Oil Spill Response Equipment Inspections Sample Clauses

Oil Spill Response Equipment Inspections. 1 The NPREP was developed to establish a workable exercise program which meets the intent of section 4202(a) of the Oil Pollution Act of 1990 (OPA 90), amending section 311(j) of the Clean Water Act (CWA), by adding a new subsection for spill response preparedness (33 U.S.C. § 1321(j)(7)). NPREP 2016 (81 FR 21362) is the current version, as of the signing of this MOU. Each Party recognizes that it may independently execute its respective oil spill response equipment inspection responsibilities in accordance with applicable statutes and regulations. Both Parties administer oil spill response equipment inspection programs for covered facilities for the purpose of ensuring compliance with the statutes and regulations that they implement. The Parties will coordinate their respective oil spill response equipment inspection activities where practicable, and work to conduct inspections that minimize disruption to industry, while maximizing efficiency and safety. To this end, the Parties will endeavor to exchange information prior to conducting independent oil spill response equipment inspections or prior to conducting joint inspections. Each Party will provide the other with the opportunity to participate in oil spill response equipment inspections and will exchange or jointly prepare inspection reports. The Parties also agree to cooperatively review inspection results, as permitted by applicable statutes and regulations. If, during the review of oil spill response equipment, a Party determines that the condition of the equipment is such that the operator may be unable to carry out its OSRP responsibilities, the reviewing Party will promptly inform the other and the Parties may coordinate their response to the operator.
AutoNDA by SimpleDocs

Related to Oil Spill Response Equipment Inspections

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Cleanliness and Safety; Entry Resident agrees to maintain the assigned bedroom space, the apartment and the common areas of the Property in a clean, safe and sanitary condition, to exercise all due care in the use of same, and to cooperate fully with the Property pest control program as requested. Resident will be responsible for the cost of treatment for bedbugs and similar pests to the extent Owner’s pest control vendor reasonably determines that an infestation has originated within Resident’s assigned space and during Resident’s occupancy. Resident will place all trash in provided receptacles and will be responsible for the cost of cleaning the interior or exterior of the apartment if not kept in sanitary condition. When outdoor temperatures are below 40 degrees Fahrenheit, Resident will keep the apartment’s heat turned on to prevent frozen or burst pipes, including during vacations. When outdoor temperatures exceed 85 degrees Fahrenheit, Resident will keep the apartment’s air conditioning turned on and set to a reasonable temperature to prevent mold or mildew growth, including during vacations. Owner and its agents, employees and contractors may enter any apartment and bedroom space to perform routine maintenance, inspections, showings and other ordinary functions, provided that Owner will provide advance notice to residents of an apartment before such entry. Owner reserves the right to enter an apartment and any bedroom space without prior notice (including a passkey and/or disarming the alarm or other means of entry if locks have been changed) for emergency maintenance or repair purposes, or when there is reasonable cause to believe that a situation exists that could cause danger to life, safety, health or property. Owner may confiscate any item deemed to cause a danger and is under no obligation to pay compensation for or to return such items.

  • Primary Frequency Response Developer shall ensure the primary frequency response capability of its Large Generating Facility by installing, maintaining, and operating a functioning governor or equivalent controls. The term “functioning governor or equivalent controls” as used herein shall mean the required hardware and/or software that provides frequency responsive real power control with the ability to sense changes in system frequency and autonomously adjust the Large Generating Facility’s real power output in accordance with the droop and deadband parameters and in the direction needed to correct frequency deviations. Developer is required to install a governor or equivalent controls with the capability of operating: (1) with a maximum 5 percent droop ± 0.036 Hz deadband; or (2) in accordance with the relevant droop, deadband, and timely and sustained response settings from an approved Applicable Reliability Standard providing for equivalent or more stringent parameters. The droop characteristic shall be: (1) based on the nameplate capacity of the Large Generating Facility, and shall be linear in the range of frequencies between 59 and 61 Hz that are outside of the deadband parameter; or (2) based on an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. The deadband parameter shall be: the range of frequencies above and below nominal (60 Hz) in which the governor or equivalent controls is not expected to adjust the Large Generating Facility’s real power output in response to frequency deviations. The deadband shall be implemented: (1) without a step to the droop curve, that is, once the frequency deviation exceeds the deadband parameter, the expected change in the Large Generating Facility’s real power output in response to frequency deviations shall start from zero and then increase (for under-frequency deviations) or decrease (for over-frequency deviations) linearly in proportion to the magnitude of the frequency deviation; or (2) in accordance with an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. Developer shall notify NYISO that the primary frequency response capability of the Large Generating Facility has been tested and confirmed during commissioning. Once Developer has synchronized the Large Generating Facility with the New York State Transmission System, Developer shall operate the Large Generating Facility consistent with the provisions specified in Articles 9.5.5.1 and 9.5.5.2 of this Agreement. The primary frequency response requirements contained herein shall apply to both synchronous and non-synchronous Large Generating Facilities.

Time is Money Join Law Insider Premium to draft better contracts faster.