OCIP Project Safety Rules Sample Clauses

OCIP Project Safety Rules. Xxxxx/Xxxxx management and personnel will be fully committed to a safe and healthy workplace.
AutoNDA by SimpleDocs

Related to OCIP Project Safety Rules

  • Environmental, Health and Safety Matters (a) The Company has complied and is in compliance with all Environmental, Health, and Safety Requirements.

  • Technical Specifications Each Bloom System is an integrated system comprised of a fuel cell stack assembly and associated balance of plant components that converts a fuel into electricity using electrochemical means that (i) has a Nameplate Capacity of at least 0.5 kilowatts of electricity using an electrochemical process and (ii) has an electricity-only generation efficiency greater than thirty percent (30%).

  • Environmental, Health and Safety Laws There does not exist any violation by the Borrower or any Subsidiary of any applicable federal, state or local law, rule or regulation or order of any government, governmental department, board, agency or other instrumentality relating to environmental, pollution, health or safety matters which will or threatens to impose a material liability on the Borrower or a Subsidiary or which would require a material expenditure by the Borrower or such Subsidiary to cure. Neither the Borrower nor any Subsidiary has received any notice to the effect that any part of its operations or properties is not in material compliance with any such law, rule, regulation or order or notice that it or its property is the subject of any governmental investigation evaluating whether any remedial action is needed to respond to any release of any toxic or hazardous waste or substance into the environment, the consequences of which non-compliance or remedial action could constitute an Adverse Event.

  • Environmental, Health and Safety The Policy Board shall review, approve and monitor environmental and workplace health and safety guidelines, the goal of which is to achieve compliance with current national, state and local laws and regulations regarding environmental and workplace health and safety.

  • Tenant Improvement Plans Any work proposed by Tenant at the Premises or Building (the “Tenant Improvements”) shall be subject to Landlord’s reasonable prior approval and shall be subject to the other terms and conditions of this Exhibit, which approval shall not be unreasonably withheld or delayed except for good cause shown. All architectural, engineering and other design fees shall be paid by Tenant, provided that, of the total Tenant Improvement Allowance, up to Five and No/100 Dollars (S5.00) per rentable square foot of the Premises of such fees may be subject to reimbursement under the Tenant Improvement Allowance. Tenant shall use its architect, engineers and other design professionals, all of whom shall comply with any applicable licensing or governmental requirements of the City of Santa Xxxxx and the State of California. Tenant shall cause its architect, who shall be subject to Landlord’s prior approval (“Tenant’s Architect”), which approval shall not be unreasonably withheld or delayed except for good cause shown, to prepare a draft space plan (the “Space Plan”) for the Tenant Improvements and shall submit the proposed Space Plan to Landlord for the latter’s approval (not to be unreasonably withheld or delayed) within twenty-one (21) days following mutual execution of the Lease. (If available upon mutual execution of this Lease, a mutually-approved preliminary space plan for the Tenant Improvements has been attached hereto as Exhibit C-1.) Landlord shall deliver to Tenant any written objections, questions or comments of Landlord with regard to the Space Plan, and Tenant shall cause the Space Plan to be revised to address such written comments and shall resubmit said Space Plan to Landlord for approval within five (5) business days thereafter. Such process shall continue until Landlord has approved the Space Plan. Tenant’s Architect shall then prepare working drawings and specifications for the Tenant Improvements, including architectural, structural, plumbing, mechanical, electrical, and fire protection drawings as required, suitable for permit application (the “Working Drawings”) and shall submit the proposed Working Drawings to Landlord for the latter’s approval within sixty (60) days following Landlord’s approval of the final Space Plan. The Space Plan and Working Drawings shall be subject to Landlord’s approval, which Landlord agrees shall not be unreasonably withheld or delayed. Landlord shall not be deemed to have acted unreasonably if it withholds its approval thereof because, in Landlord’s reasonable opinion as supported by statement or reports from licensed engineers, the work, as described in any such item: (i) will adversely affect Building systems, the structure of the Building or the safety of the Building and/or their occupants; (ii) will materially impair Landlord’s ability to furnish services to Tenant or other tenants at the Project; (iii) would materially increase the cost of operating the Building; (iv) would violate any governmental laws, rules or ordinances (or interpretations thereof); (v) contains or uses hazardous or toxic materials or substances not permitted under Applicable Laws; (vi) would affect the external appearance of the Building; (vii) would materially and adversely affect another tenant’s premises at the Project: or (viii) is prohibited by any mortgage, trust deed or other instrument encumbering the Building or Project. Landlord shall deliver to Tenant any written objections, questions or comments of Landlord with regard to the Working Drawings, and Tenant shall cause the Working Drawings to be revised to address such written comments and shall resubmit said Working Drawings to Landlord for approval within ten (10) business days thereafter. Such process shall continue until Landlord has approved the Working Drawings. Landlord’s approval of the Space Plan and/or the Working Drawings shall not be deemed any representation or warranty that the same comply with applicable codes.

  • Project Scope This section should contain SOW summary information including: o Project definition and expected duration o Project goals, objectives, o Priorities & expectations o Project approach & responsibilities o Overall coordination and assumptions

  • Quality Service Standards/NAV Errors Price Associates and the Fund may, from time to time, agree to certain quality service standards, with respect to the Services hereunder. In the event Price Associates is the party responsible for causing an error in the computation of the net asset value for a Fund or share class of a Fund (“NAV Error”), the actions that are required to be taken as to such NAV Error shall be made in accordance with the Fund’s Net Asset Value Error Correction Policy and Procedures (“NAV Error Policy”) attached hereto as Schedule II.

  • Environment, Health, and Safety (i) The Seller, and its predecessors and Affiliates has complied with all Environmental, Health, and Safety Laws, and no action, suit, proceeding, hearing, investigation, charge, complaint, claim, demand, or notice has been filed or commenced against any of them alleging any failure so to comply. Without limiting the generality of the preceding sentence, each of the Seller, and its predecessors and Affiliates has obtained and been in compliance with all of the terms and conditions of all permits, licenses, and other authorizations which are required under, and has complied with all other limitations, restrictions, conditions, standards, prohibitions, requirements, obligations, schedules, and timetables which are contained in, all Environmental, Health, and Safety Laws.

  • Budget For Tenant Improvements A preliminary detailed breakdown by trade of the costs incurred or that will be incurred in connection with the design and construction of the Tenant Improvements is set forth on Schedule 3 attached hereto (the “Budget”). The Budget is based upon the TI Construction Drawings approved by Tenant and shall include a payment to Landlord of administrative rent (“Administrative Rent”) equal to 1.5% of the TI Costs, which Administrative Rent shall include, without limitation, all out-of-pocket costs, expenses and fees incurred by or on behalf of Landlord arising from, out of, or in connection with monitoring the construction of the Tenant Improvements and Changes, and shall be payable out of the TI Fund. Landlord shall provide Tenant with a final Budget promptly following approval of the TI Construction Drawings by Landlord and Tenant. The Budget shall be subject to Tenant’s review and approval which approval shall not be unreasonably withheld, conditioned or delayed by Tenant. Tenant shall have the right to approve any use of the contingency in the Budget by Landlord; provided, however, that, Tenant’s approval shall not be unreasonably withheld, conditioned or delayed, and the contingency shall not be available for use by Tenant for any Changes until all unforeseen conditions, changes to resulting from governmental agencies and the like have first been paid for out of the contingency.

  • Quality Specifications SANMINA-SCI shall comply with the quality specifications set forth in its Quality Manual, incorporated by reference herein, a copy of which is available from SANMINA-SCI upon request.

Time is Money Join Law Insider Premium to draft better contracts faster.