Oil Tank Location/Removal Sample Clauses

Oil Tank Location/Removal. To the fullest extent possible, approved methods will be used in locating an underground oil tank. Approved methods include using a magnetometer, probe, or GPR system. Trenches are not permitted. New York State DEC guidelines for oil tank removal must be followed. To the fullest extent possible, excavation will be limited to within two (2) feet of the tank footprint and no more than one (1) foot below the depth of the tank bottom.
AutoNDA by SimpleDocs

Related to Oil Tank Location/Removal

  • Work Location While employed by the Company hereunder, the Executive shall perform his duties (when not traveling or engaged elsewhere in the performance of his duties) at the offices of the Company in Bermuda. The Executive shall travel to such places on the business of the Company in such manner and on such occasions as the Company may from time to time reasonably require.

  • Equipment Location This Contract is for service of the Equipment at the location in the attached EQUIPMENT SCHEDULE hereof. If any unit of Equipment is moved (which movement will in all instances be at Customer's risk and expense), Customer will so notify Contractor. Contractor may terminate this Contract if, in its discretion, the environmental conditions in which any unit of Equipment is placed are not suitable for satisfactory performance, or if the new location is out of Contractor's ordinary operating area.

  • Data Location 1.1. The CONTRACTOR shall not store or transfer non-public COUNTY data outside of the United States. This includes backup data and Disaster Recovery locations. The CONTRACTOR will permit its personnel and contractors to access COUNTY data remotely only as required to provide technical support. (Remote access to data from outside the continental United States is prohibited unless approved in advance and in writing by the County.)

  • Project Location [Insert the location of the Project, if applicable]

  • Collocation of Switching Equipment CLEC may collocate any equipment that is necessary for Interconnection or access to Unbundled Network Elements.

  • UNDERGROUND LOCATIONS Prior to the Company commencing any work the Customer must advise the Company of the precise location of all underground services on the site and clearly xxxx the location. The underground mains and services the Customer must identify include, but are not limited to, telephone cables, fibre optic cables, electrical services, gas services, sewer services, pumping services, sewer connections, sewer sludge mains, water mains, irrigations pipes, oil pumping mains and any other services that may be on site. Whilst the Company will take all care to avoid damage to any underground services the Customer agrees to indemnify the Company in respect of all any liability claims, loss, damage, cost and fines as a result of damage to services not precisely located and notified pursuant to this clause.

  • Ownership and Location of Metering Equipment The Metering Equipment to be constructed, the capability of the Metering Equipment to be constructed, and the ownership thereof, are identified on the attached Schedule C to this ISA.

  • ADJACENT EXCAVATION-SHORING 32. If an excavation shall be made upon land adjacent to the demised premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the demised premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which demised premises form a part from injury or damage and to support the same by proper foundations without any claim for damages or indemnity against Owner, or diminution or abatement of rent.

  • Program Location A. Unless otherwise agreed upon in writing, the parties acknowledge and agree that the Work of this Agreement will be performed at the following Property address: Ktr Address1 Address2

  • Testing of Metering Equipment Connecting Transmission Owner shall inspect and test all of its Metering Equipment upon installation and at least once every two (2) years thereafter. If requested to do so by NYISO or Developer, Connecting Transmission Owner shall, at Developer’s expense, inspect or test Metering Equipment more frequently than every two (2) years. Connecting Transmission Owner shall give reasonable notice of the time when any inspection or test shall take place, and Developer and NYISO may have representatives present at the test or inspection. If at any time Metering Equipment is found to be inaccurate or defective, it shall be adjusted, repaired or replaced at Developer’s expense, in order to provide accurate metering, unless the inaccuracy or defect is due to Connecting Transmission Owner’s failure to maintain, then Connecting Transmission Owner shall pay. If Metering Equipment fails to register, or if the measurement made by Metering Equipment during a test varies by more than two percent from the measurement made by the standard meter used in the test, Connecting Transmission Owner shall adjust the measurements by correcting all measurements for the period during which Metering Equipment was in error by using Developer’s check meters, if installed. If no such check meters are installed or if the period cannot be reasonably ascertained, the adjustment shall be for the period immediately preceding the test of the Metering Equipment equal to one-half the time from the date of the last previous test of the Metering Equipment. The NYISO shall reserve the right to review all associated metering equipment installation on the Developer’s or Connecting Transmission Owner’s property at any time.