Preliminary Engineering (30% design) Sample Clauses

Preliminary Engineering (30% design). The City of Pascagoula will provide scale maps or scale aerial photography of existing conditions at a scale of one inch = 100 feet depending on complexity of location. • The City of Pascagoula will prepare design plan drawings overlaid on maps/ photography showing, as applicable , design criteria and specifications, existing right-of-way limits along with railroad ownership; public and private at-grade crossings; distance from any obstruction on the platform to the edge of the platform; passenger stations, building(s), platforms, parking, access to primary highway system in the area, and public transit services and facilities. • The City of Pascagoula shall ensure that design submittals include a title sheet identified with a drawing revision number or date; an index identifying various plan sheets comprising the drawing set; a legend of symbols or abbreviations. • The Southern Rail Com,ission will obtain signature approval of the PE cover sheet by the City of Pascagoula , CSX, and Amtrak . PE deliverables will include design plans, cost estimate and schedule.
AutoNDA by SimpleDocs

Related to Preliminary Engineering (30% design)

  • Preliminary Engineering In order to receive City review and approval of the Extensions, Developer shall furnish two (2) copies of the plat map, topographic map and proposed roads profile sheets in electronic format prior to the City’s ordering of the engineering plans from its Engineer. The contour elevation and road profile elevations shall be referenced to NAVD ‘88 datum. In the event Developer’s engineer prepares the construction plans and specifications, the above information shall be a part of the extension construction plans to be reviewed and approved by the City’s Engineer. The final plat map shall be to the scale of 1-inch = 20 feet. The contour map shall have a scale of 1-inch = 20 feet and contour intervals of two (2) feet or less. The road profile sheets shall be to the scale of 1-inch = 20 feet. Developer shall provide a minimum of one benchmark, datum being NAVD ‘88, on the project site; and the elevation and location of the benchmark shall be indicated on the maps furnished by Developer.

  • Preliminary Design Phase During the Preliminary Design Phase, the CONSULTANT shall, if requested by the CITY and accepted by the CONSULTANT as part of a Services Authorization:

  • Design Development Documents See Section 2, Part 1, Article 2.1.5.

  • Architect/Engineer (A/E) means a person registered as an architect pursuant to Tex. Occ. Code Xxx., Chapter 1051, as a landscape architect pursuant to Tex. Occ. Code Xxx., Chapter 1052, a person licensed as a professional engineer pursuant to Tex. Occ. Code Xxx., Chapter 1001 and/or a firm employed by Owner or a design-build contractor to provide professional architectural or engineering services and to exercise overall responsibility for the design of a Project or a significant portion thereof, and to perform the contract administration responsibilities set forth in the Contract.

  • Preliminary Design § 4.3.1 Upon the Owner’s issuance of a written consent to proceed under Section 4.2.3, the Design-Builder shall prepare and submit a Preliminary Design to the Owner. The Preliminary Design shall include a report identifying any deviations from the Owner’s Criteria, and shall include the following:

  • Reverse Engineering The Customer must not reverse assemble or reverse compile or directly or indirectly allow or cause a third party to reverse assemble or reverse compile the whole or any part of the software or any products supplied as a part of the Licensed System.

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Geotechnical Engineer « »« » « » « » « » « »

  • Project Engineer If the Project has been designed by the Project Engineer, the Project Engineer is to act as the Owner's representative, assumes all duties and responsibilities, and has the rights and authority assigned to Project Engineer in the Contract Documents in connection with completion of the Work all in accordance with the Contract Documents.

  • Preliminary Examination 2.22.1 The Procuring entity will examine the tenders to determine whether they are complete, whether any computational errors have been made, whether required sureties have been furnished, whether the documents have been properly signed, and whether the tenders are generally in order.

Time is Money Join Law Insider Premium to draft better contracts faster.