Participation in Capacity Markets Sample Clauses

Participation in Capacity Markets. A Developer, in order to be eligible to become an Installed Capacity Supplier or receive Unforced Capacity Deliverability Rights or External-to-ROS Deliverability Rights, must obtain XXXX pursuant to the procedures set forth in this Attachment S. A Developer must enter a Class Year Deliverability Study or Expedited Deliverability Study in order to obtain XXXX, unless otherwise provided for in this Attachment S. The MW amount of XXXX requested by a Developer, stated in MW of Installed Capacity (“ICAP”), cannot exceed the MW levels specified in Sections 25.8.1 of this Attachment S. All requests for XXXX must be in tenths of a MW. The ISO will perform the Class Year Deliverability Study and Expedited Deliverability Study in accordance with these rules and with input of Market Participants, to determine the deliverability of the Projects requesting XXXX in each study. The Expedited Deliverability Study will only determine the extent to which the Project is deliverable at the full amount of requested XXXX. The Class Year Deliverability Study will determine deliverability at the full amount of requested XXXX and, if not deliverable, will identify and allocate the cost of the System Deliverability Upgrades needed to make deliverable each Class Year XXXX Project. In order to be eligible to become an Installed Capacity Supplier or receive Unforced Capacity Deliverability Rights or External-to-ROS Deliverability Rights, a Developer must be found fully deliverable at the requested XXXX level in an Expedited Deliverability Study or, in a Class Year Study, either (1) accept its deliverable MW in a Class Year Study or Expedited Deliverability Study; or (2) fund or commit to fund, in accordance with these rules, the System Deliverability Upgrades needed for its Project to be deliverable at the requested level of XXXX.
AutoNDA by SimpleDocs
Participation in Capacity Markets. E. The Pre-Existing System. 25.7.5 The Pre-Existing System.

Related to Participation in Capacity Markets

  • CLEC Provided Splitter – Line Sharing 3.4.1 Freedom may at its option purchase, install and maintain central office POTS splitters in its collocation arrangements. Freedom may use such splitters for access to its customers and to provide digital line subscriber services to its customers using the High Frequency Spectrum. Existing Collocation rules and procedures and the terms and conditions relating to Collocation set forth in Attachment 4- Central Office shall apply.

  • Line Splitting – UNE-L In the event TWTC provides its own switching or obtains switching from a third party, TWTC may engage in line splitting arrangements with another CLEC using a splitter, provided by TWTC, in a Version: 4Q06 Standard ICA 11/30/06 Collocation Space at the central office where the loop terminates into a distribution frame or its equivalent.

  • Local Circuit Switching Capability, including Tandem Switching Capability 4.2.1 Local circuit switching capability is defined as: (A) line-side facilities, which include, but are not limited to, the connection between a loop termination at a main distribution frame and a switch line card; (B) trunk-side facilities, which include, but are not limited to, the connection between trunk termination at a trunk-side cross-connect panel and a switch trunk card; (C) switching provided by remote switching modules; and (D) all features, functions, and capabilities of the switch, which include, but are not limited to: (1) the basic switching function of connecting lines to lines, line to trunks, trunks to lines, and trunks to trunks, as well as the same basic capabilities made available to BellSouth’s customers, such as a telephone number, white page listings, and dial tone; and (2) all other features that the switch is capable of providing, including but not limited to customer calling, customer local area signaling service features, and Centrex, as well as any technically feasible customized routing functions provided by the switch. Any features that are not currently available but are technically feasible through the switch can be requested through the BFR/NBR process.

  • Switching and Tagging Rules Each Party shall provide the other Parties a copy of its switching and tagging rules that are applicable to the other Parties’ activities. Such switching and tagging rules shall be developed on a non-discriminatory basis. The Parties shall comply with applicable switching and tagging rules, as amended from time to time, in obtaining clearances for work or for switching operations on equipment.

  • Acting Capacity ‌ When an employee is assigned temporarily to a job for which he/she is qualified in a higher pay grade for a period of five (5) days or his/her regular workweek, whichever is less, the employee shall be paid retroactively from the initial date of the temporary transfer for the duration of the temporary assignment. The employee shall be paid as if he/she had been promoted during such assignment. In no event may an employee acquire any status in a higher classification as a result of his/her temporary assignment. Acting capacity assignments shall not be made on an arbitrary or capricious basis. Employees shall not be rotated in acting capacity in an arbitrary or capricious manner in order to avoid payment of acting capacity pay. This Article shall not be used in lieu of the proper processing of any request for reclassification or reallocation of a position pursuant to Article 48, Reclassifications, or the filling of a vacancy pursuant to Article 56, Seniority.

  • Capacity Building 1. Contractor will work in partnership with AOD to study the viability of billing under Drug Medi-Cal and 3rd party payer.

  • Maximum Capacity The Sick Leave Bank shall accumulate unused Bank days from year to year to a maximum capacity which shall not exceed double the number of eligible employees as defined in the above Section C, Eligibility for Membership.

  • Contract Capacity The generation capability designated for the Project shall be the contract capacity in MW designated in the Cover Sheet, net of all auxiliary loads, station electrical uses, and Electrical Losses (the “Contract Capacity”). Throughout the Delivery Term, Seller shall sell and deliver all Product produced by the Project solely to Buyer. In no event shall Buyer be obligated to receive, in any Settlement Interval, any Surplus Delivered Energy. Seller shall not receive payment for any Surplus Delivered Energy. To the extent Seller delivers Surplus Delivered Energy to the Delivery Point in a Settlement Interval in which the Real-Time Price for the applicable PNode is negative, Seller shall pay Buyer an amount equal to the Surplus Delivered Energy (in MWh) during such Settlement Interval, multiplied by the absolute value of the Real-Time Price per MWh for such Settlement Interval.]

  • Adjustment to Installed Capacity Estimate Permitted reduction

  • Heavy Blocks An employee shall not be required to lift a building block in excess of 20 kg in weight unless such employee is provided with a mechanical aid or with an assisting employee; provided that an employee shall not to manually lift any building block in excess of 20 kg weight to a height of more than 4 feet (1.2m) above the working platform.

Time is Money Join Law Insider Premium to draft better contracts faster.