Process acceptance and capacity assessment. The process acceptance and capacity assessment stages serve to demonstrate that the production process at the Supplier is operated under controlled conditions and meets the required capacity. The process acceptance and capacity assessment stages need to take place before or during the initial sample run. Improvements and optimisations to the process need to be performed in advance. Amongst other items, the following need to be completed by the Supplier prior to GG accepting the process: • Valid drawings/specifications must be available • The process must already have been operated under series conditions and approved internally by the Supplier. Drawing and specification requirements must have been verified. Deviations need to be incorporated into the drawing or specification by the product development department responsible • Production and testing facilities need to correspond to the series production stage and be documented. The measuring capability of testing and measuring equipment needs to be demonstrated • The agreed quality measures need to have been implemented and the results available (e.g. FMEA, capability studies, check plans) • The number of parts to be produced need to have been defined • All quality measures and sampling (incl. process acceptance and capacity assessment) need to have been performed and completed by the upstream suppliers • The employees involved need to have been trained and a record of this needs to be available • The existing packaging needs to satisfy the series packaging requirements defined • The number of parts required for the initial sample needs to have been defined and the planning of initial sampling coordinated with GG All deviations and improvements deemed necessary as a result of the process audit shall be recorded and must be immediately remedied or implemented.
AutoNDA by SimpleDocs

Related to Process acceptance and capacity assessment

  • Acceptance Testing At the time of installation of a LIS trunk group, and at no additional charge, acceptance tests will be performed to ensure that the service is operational and meets the applicable technical parameters.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.

  • ACCEPTANCE TESTS 11.1 If the Contract provides acceptance tests for Goods and/or the result of Services after their completion and/or delivery to the Purchaser, the acceptance shall only be considered as definitive when such tests have demonstrated the compliance of the Goods and/or the result of the Services to the requirements in the Contract.

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When EZ Phone or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port.

  • Scope of Interconnection Service 1.3.1 The NYISO will provide Energy Resource Interconnection Service to Interconnection Customer at the Point of Interconnection.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Acceptance Test 7.1 Before delivering the Goods or Articles upon completion of the Services, the Seller shall carefully inspect and test them for compliance with the Specification. The Seller shall, if required by the Buyer, give the Buyer reasonable notice of such test and the Buyer shall be entitled to be represented thereat. The test shall hereinafter be referred to as the “Acceptance Test”.

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.