POST-EVENT INSPECTION Sample Clauses

POST-EVENT INSPECTION. A representative from BCF and a representative from the second party shall meet at a mutually agreeable time after the event to inspect the property for damage, unclean stalls, proper manure removal, garbage pick-up and cleanliness of the bathrooms and grounds.
AutoNDA by SimpleDocs
POST-EVENT INSPECTION. The post-inspection must be done by 5:00 PM on Monday.
POST-EVENT INSPECTION. The Clubhouse and its adjacent areas will be inspected by the Property Manager or designees and the LESSEE within 24 hours after the conclusion of the function.
POST-EVENT INSPECTION. 18.1. The Society, or its Agent, will inspect the Facility as soon as is reasonably possible after the Rental Period.
POST-EVENT INSPECTION. PRODUCER and the Town Manager shall jointly perform and document a post-EVENT inspection of the PREMISES not later than , 2019 at :00 p.m. before the PREMISES are returned to AVON. PRODUCER shall notify the Town Manager of any problems or damage that may have occurred during the EVENT during the post-EVENT inspection. PRODUCER shall be liable for any damage to the PREMISES and any adjacent Town Property caused by the installation or removal of any alteration, addition or improvement. AVON may take action to repair and restore any damage caused by PRODUCER and PRODUCER shall be liable for such costs, including reasonable attorneysfees and costs to enforce this Agreement.

Related to POST-EVENT INSPECTION

  • Environmental Inspection at End of Agreement Term A. At Authority’s discretion, at least one hundred and twenty (120) days before the expiration or early termination of the Term as provided herein, Company will conduct an environmental inspection and examination of the Company Premises. At its discretion, Authority may complete environmental reviews to determine if recognized environmental conditions exist that could warrant soil and groundwater sampling. If warranted by the findings of Company or Authority’s inspection or if requested by Authority, a compliance audit or site assessment will be performed within the aforementioned time period by a qualified professional acceptable to Authority who will report the findings to Authority. The cost for professional consulting or engineering services required for such audit will be at the expense of Company. If a site assessment is conducted, Company agrees to pay all associated laboratory and testing fees incurred to test and analyze samples collected during the site assessment process. The Authority may also choose to conduct the compliance audit or site assessment. If the results of the assessment indicate that the Company Premises have been impacted by the release of Hazardous Substances, Company will immediately take such action as is necessary and will provide a substantial guaranty in a form and content acceptable to Authority that Company will clean up the contamination at its own expense, at no expense to Authority, and in accordance with Applicable Laws to the extent that it is obligated to do so by virtue of the foregoing provisions of this Article.

  • Independent Review and Inspection The Owner may undertake independent inspection of the installation of the Work. Such independent inspector shall operate on behalf of the Owner and shall act to protect the best interests of the Owner.

  • RECORD RETENTION AND INSPECTION/AUDIT SETTLEMENT The Contractor shall maintain accurate and complete financial records of its activities and operations relating to this Contract in accordance with generally accepted accounting principles. The Contractor shall also maintain accurate and complete employment and other records relating to its performance of this Contract. The Contractor agrees that the County, or its authorized representatives, shall have access to and the right to examine, audit, excerpt, copy, or transcribe any pertinent transaction, activity, or record relating to this Contract. All such material, including, but not limited to, all financial records, bank statements, cancelled checks or other proof of payment, timecards, sign-in/sign-out sheets and other time and employment records, and proprietary data and information, shall be kept and maintained by the Contractor and shall be made available to the County during the term of this Contract and for a period of five (5) years thereafter unless the County’s written permission is given to dispose of any such material prior to such time. All such material shall be maintained by the Contractor at a location in Los Angeles County, provided that if any such material is located outside Los Angeles County, then, at the County’s option, the Contractor shall pay the County for travel, per diem, and other costs incurred by the County to examine, audit, excerpt, copy, or transcribe such material at such other location.

  • Document Inspection In accordance with section 216.1366, F.S., the Department is authorized to inspect the: (a) financial records, papers, and documents of the Contractor that are directly related to the performance of the Contract or the expenditure of state funds; and (b) programmatic records, papers, and documents of the Contractor which the Department determines are necessary to monitor the performance of the Contract or to ensure that the terms of the Contract are being met. The Contractor shall provide such records, papers, and documents requested by the Department within 10 Business Days after the request is made.

  • Response/Compliance with Audit or Inspection Findings A. Grantee must act to ensure its and its Subcontractors’ compliance with all corrections necessary to address any finding of noncompliance with any law, regulation, audit requirement, or generally accepted accounting principle, or any other deficiency identified in any audit, review, or inspection of the Contract and the services and Deliverables provided. Any such correction will be at Grantee’s or its Subcontractor's sole expense. Whether Xxxxxxx's action corrects the noncompliance shall be solely the decision of the System Agency.

  • Monitoring and Inspection The Interconnected Transmission Owner may monitor construction and installation of Interconnection Facilities that the Interconnection Customer is constructing. Upon reasonable notice, authorized personnel of the Interconnected Transmission Owner may inspect any or all of such Interconnection Facilities to assess their conformity with Applicable Standards.

  • Inspection & Audit Contractor agrees that the relevant books, records (written, electronic, computer related or otherwise), including, without limitation, relevant accounting procedures and practices of Contractor or its subcontractors, financial statements and supporting documentation, and documentation related to the work product shall be subject, at any reasonable time, to inspection, examination, review, audit, and copying at any office or location of Contractor where such records may be found, with or without notice by the City, and with regard to any federal funding, the relevant federal agency, the Comptroller General, the General Accounting Office, the Office of the Inspector General, or any of their authorized representatives. All subcontracts shall reflect the requirements of this paragraph.

  • Inspection Period Buyer shall be under no obligation to purchase the Property or otherwise perform under this Agreement unless Buyer determines the Property to be, in all respects, suitable for its intended purposes. The decision as to whether the Property is suitable for its intended purposes shall be the sole decision of Buyer, determined in the absolute discretion of Buyer, with Buyer’s decision being final and binding upon both Parties. Buyer shall have until , 20 , at : ☐ AM ☐ PM to notify Seller of its termination of this Agreement due to Buyer's determination that the Property is unsuitable for its intended purpose ("Inspection Period"). In the event Buyer elects to terminate this Agreement, Buyer shall provide written notice of termination to Seller prior to the expiration of the Inspection Period. In the event Buyer provides said notice of termination, Seller and any Escrow Agent shall be obligated to return the Escrow Money to the Buyer as provided in Section V hereof, and neither party shall have any further rights or obligations under this Agreement. In the event Buyer does not submit written notice of termination prior to the expiration of the Inspection Period, the Buyer shall be deemed to be satisfied with its inspections of the Property and this contingency shall be deemed to be fulfilled. The Seller, at no expense, shall fully cooperate with Buyer in obtaining any and all approvals required from any Federal, State, or Local Government ("Governmental Approvals") necessary for Buyer to satisfy their needs during the Inspection Period for the suitability of the Property. Said Governmental Approvals shall be obtained during the Inspection Period unless the Parties agree otherwise. Any additional agreements related to this Section must be done in writing and attached to this Agreement.

  • INSPECTION/TESTING All Products sold pursuant to this Agreement will be subject to inspection/testing by or at the direction of H- GAC and/or the ordering Customer, either at the delivery destination or the place of manufacture. In the event a Product fails to meet or exceed all requirements of this Agreement, and unless otherwise agreed in advance, the cost of any inspection and/or testing, will be the responsibility of the Contractor.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

Time is Money Join Law Insider Premium to draft better contracts faster.