Power Plant Electrical Equipment. The existing electrical equipment in Mokai I (11 kV switchgear 1000MVA, the 11kV generator synchronizing breakers 750 MVA and all related 11kV switches and fuses) are sufficient to withstand short circuit conditions when Mokai I and II are in operation at the same time, therefore no replacement or modification of equipment is required.
AutoNDA by SimpleDocs

Related to Power Plant Electrical Equipment

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)

  • Testing of Metering Equipment Connecting Transmission Owner shall inspect and test all of its Metering Equipment upon installation and at least once every two (2) years thereafter. If requested to do so by NYISO or Developer, Connecting Transmission Owner shall, at Developer’s expense, inspect or test Metering Equipment more frequently than every two (2) years. Connecting Transmission Owner shall give reasonable notice of the time when any inspection or test shall take place, and Developer and NYISO may have representatives present at the test or inspection. If at any time Metering Equipment is found to be inaccurate or defective, it shall be adjusted, repaired or replaced at Developer’s expense, in order to provide accurate metering, unless the inaccuracy or defect is due to Connecting Transmission Owner’s failure to maintain, then Connecting Transmission Owner shall pay. If Metering Equipment fails to register, or if the measurement made by Metering Equipment during a test varies by more than two percent from the measurement made by the standard meter used in the test, Connecting Transmission Owner shall adjust the measurements by correcting all measurements for the period during which Metering Equipment was in error by using Developer’s check meters, if installed. If no such check meters are installed or if the period cannot be reasonably ascertained, the adjustment shall be for the period immediately preceding the test of the Metering Equipment equal to one-half the time from the date of the last previous test of the Metering Equipment. The NYISO shall reserve the right to review all associated metering equipment installation on the Developer’s or Connecting Transmission Owner’s property at any time.

  • Collocation of Switching Equipment CLEC may collocate any equipment that is necessary for Interconnection or access to Unbundled Network Elements.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Metering Equipment 13.01. Utility will furnish, install, own and maintain metering equipment capable of measuring the flow of kilowatt-hours (kWh) of energy. The Customer's service associated with the CRG will be metered at a single metering point. The metering equipment will measure energy delivered by Utility to Customer and also measure energy delivered by Customer to Utility. Customer agrees to provide safe and reasonable access to the premises for installation of this equipment and its future maintenance or removal.

  • Capital Equipment Collaborator’s commitment, if any, to provide IC with capital equipment to enable the research and development activities under the Research Plan appears in Appendix B. If Collaborator transfers to IC the capital equipment or provides funds for IC to purchase it, then IC will own the equipment. If Collaborator loans capital equipment to IC for use during the CRADA, Collaborator will be responsible for paying all costs and fees associated with the transport, installation, maintenance, repair, removal, or disposal of the equipment, and IC will not be liable for any damage to the equipment.

  • Plant The expression ‘Plant’ as used in the tender papers shall mean every temporary accessory necessary or considered necessary by the Engineer to execute, construct, complete and maintain the work and all altered, modified, substituted and additional works ordered in the time and the manner herein provided and all temporary materials and special and other articles and appliance of every sort kind and description whatsoever intended or used therefore.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Special Equipment The Employer agrees to provide specialty tools, emergency supplies/equipment, testing equipment and safety equipment as needed to perform required duties as determined and authorized by the Chief or designee. The emergency supplies/equipment will include appropriate survival provisions and equipment for each permanent Maintenance Mechanic 4 and the Law Enforcement Communications Systems Supervisor when they are performing duties that would require such provisions and equipment. When necessary, the employer will replenish used or expired survival provisions and damaged and unusable equipment. All supplies and equipment will be returned to the employer when the employee is no longer performing the duties that would require the survival provisions and/or equipment.