday) $ 90.00 Landscape Architect: Xxxxxxx & Associates Partner Landscape Architect $160.00 Principal $ 205 Landscape Architect $130.00 Project Manager 176 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Landscape Architect $115.00 Landscape Designer 115 Engineer III $105.00 Landscape Designer 93 Construction Administrator 105 BIMII $ 95.00 Landscape Designer I $ 85.00 CADD Draftsman $ 75.00 Graphics/CADD Technician 93 Administrative Staff 66 $ 75.00 Structural Engineering Datum XxxxEngineer: Ensight Xxxxxx Xxxxxx, LLC Senior Principal $275.00 Principal $195.00 Senior Engineer $165.00 Engineer $135.00 Staff Engineer $110.00 Senior CAD Drafter $120.00 Project Drafting Coordinator $110.00 CAD Drafter $100.00 Construction Administrator $110.00 Clerical $ 255.00 85.00 MEP Engineer: Affiliated Engineers, Inc. Project Principal $ 185.00 Senior $255.30 Project Manager $184.02 Field Services $170.70 Senior Mechanical Engineer $174.06 Mechanical Engineer $101.52 Mechanical Designer $141.36 Senior Electrical Engineer $219.81 Electrical Engineer $100.98 Electrical Designer $ 160.00 Project Manager $ 145.00 Project Engineer $ 115.00 Graduate Engineer $ 100.00 85.68 Senior Production Manager $ 150.00 Senior Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 Civil Engineering Xxxxxxx Engineering & Surveying Co., Inc. Principal $ 200 Associate Principal 175 Senior Project Manager 175 Project Manager 150 Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering Piping Designer 100 Construction Administrator 120 $142.29 Piping Designer $110.34 BIM/CADD Technician 90 Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co.CAD Tech $ 93.21 Cost Estimator $177.21 IT, Inc. Principal – Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75A/day Research 50 Administrative Staff 60 Landscape Architecture Xxxxxxx & Associates Principal $ 160 Landscape Architect 125 Administrative Staff 50 Data/Telecommunications Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Acoustical/Audio-Visual Consultant 4b Technology V and Security Consultant: DataCom Design Group Principal $195 Project Manager 185 190.00 Senior Technology Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Security Consultant 4b $145.00 Contract Administration $ 98.00 Technology Group Principal Support $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy 65.00 Clerical / Accounting $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Senior Designer $ 100.00 BIM/CADD Technician $ 85.00 Administrative Staff $ 60.00 56.00 Additional Site Visits Beyond Article 1.6.6 $750.00 per trip EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Project Number: Brief Project Description: Additional Project Information: Construction Delivery Method: Project Schedule/Phases/Milestones: Include BIM milestones, pre-design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring Design Reviews Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Interference Check Detect problems in the model where two building components are clashing including soft and hard Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model Structural Model Mechanical Model Plumbing Model Fire Sprinkler Model Electrical Model Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). Measurement and Coordinate System Describe the measurement system and coordinate system used. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTS

Appears in 1 contract

Samples: assets.system.tamus.edu

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, the following number of sets of review documents at the required review stages: Schematic Design: 5 (1/2 size) 4 sets with narratives Design Development: 5 (1/2 size) 4 sets for 25% and 100% with specifications Construction Documents: 5 (1/2 size) 4 sets for 25%, 50% & 75% 100% with specifications complete Construction Documents: 5 (1/2 size) 4 sets for 100% complete with specifications The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. FirmFU irm/Position Classification Hourly Architecture: Lord Aeck Sargent UHourly Billing Rate Architecture EYP Inc. Principal $ 195-310 Associate Principal 145-220 Project Manager 145-220 Project Architect I 195-310 Project Architect II 145-222 Project Designer 195-310 Project Designer 195-310 Senior Lab Planner 250 Lab Planner 145-220 Construction Administrator 145-220 Intern Architect 75-130 BIM/CADD Technician 75-130 Administrative Staff 55-110 Co Architecture O’Xxxxxxx Xxxxxxxxx Principal $ 200 Associate Principal Project Manager 160 Project Architect I 155 Project Architect II Project Designer 105 Construction Administrator 130 Intern Architect 90 BIM/CADD Technician 90 Administrative Staff 70 MEP Engineering O’Xxxxxxx Xxxxxxxxx Principal $ 220 Project Manager 160 Senior Engineer 175 Engineer 165 Engineering Designer 115 Construction Administrator 130 BIM/CADD Technician 90 Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC Principal $ 205 Project Manager 176 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Administrator 105 BIM/CADD Technician 93 Administrative Staff 66 Structural Engineering Datum Xxxx, LLC Senior Principal $ 255.00 $285.00 Principal $ 185.00 $235.00 Senior Project Manager $ 160.00 / Discipline Specialist $175.00 Senior Project Architect / Senior Interior Designer $150.00 Project Manager / Discipline Specialist $145.00 Project Architect / Interior Designer $120.00 Design Staff $100.00 Administrative Staff $ 90.00 Food Service Consultant: Bakergroup Senior Principal $285.00 Consulting Principal $270.00 Operations Consultant / Associate $243.00 Production Principal $233.00 Project Manager $192.00 Design / Technical Associate $175.00 Interior Designer $135.00 Administrative Assistant $ 83.00 MEP Engineering: TG&W Principal Engineer $248.00 Senior Engineer $218.00 Staff Engineer $194.00 Engineer $179.00 Senior Designer $173.00 Staff Designer $158.00 Engineer-in-training $135.00 Designer $129.00 Designer / drafter $113.00 Technical Assistant $107.00 Drafter $105.00 Administrator $ 98.00 Clerical $ 71.00 Structural Engineering: JQ Infrastructure Partner $260.00 Principal $225.00 Senior Project Manager $185.00 Engineering Technical Lead $195.00 Project Manager $160.00 Senior Project Engineer $145.00 Project Engineer $130.00 Senior Technician $125.00 Technician $ 115.00 95.00 Administrative $ 80.00 Civil Engineering: Xxxxxxx Engineering Clerical $ 60.00 Designer $ 90.00 Draftsman $ 85.00 Graduate Engineer I $ 100.00 80.00 Graduate Engineer II $105.00 Principal $200.00 Senior Production Manager Engineer $160.00 Technician $ 150.00 48.00 Senior Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 60.00 Landscape Architecture: Asakura Xxxxxxxx Senior Support Personnel $ 125.00 Support Personnel $ 68.00 Civil Engineering Xxxxxxx Engineering & Surveying Co., Inc. Principal $ 200 $225.00 Associate Principal 175 Administrative Staff $160.00 Cost Consultant: Vermeulens Principal $280.00 Associate Principal $250.00 Associate / Director $220.00 Senior Project Manager 175 $190.00 Project Manager 150 / Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering Designer 100 Construction Administrator 120 BIM/CADD Technician 90 Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Principal – Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75/day Research 50 Administrative Staff 60 Landscape Architecture Xxxxxxx & Associates Principal $ 160 Landscape Architect 125 Administrative Staff 50 Estimator / IT $160.00 Estimator / Support $130.00 Data/Telecommunications Consultant Consultant: 4b Technology Group Principal $ 195 Principal-in-Charge $225.00 Project Manager 185 $185.00 Senior Consultant 165 $165.00 Consultant 145 BIM/CADD Technician 95 $145.00 Revit / CAD Professional $110.00 Administrative Staff 65 Acoustical/Audio-Visual Consultant 4b Technology Group Principal $195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Security Consultant 4b Technology Group Principal Assistant $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Senior Designer $ 100.00 BIM/CADD Technician $ 85.00 Administrative Staff $ 60.00 65.00 EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Project Number: Brief Project Description: Additional Project Information: Construction Delivery Method: Project Schedule/Phases/Milestones: Include BIM milestones, pre-design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring Design Reviews Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Interference Check Detect problems in the model where two building components are clashing including soft and hard Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model Structural Model Mechanical Model Plumbing Model Fire Sprinkler Model Electrical Model Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). Measurement and Coordinate System Describe the measurement system and coordinate system used. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTS

Appears in 1 contract

Samples: assets.system.tamus.edu

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, the following number of sets of review documents at the required review stages: Schematic Design: 5 (1/2 size) sets with narratives 2 set Design Development: 5 (1/2 size) sets for 25% and 100% with specifications 2 set Construction Documents: 5 (1/2 size) sets 1 set for 25%, 50% & 75% 100% with specifications complete Construction Documents: 5 (1/2 size) sets 1 set for 100% complete with specifications A/E -XXXX BIM Contract No. 5909 02/16 Project No.02-3184 The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings listing and/or position classifications may be added as needed or required by the project. Firm/Position Classification Hourly Billing Rate Architecture EYP PBK Sports Partner $250.00/hr Principal $225.00/hr Associate Principal $200.00/hr Project Manager / Associate $175.00/hr Architect $150.00/hr Intern $100.00/hr Field $90.00/hr Office $70.00/hr Life Safety Consultant FP&C Consultants KC, LLC Project Manager $175.00/hr Code Consultant $175.00/hr Engineer $175.00/hr Associate $155.00/hr Technician $110.00/hr CAD Designers $75.00/hr MEP Engineering Infrastructure Associates, Inc. Principal $ 195-310 Associate Principal 145-220 $167.00/hr Project Manager 145-220 Project Architect I 195-310 Project Architect II 145-222 Project Designer 195-310 Project Designer 195-310 Senior Lab Planner 250 Lab Planner 145-220 Construction Administrator 145-220 Intern Architect 75-130 BIM$140.00/CADD Technician 75-130 Administrative Staff 55-110 Co Architecture O’Xxxxxxx Xxxxxxxxx Principal $ 200 Associate Principal Project Manager 160 Project Architect I 155 Project Architect II Project Designer 105 Construction Administrator 130 Intern Architect 90 BIM/CADD Technician 90 Administrative Staff 70 MEP Engineering O’Xxxxxxx Xxxxxxxxx Principal $ 220 Project Manager 160 hr Senior Engineer 175 $125.00/hr Engineer 165 Engineering $115.00/hr Junior Engineer $100.00/hr CADD Tech / Designer 115 Construction Administrator 130 BIM$95.00/CADD Technician 90 Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC Principal $ 205 Project Manager 176 Senior hr Spec Writer $95.00/hr Clerical $75.00/hr Structural Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Administrator 105 BIM/CADD Technician 93 Administrative Staff 66 Structural Engineering Datum XxxxXxxxxxxx Xxxxx Engineers, LLC Senior Principal $ 255.00 Principal $ 185.00 $250.00/hr Senior Project Manager $ 160.00 $180.00/hr Senior Quality Control Engineer $170.00/hr Project Manager $ 145.00 Project $160.00/hr Design Manager $160.00/hr Senior Engineer $ 115.00 $140.00/hr Engineer $120.00/hr Graduate Engineer $ 100.00 $110.00/hr Engineering Intern $70.00/hr CAD Designer $170.00/hr Senior Production Manager $ 150.00 CAD Technician $110.00/hr CAD Technician $90.00/hr Project Accountant $110.00/hr Senior Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 Administrative Assistant $100.00/hr Administrative Assistant $70.00/hr Civil Engineering Xxxxxxx Engineering & Surveying Co.PBK Sports Civil Principal $225.00/hr Civil Director $200.00/hr Civil Engineer $175.00/hr Civil Designer $150.00/hr Civil Draftsman $100.00/hr Landscape Architecture SMR Landscape Architects, Inc. Principal $ 200 Design / Administration $220.00/hr Associate Principal 175 Senior Project Manager 175 Project Manager 150 Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering / RLA $200.00/hr Landscape Designer 100 Construction Administrator 120 BIM$175.00/CADD Technician 90 Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Principal – Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75hr Irrigation Designer $175.00/day Research 50 Administrative Staff 60 Landscape Architecture Xxxxxxx & Associates Principal $ 160 Landscape Architect 125 Administrative Staff 50 hr Data/Telecommunications Consultant 4b Technology Group Xxxxxx Xxxxxxxxxx Engineers Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/ Designer $150.00/CADD hr CAD Technician 95 Administrative Staff 65 $90.00/hr Clerical $55.00/hr Accounting $95.00/hr Acoustical/Audio-Visual Audio‐Visual Consultant 4b Technology Group Technical Design Group, Inc. Principal / Designer $195 Project Manager 185 Senior 150.00/hr CAD Technician $90.00/hr Clerical $55.00/hr Accounting $95.00/hr Food Service Consultant 165 Consultant 145 BIMWC & Partners, Inc. Executive Principals $300.00/CADD Technician 95 Administrative Staff 65 hr Principals $225.00/xx Xx. Associates $150.00/hr Associates $135.00/xx Xx. Consultants $125.00/hr Consultants $100.00/hr Technicians $90.00/hr Administration $75.00/hr Security Consultant 4b Technology Group Xxxxxx Xxxxxxxxx Engineers Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/ Designer $150.00/CADD hr CAD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety$90.00/Code Specialist $ 125.00 Senior Designer $ 100.00 BIMhr Clerical $55.00/CADD Technician $ 85.00 Administrative Staff $ 60.00 EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Project Number: Brief Project Description: Additional Project Information: Construction Delivery Method: Project Schedule/Phases/Milestones: Include BIM milestones, pre-design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring Design Reviews Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Interference Check Detect problems in the model where two building components are clashing including soft and hard Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model Structural Model Mechanical Model Plumbing Model Fire Sprinkler Model Electrical Model Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). Measurement and Coordinate System Describe the measurement system and coordinate system used. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTShr

Appears in 1 contract

Samples: assets.system.tamus.edu

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, Refer to Exhibit C: Document Distribution Matrix for the following required number of sets of documents required for each review documents at the required review stages: Schematic Design: 5 (1/2 size) sets with narratives Design Development: 5 (1/2 size) sets for 25% and 100% with specifications Construction Documents: 5 (1/2 size) sets for 25%, 50% & 75% 100% with specifications Construction Documents: 5 (1/2 size) sets for 100% complete with specifications stage. The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan Ex C Document Distribution Matrix EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. FirmUFirm/Position Classification Hourly UHourly Billing Rate Architecture EYP Inc. – Huckabee Principal $ 195-310 / Executive $250.00 Project Architect / Associate Principal 145$200.00 BIM Specialist $150.00 Project Leader $80.00 Project Engineer $200.00 Quality Control $100.00 Structural Leader $100.00 Engineer-220 in-Training $80.00 Intern / Draftsman $60.00 Administrative Staff $45.00 Urban Planner $150.00 Public Relations Consultant $150.00 Construction Observer $100.00 Design Architecture – Xxxxx Sports Principal $300.00 Senior Designer $200.00 Project Manager 145-220 $160.00 Project Architect I 195-310 $130.00 Architect $110.00 Intern Architect $90.00 Interior Designer $100.00 MEP Engineering – Xxxxx DBR Partner $240.00 Project Architect II 145-222 Project Manager $185.00 Senior Engineer $185.00 Senior Technology Designer 195-310 Project $155.00 Engineer / Senior Designer 195-310 $140.00 Senior Lab Planner 250 Lab Planner 145-220 Construction Administrator 145-220 Intern Architect 75-130 BIM/$140.00 Technology Designer $130.00 Commissioning Agent $130.00 Quality Assurance / Quality Control $130.00 Construction Administrator $110.00 Sustainability Advisor $110.00 Designer (M, E, P) $110.00 CADD Technician 75-130 Operator $65.00 Administrative Staff 55-110 Co Architecture O’Xxxxxxx Xxxxxxxxx Principal $ 200 Associate Principal Project Manager 160 Project Architect I 155 Project Architect II Project Designer 105 Construction Administrator 130 Intern Architect 90 BIM/CADD Technician 90 Administrative Staff 70 MEP Engineering O’Xxxxxxx Xxxxxxxxx Principal $ 220 Project Manager 160 Senior Engineer 175 Engineer 165 Engineering Designer 115 Construction Administrator 130 BIM/CADD Technician 90 Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC Principal $ 205 Project Manager 176 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Administrator 105 BIM/CADD Technician 93 Administrative Staff 66 $60.00 Structural Engineering Datum Xxxx, LLC Senior – JQ + Tsen Partner $240.00 Principal $ 255.00 Principal $ 185.00 $210.00 Senior Project Manager $ 160.00 $175.00 Engineering Technical Lead $190.00 Project Manager $ 145.00 $155.00 Senior Project Engineer $ 115.00 Graduate $135.00 Project Engineer $ 100.00 Senior Production Manager $ 150.00 $120.00 Senior Technician $ 120.00 $110.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 $90.00 Administrative Staff $75.00 Civil Engineering Xxxxxxx Engineering & Surveying Co., Inc. Xxxx Principal $ 200 $225.00 Associate Principal 175 $200.00 Director $200.00 Senior Project Manager 175 $150.00 Senior Project Coordinator $150.00 Project Manager 150 $120.00 Project Coordinator $120.00 Project Engineer $95.00 Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering Technician $110.00 Technician $80.00 Drafter $75.00 Research Manager $80.00 Technical Assistant $50.00 Executive Assistant $85.00 Senior Administrative Assistant $80.00 Administrative Assistant $70.00 Expert Witness Testimony $350.00 Landscape Architecture – Xxxxxxx Xxxx Principal $225.00 Associate Principal $200.00 Director $200.00 Senior Project Manager $150.00 Project Manager $120.00 Project Landscape Architect $95.00 Landscape Designer 100 Construction Administrator 120 BIM/CADD Technician 90 $75.00 Drafter $75.00 Executive Assistant $85.00 Senior Administrative Assistant $80.00 Administrative Assistant $70.00 Expert Witness Testimony $350.00 Cost Consultant – Vermeleuns Principal $275.00 Associate Principal $245.00 Associate $215.00 Senior Project Manager $185.00 Senior Estimator $185.00 Estimator $125.00 Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Principal – Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75/day Research 50 Administrative Staff 60 Landscape Architecture Xxxxxxx & Associates Principal $ 160 Landscape Architect 125 Administrative Staff 50 $125.00 Data/Telecommunications Consultant 4b – Crux Technology Group + Security Design Project Principal $ 195 $150.00 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 $150.00 Quality Assurance $130.00 Design Support Services $130.00 Production / Drawing Support $90.00 Acoustical/Audio-Visual Consultant 4b Technology Group – BAi Principal $195 200.00 Technical Systems Specialist $150.00 Food Service Consultant – Xxxxx Design Solutions Project Administrator $175.00 Project Designer $155.00 Production Staff $125.00 Security Consultant – Crux Technology + Security Design Project Principal $150.00 Project Manager 185 $150.00 Quality Assurance $130.00 Design Support Services $130.00 Production / Drawing Support $90.00 Fire & Life Safety Consultant – Xxxxxx Xxxxxx Director / Operation Manager $230.00 Senior Fire Protection Engineer $215.00 Senior Consultant 165 $165.00 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Security $150.00 Fire Protection Engineer $150.00 Associate $135.00 Roofing Consultant 4b Technology Group – Rooftech Expert Witness $250.00 Principal $ 195 Engineer $150.00 Principal Architect $150.00 Senior Construction Consultant $150.00 Project Manager 185 Senior $150.00 Certified Infrared Themographer $150.00 Registered Roof Consultant 165 Consultant 145 BIM/$150.00 Laboratory Technician $125.00 CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager Designer I $115.00 CADD Designer II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Senior Designer $ $95.00 Contract Administrator $100.00 BIM/CADD Technician $ 85.00 Administrative Staff $ Registered Roof Observer $75.00 Full-Time Registered Roof Observer $75.00 Clerical / Report Processor $60.00 EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- cost‐ effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Memorial Stadium Renovation and Expansion Project Number: 04-3176 Brief Project Description: Additional Project Information: Construction Delivery Method: Competitive Sealed Proposal (CSP) Project Schedule/Phases/Milestones: See Attached Include BIM milestones, pre-design pre‐design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Existing Documentation May 12, 2016 May 25, 2016 Huckabee Planning / Programming May 12,2016 May 24,2016 Huckabee/Xxxxx/Owner Schematic Design May 25, 2016 July 29, 2016 Design Team Design Development July 29, 2016 October 14, 2016 Design Team SD/DD Coordination September 28, 2016 October 6, 2016 Design Team/Owner Construction Documents October 17, 2016 January 16, 2017 Design team Facility Data Review XXX XXX TBD Construction May 26,2017 July 2018 GC/Design Team/Owner KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone Xxxxxxxx Xxxxxxxx Xxxxx Sports Xxxxx DBR JQ+Xxxx Xxxxxxx Xxxx (Civil) Xxxxxxx Xxxx (Landscape) Crux (data) Crux (security) XXX Xxxxx Xxxxxx Xxxxxx Xxxxxxxxx Xxxx Xxxxxx Xxxx Xxxxxx Xxxxxxx Xxxxxxxx Xxxxx Xxxxx Xxxx Xxxxxx Xxxxxx Xxxxxxxx Xxxxxx Xxxxxxxx Xxxx Xxxxxxxxxx Xxxx Xxxxxxxxxx Xxxxxxx Xxxxx Xxxxx Xxxxx Chi Do Xxxxx Xxxxxxx Project Leader BIM Spec. Designer MEP Civil Landscape Tech Security Acoustical Food Service Fire/Life Safe Cost Est. Houston Houston Atlanta Houston Dallas Dallas Dallas Ft Worth Ft Worth Xxxxxx Xxxxxx Xxxxxx S Xxxxxxx xxxxxxx@xxxxxxxx‐xxx.xxx xxxxxxx@huckabee‐xxx.xxx XXxxxxxx@xxxxx.xxx XXxxxx@xxxxxx.xxx xxxxxxx@xxxxx.xxx xxxxxxxxx@xxxx.xxx xxxxxxxxx@xxxx.xxx xxxxxxxxxxx@xxxxxxxxxxxxx.xxx xxxxxxxxxxx@xxxxxxxxxxxxx.xxx xxxxxx@xxxxxxxxx.xxx xxxxx@xxxxxxxxxxx.xxx xxx@xxxxxxxxxxxx.xxx xxxxxxxx@xxxxxxxxxx.xxx BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions – Huckabee-BIM Specialist-Xxxx Xxxxxx Upon delivery of existing documentation to Huckabee, the BIM specialist will construct a Revit model of the existing conditions, to the extent required for the completion of the project. Conditions will be field verified and the finished existing model will be delivered to Xxxxx for use as a design background. Design Authoring Authoring-Xxxxx-TBD Design Reviews Concept in Sketchup can begin based on approximations of existing conditions. From multiple design concepts, one will be chosen to carry into Schematic Design. Schematic Design will be based on actual existing conditions. The Schematic Design may combine the use of Revit and Sketchup to adequately convey the design intent while assuring accuracy and constructability Design Reviews-Owner-TBD The owner and Xxxxx will review the SD for design intent while Xxxxxxxx will review the SD with Xxxxx for adequacy of information to proceed into Design Development. The SD will be accurately scaled with appropriate consideration for Structural and Mechanical design before moving into Design Development. Space Tracking Tracking-Xxxxx-TBD/Huckabee-Project Leader-Xxxx Xxxxxx At the end of SD, upon transition to DD, and at the completion of DD, the model will be reviewed to assure continuing adherence to the space program for the project. Energy Analysis Analysis-Xxxxx DBR Daylighting Analysis Analysis-Xxxxx DBR Cost Estimation Estimation-Vermeulens 3D Coordination (design and construction) construction)-Owner/Xxxxx/Huckabee Upon transition to DD, at the completion of DD, at 50% CD, and at any point a structural or mechanical issue impacts the design, the model will be reviewed to assure continuing adherence to the design intent. Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time One‐Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type Arch Existing documentation Huckabee Upon completion Revit V16 .rvt Arch‐ Design/Conceptual Xxxxx Every two weeks Sketchup Arch‐ Design/Schematic Xxxxx Every two weeks Sketchup Arch‐Design Development Huckabee Every week Revit BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Huckabee & Xxxxx Revit v2016 Daily Interference Check Detect problems in the model where two building components are clashing including soft and hard Huckabee Navisworks Bi‐weekly Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Huckabee Revit v2016; Bluebeam Weekly Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant non‐compliant elements and corrective action plans Huckabee Revit v2016 Weekly Other MODEL STRUCTURE File Naming Structure File Name Formatting <ProjectNumber>_<District>_<ProjectName>_<Discipline>_v16 Architectural Model 1754-01-01_TSU_MemorialStadiumReno_ARCH_v16 Structural Model 1754-01-01_TSU_MemorialStadiumReno_STRUC_v16 Mechanical Model 1754-01-01_TSU_MemorialStadiumReno_MECH_v16 Plumbing Model 1754-01-01_TSU_MemorialStadiumReno_PLUMB_v16 Fire Sprinkler Model 1754-01-01_TSU_MemorialStadiumReno_FIRE_v16 Electrical Model 1754-01-01_TSU_MemorialStadiumReno_ELEC_v16 Model Structure Describe and diagram how The single Architectural model will contain all architectural information, including interiors information as a part of the model is separated (buildingmodel. All other disciplines will be linked as separate models. The civil will be linked as a flattened CAD file, floorunless extreme site terrain warrants the development of a topographical surface. In that instance, zone, area and/or discipline)the topography would be included in the architectural model. Measurement and Coordinate System Describe the measurement system BIM Project Location by Project Address through Internet Mapping Service. Shared Coordinates to be defined in architectural model and coordinate system usedacquired by all consultant models. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] /‐ 1/8” OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] /‐ 1/8” OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- /‐ [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTSBIM models and CAD files coordination as required (max. weekly) .rvt v2016; .dwg v2016 ATTACHMENTS List any supporting information and attach. TAMUS/FPC Review Document Distribution Matrix

Appears in 1 contract

Samples: assets.system.tamus.edu

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, the following number of sets of review documents at the required review stages: Schematic Design: 5 (1/2 size) 15 sets with narratives Design Development: 5 (1/2 size) 15 sets Construction Documents: 15 sets for 2550% and 100% with specifications Construction Documents: 5 (1/2 size) sets for 25%, 50% & 75% 100% with specifications Construction Documents: 5 (1/2 size) sets for 100% complete with specifications The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. FirmUFirm/Position Classification Hourly Architecture and Design – [Stantec Architecture, Inc.] UHourly Billing Rate Architecture EYP Inc. Principal $ 195-310 Associate Principal 145-220 $210 Senior Designer $210 Senior Project Manager 145-220 $156 Senior Planner $151 Senior Project Architect I 195-310 $151 Designer $137 Project Architect II 145-222 $137 Planner $137 Senior Drafter $137 Drafter $129 Designer $121 Interior Designer $115 Administrative Staff $ 108 MEP Engineering – [Xxxx Xxxxx and Associates] Principal $263 Project Designer 195-310 Project Designer 195-310 Senior Lab Planner 250 Lab Planner 145-220 Manager $186 Engineer $161 Construction Administrator 145-220 Intern Architect 75-130 $161 BIM/CADD Technician 75-130 $118 Administrative Staff 55-110 Co Architecture O’Xxxxxxx Xxxxxxxxx $85 Structural Engineering – [JQ Infrastructure, LLC] Partner $260 Principal $225 Engineering Technical Lead $195 Senior Project Manager $185 Project Manager $160 Senior Project Engineer $145 Project Engineer $130 Senior Technician $115 Technician $ 200 95 Administrative Staff $ 80 Civil Engineering – [Xxxxxxx Xxxx] Principal $225 Associate Principal $200 Director $200 Senior Project Manager $160 Senior Project Coordinator $160 Project Manager/Project Coordinator $120 Project Engineer $ 95 Senior Technician $110 Technician $ 80 Drafter $ 75 Research Manager $ 80 Technical Assistant $ 50 Executive Assistant $ 85 Senior Administrative Assistant $ 80 Administrative Assistant $ 70 Expert Witness Testimony $350 Landscape Architecture – [Xxxxxxx Xxxx] Principal $225 Associate Principal $200 Director $200 Senior Project Manager $150 Project Manager $120 Project Landscape Architect I $ 95 Landscape Designer $ 75 Drafter $ 75 Executive Assistant $ 85 Senior Administrative Assistant $ 80 Administrative Assistant $ 70 Expert Witness Testimony $350 Cost Consultant – [Vermeulans Cost Consultants] Principal $275 Associate Principal $245 Associate $215 Senior Project Manager $185 Project Manager/Senior Estimator/IT $155 Estimator $125 Administrative Staff $125 Data/Telecommunications Consultant – [DataCom Design Group] Principal $190 Associate Principal $180 Senior Project Architect II Project Designer 105 Construction Manager $170 Senior Technology Consultant $145 Technology Consultant $124 Contract Administrator 130 Intern Architect 90 $ 98 BIM/CADD Technician 90 $ 65 Administrative Staff 70 MEP Engineering O’Xxxxxxx Xxxxxxxxx Principal $ 220 Project Manager 160 Senior Engineer 175 Engineer 165 Engineering Designer 115 Construction Administrator 130 BIM/CADD Technician 90 Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC Principal $ 205 Project Manager 176 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Administrator 105 BIM/CADD Technician 93 Administrative Staff 66 Structural Engineering Datum Xxxx, LLC Senior Principal $ 255.00 Principal $ 185.00 Senior Project Manager $ 160.00 Project Manager $ 145.00 Project Engineer $ 115.00 Graduate Engineer $ 100.00 Senior Production Manager $ 150.00 Senior Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 Civil Engineering Xxxxxxx Engineering & Surveying Co., Inc. Principal $ 200 Associate Principal 175 Senior Project Manager 175 Project Manager 150 Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering Designer 100 Construction Administrator 120 BIM/CADD Technician 90 Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Principal – Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75/day Research 50 Administrative Staff 60 Landscape Architecture Xxxxxxx & Associates Principal $ 160 Landscape Architect 125 Administrative Staff 50 Data/Telecommunications Consultant 4b Technology Group Principal $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 56 Acoustical/Audio-Visual Consultant 4b Technology Group – [DataCom Design Group] Principal $195 Project Manager 185 190 Associate Principal $180 Senior Technology Consultant 165 $145 Technology Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Security Consultant 4b Technology Group Principal $124 Contract Administrator $ 195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Senior Designer $ 100.00 98 BIM/CADD Technician $ 85.00 65 Administrative Staff $ 60.00 56 Security Consultant – [DataCom Design Group] Principal $190 Associate Principal $180 Senior Technology Consultant $145 Technology Consultant $124 Contract Administrator $ 98 BIM/CADD Technician $ 65 Administrative Staff $ 56 EXHIBIT B “H” BIM Execution Plan DEVELOPED BY (Name and Company) Xxxx Xxxxxxx, AIA , Stantec Xxxxxx Xxxx, Applied Technology Manager, Linbeck PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- cost‐ effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Farm Repair and Modernization Project Number: 04-3259 Brief Project Description: One story building housing instructional agricultural laboratories, classrooms and associated support and office spaces, (1) open-sided barn for covered Animal Area, and Modular greenhouses. Additional Project Information: None Construction Delivery Method: Construction Manager-at-Risk Project Schedule/Phases/Milestones: Include BIM milestones, pre-design pre‐design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design 4/16/2018 5/15/2018 A/E, Owner, XXXX Design Development 5/23/2018 06/26/2018 A/E, Owner, XXXX Construction Documents 7/05/2018 Phased Delivery A/E, Owner, XXXX Construction 8/22/2018 05/31/2019 A/E Owner, XXXX Phased Delivery Bid Package #1: completion of construction documents 7/17/2018 Bid Package #2: completion of construction documents 11/08/2018 KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone Stantec JQ Engineers Xxxx Xxxxx DataCom Xxxx Xxxxxxx Xxxxx Xxxxxx Xxxx Xxxxxxxx Xxxx Xxxxx Xxxxx Xxxxxxx Architecture/PA Structural Princ. MEP/Elec Eng. Technology Houston, TX Ft Worth, TX Houston, TX Dallas,TX Xxxx.xxxxxxx@xxxxxxx.xxx xxxxxxx@xxxxx.xxx xxxxxxxxx@xxxxx.xxx xxxxxx@xxxxxxxxx.xxx koeschsli@datacomdesign. com 713.548.5810 817.505.4300 713.780.7563 BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring Design Reviews Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type Arch/lab Yes Xxxxxxx Weekly Friday *See REVIT .RVT 18 .RVT,.DWG MEP Yes Xxxxx Weekly Friday below REVIT .RVT 18 .RVT,.DWG Tech Yes Oechslli Weekly Friday REVIT RVT 18 .RVT,.DWG Struct Yes Xxxxxx/Xxxxxxxx Weekly Friday REVIT RVT 18 .RVT,.DWG Civil No Xxxx Xxxxxx Weekly Friday Autocad .DWG 14 .DWG Landscape No Weekly Friday Autocad .DWG 14 .DWG Construction Yes Xxxxxx/Xxxxxx Weekly TBD Autocad .DWG 17 .DWG MEPF Coord. BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed All Trade BIM leads REVIT Daily Interference Check Detect problems in the model where two building components are clashing including soft and hard All Trade BIM leads Xxxxxx/Xxxxxx REVIT/Navisworks Bi-Weekly starting at CD’s Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Xxxxxxx REVIT Prior to completion of each documentation phase Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant elements and corrective action plans All Trade BIM leads XXXX: Xxxxxx/Xxxxxx REVIT Bi-Weekly model audit Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model Structural Model Mechanical Model Plumbing Model Fire Sprinkler Model Electrical Model Model Structure Describe and diagram how Formatting: Each firm will utilize their in-house naming standards. File name shall remain consistent throughout the model is separated (building, floor, zone, area and/or discipline). Measurement and Coordinate System Describe the measurement system and coordinate system used. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTSproject.

Appears in 1 contract

Samples: assets.system.tamus.edu

Review Documents. The Architect/Engineer shall, at its expense, furnish and deliver to the Owner for Owner’s review, Refer to Exhibit C: Document Distribution Matrix for the following required number of sets of documents required for each review documents at the required review stages: Schematic Design: 5 (1/2 size) sets with narratives Design Development: 5 (1/2 size) sets for 25% and 100% with specifications Construction Documents: 5 (1/2 size) sets for 25%, 50% & 75% 100% with specifications Construction Documents: 5 (1/2 size) sets for 100% complete with specifications stage. The following Exhibits are fully incorporated into this Agreement by reference: EXHIBITS Ex A Personnel Titles and Hourly Rates Ex B BIM Execution Plan Ex C Document Distribution Matrix EXHIBIT A PERSONNEL TITLES AND HOURLY RATES The prime architectural or engineering firm for this project will assemble the following information from consulting team members associated with the project. The categories of personnel indicated should be edited to include only those expected to be actually working on this project. When preparing this schedule, you are expected to adhere to the position classifications and titles presented to the greatest extent possible. Additional consultant listings and/or position classifications may be added as needed or required by the project. Firm/UFirm/ Position Classification Hourly UHourly Billing Rate Architecture EYP Inc. - Xxxxxx Principal $ 195-310 300 Associate Principal 145-220 $ 250 Project Manager 145-220 $ 230 Project Architect I 195-310 $ 175 Project Architect II 145-222 $ 185 Project Designer 195-310 Project Designer 195-310 Senior Lab Planner 250 Lab Planner 145-220 $ 130 Construction Administrator 145-220 $ 185 Intern Architect 75-130 $ 105 BIM/CADD Technician 75-130 $ 95 Administrative Staff 55-110 Co $ 75 Design Architecture O’Xxxxxxx Xxxxxxxxx Xxxxxx Principal $ 200 300 Associate Principal $ 250 Project Manager 160 $ 230 Project Architect I 155 $ 175 Project Architect II $ 185 Project Designer 105 $ 130 Construction Administrator 130 $ 185 Intern Architect $ 105 BIM/CADD Technician $ 95 Administrative Staff $ 75 MEP Engineering – Xxxxx XxXxxxx Principal $ 190 Associate Principal $ 150 Senior Project Manager $ 150 Project Manager $ 150 Senior Engineer $ 150 Engineer $ 150 Graduate Engineer $ 125 Engineering Designer $ 125 Construction Administrator $ 125 BIM/CADD Technician $ 85 Administrative Staff $ 75 Structural Engineering – JQ Engineering Principal $ 240 Associate Principal $ 210 Senior Project Manager $ 175 Project Manager $ 155 Senior Engineer $ 190 Engineer $ 120 Graduate Engineer $ 120 Engineering Designer $ 110 Construction Administrator $ 135 BIM/CADD Technician $ 90 Administrative Staff $ 75 Civil Engineering – MTG Strategic Partners Principal $ 180 Survey Crew $ 120 Senior Engineer $ 137 GIS Technician $ 90 Graduate Engineer $ 98 Engineering Designer $ 73 RPLS 1 $ 90 BIM/CADD Technician 90 $ 73 Administrative Staff 70 MEP Engineering O’Xxxxxxx Xxxxxxxxx Principal $ 220 Project Manager 160 Senior Engineer 175 Engineer 165 Engineering Designer 115 Construction Administrator 130 BIM/CADD Technician 90 Administrative Staff 70 Co MEP Engineering CNG Engineering, PLLC Principal $ 205 Project Manager 176 Senior Engineer 160 Quality Control Supervisor 148 Engineer 126 Graduate Engineer 115 Senior Engineer Designer 115 Engineer Designer 93 Construction Administrator 105 BIM/CADD Technician 93 Administrative Staff 66 Structural Engineering Datum Xxxx, LLC Senior Principal $ 255.00 Principal $ 185.00 Senior Project Manager $ 160.00 Project Manager $ 145.00 Project Engineer $ 115.00 Graduate Engineer $ 100.00 Senior Production Manager $ 150.00 Senior Technician $ 120.00 Technician II $ 98.00 Technician $ 72.00 Senior Support Personnel $ 125.00 Support Personnel $ 68.00 Civil Engineering Xxxxxxx Engineering & Surveying Co., Inc. Principal $ 200 Associate Principal 175 Senior Project Manager 175 Project Manager 150 Senior Engineer 175 Engineer 150 Graduate Engineer 115 Engineering Designer 100 Construction Administrator 120 BIM/CADD Technician 90 Administrative Staff 60 Surveying Xxxxxxx Engineering & Surveying Co., Inc. Principal – Registered Professional Land Surveyor $ 140 Project Manager 125 Surveying Supervisor 85 Senior CADD Technician 80 CADD Technician 70 GIS Specialist 80 Field Crew (2-Man w/ GPS) 135 ATV (All-Terrain Vehicle) 75/day Research 50 Administrative Staff 60 58 Landscape Architecture Xxxxxxx & Associates Principal $ 160 Landscape Architect 125 $ 100 Administrative Staff $ 50 Cost Consultant – Xxxxx Program Management Principal $ 195 Senior Estimator $ 175 Estimator $ 145 Administrative Staff $ 75 Data/Telecommunications Consultant 4b Technology – DataCom Design Group Principal $ 195 Project Manager 185 190 Associate $ 180 Senior Consultant 165 $ 170 Consultant $ 145 Designer $ 124 Contract Administrator $ 98 BIM/CADD Technician 95 $ 65 Administrative Staff 65 $ 56 Acoustical/Audio-Visual Consultant 4b Technology Group Principal $195 Project Manager 185 Senior Consultant 165 Consultant 145 BIM/CADD Technician 95 Administrative Staff 65 Security Consultant 4b Technology – DataCom Design Group Principal $ 195 Project Manager 185 190 Associate Principal $ 180 Senior Consultant 165 $ 170 Consultant $ 145 BIM/CADD Technician 95 Administrative Staff 65 Energy Consultant The Xxxxx Group Principal - Energy $ 245 Project Manager III - Energy 175 Project Manager II - Energy 140 Project Manager I - Energy 115 Energy Specialist III - Energy 145 Energy Specialist II - Energy 115 Energy Specialist I - Energy 95 Life Safety and Code Compliance Xxxx Fire Protection Principal $ 195.00 Project Manager $ 150.00 Life Safety/Code Specialist $ 125.00 Senior Designer $ 100.00 124 Contract Administrator $ 98 BIM/CADD Technician $ 85.00 65 Administrative Staff $ 60.00 56 Laboratory Consultant - HERA Principal $ 195 Laboratory Consultant $ 175 Laboratory Design Engineer $ 175 Technical Coordinator $ 150 Laboratory Programmer $ 150 Laboratory Designer $ 150 Production Coordinator $ 140 BIM/CADD Technician $ 100 Technical Writer $125 Administrative Staff $ 60 Security Consultant – DataCom Design Group Principal $ 190 Project Director $ 180 Project Manager $ 170 Project Consultant $ 145 Project Engineer $ 124 BIM/CADD Technician $ 65 Administrative Staff $ 56 EXHIBIT B BIM Execution Plan DEVELOPED BY (Name and Company) PROJECT INFORMATION The intent of this BIM Execution Plan is to provide a framework that will let the owner, design team, and contractor deploy building information modeling (BIM) technology and best practices on this project faster and more cost- cost‐ effectively. If the delivery method is competitive sealed proposal then the contractor will be included in this Execution Plan at a later date. This plan delineates roles and responsibilities of each party, the detail and scope of information to be shared, relevant business processes and supporting software. To successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle. Project Name: Academic and Student Services Building Project Number: 22-3200 Brief Project Description: Additional Project Information: Construction Delivery Method: Project Schedule/Phases/Milestones: Include BIM milestones, pre-design pre‐design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. Project Phase/Milestone Estimated Start Date Estimated Completion Date Project Stakeholders Involved Schematic Design Design Development Construction Documents Construction KEY PROJECT CONTACTS List of lead BIM contacts for each organization on the project. Additional contacts can be included later in the document. Organization Contact Name Role/Title Location Email Phone BIM PROCESSES AND COLLABORATION PROCEDURES Describe the collaboration strategies used for developing the BIMs for the following applicable processes. Identify project team participants for each. Existing Conditions Design Authoring Design Reviews Space Tracking Energy Analysis Daylighting Analysis Cost Estimation 3D Coordination (design and construction) Model Updates during Construction Facilities Management Data Record Modeling Other (describe) Model Delivery Schedule, Application and File Exchange Type Document the information exchanges and file transfers that will occur on the project. Discipline BIM Use File Sender/Receiver One-Time One‐Time or Frequency Due Date or Start Date Model File Model Software Native File Type Version File Exchange Type BIM AND FACILITY DATA REQUIREMENT Describe the methods to be used to fulfill the data requirements described in the Facility Design Guidelines. BIM AND DATA QUALITY CONTROL Describe the strategy to control the quality of the model(s) and the checks to be performed to assure quality. Checks Definition Responsible Party Software Frequency Visual Check Ensure there are no unintended model components and the design intent has been followed Interference Check Detect problems in the model where two building components are clashing including soft and hard Standards Check Ensure that the BIM and CADD Standard have been followed (fonts, dimensions, line styles, levels/layers, etc.) Model Integrity Checks Describe the QC validation process used to ensure that the Project Facility Data set has no undefined, incorrectly defined or duplicated elements and the reporting process on non-compliant non‐compliant elements and corrective action plans Other MODEL STRUCTURE File Naming Structure File Name Formatting Architectural Model Structural Model Mechanical Model Plumbing Model Fire Sprinkler Model Electrical Model Model Structure Describe and diagram how the model is separated (building, floor, zone, area and/or discipline). Measurement and Coordinate System Describe the measurement system and coordinate system used. Model Accuracy and Tolerances Models should include all appropriate dimensioning as needed for design intent, analysis, and construction. Level of detail and included model elements are provided in the Information Exchange Worksheet. Phase Discipline Tolerance Design Documents ACCURATE TO +/- /‐ [ # ] OF ACTUAL SIZE AND LOCATION Shop Drawings ACCURATE TO +/- /‐ [ # ] OF ACTUAL SIZE AND LOCATION ACCURATE TO +/- /‐ [ # ] OF ACTUAL SIZE AND LOCATION PROJECT DELIVERABLES In this section, list the BIM deliverables for the project and the format in which the information will be delivered. BIM Submittal Item Stage Approximate Due Date Format Notes ATTACHMENTSATTACHMENTS List any supporting information and attach. TAMUS/FPC Review Document Distribution Matrix

Appears in 1 contract

Samples: assets.system.tamus.edu