Northwest Mosaic Sample Clauses

Northwest Mosaic. All of the Access Channels will be made available through a multi- channel display (i.e. a picture in picture feed) on a single TV screen called a “mosaic” (the “Northwest Mosaic”), where a cable Subscriber can access via an interactive video menu one of any of the thirteen (13) PEG Access Channels. The Northwest Mosaic will be located on Channel
AutoNDA by SimpleDocs

Related to Northwest Mosaic

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • Cornerstone shall notify the LLC and confirm such advice in writing (i) when the filing of any post-effective amendment to the Registration Statement or supplement to the Prospectus is required, when the same is filed and, in the case of the Registration Statement and any post-effective amendment, when the same becomes effective, (ii) of any request by the Securities and Exchange Commission for any amendment of or supplement to the Registration Statement or the Prospectus or for additional information and (iii) of the entry of any stop order suspending the effectiveness of the Registration Statement or the initiation or threatening of any proceedings for that purpose, and, if such stop order shall be entered, Cornerstone shall use its best efforts promptly to obtain the lifting thereof.

  • Environmental Services 1. Preparation of Environmental Documentation (CEQA/NEPA) including but not limited to the following:

  • Millwright In the case of a job site located outside a millwright’s region of residence, the employer may assign a millwright holding a journeyman competency certificate or an apprentice competency certificate anywhere in Quebec, provided the millwright has worked 1,500 or more hours for the employer in the construction industry in Quebec or elsewhere in Canada during the first 24 months of the 26 months preceding the issuance or renewal of his competency certificate, as follows:

  • Orlando, FL; Ft Lauderdale, FL; Charlotte-Gastonia-Rock Hill, NC; Greensboro-Winston Salem-High Point, NC; Nashville, TN; and New Orleans, LA, and BellSouth has provided non- discriminatory cost based access to the Enhanced Extended Link (EEL) throughout Density Zone 1 as determined by NECA Tariff No. 4 as in effect on January 1, 1999.

  • Xxxxx, Haldimand, Norfolk (a) An employee shall be granted five working days bereavement leave with pay upon the death of the employee’s spouse, child, stepchild, parent, stepparent, legal guardian, grandchild or step-grandchild.

  • Quality Control Plan Within forty five (45) days after the design development documents are approved, the Design-Builder shall develop a quality control plan for the Project (the “Quality Control Plan”). A draft of the Quality Control Plan shall be submitted to the Department and shall be subject to the Department’s review and approval. The Quality Control Plan shall be tailored to the specific products/type of construction activities contemplated by the GMP Basis Documents, and in general, shall include a table of contents, quality control team organization, duties/responsibilities of quality control personnel, submittal procedures, inspection procedures, deficiency correction procedures, documentation process, and a list of any other specific actions or procedures that will be required for key elements of the Work.

  • Gouvernement des États-Unis Le logiciel et la documentation constituent des « Commercial Items » (éléments commerciaux), tel que ce terme est défini dans la clause 48 C.F.R. (Code of Federal Rules) §2.101, consistant en « Commercial Computer Software » (logiciel) et « Commercial Computer Software Documentation » (documentation), tels que ces termes sont utilisés dans les clauses 48 C.F.R. §12.212 ou 48 C.F.R. §227.7202. Conformément à la clause 48 C.F.R. §12.212 ou 48 C.F.R. §227.7202-1 à 227.7202-4, le « Commercial Computer Software » et le « Commercial Computer Software Documentation » sont fournis sous licence au gouvernement des États-Unis (a) uniquement comme « Commercial Items » et (b) uniquement accompagnés des droits octroyés à tous les autres utilisateurs conformément aux termes et conditions ci-inclus. Droits non publiés réservés en vertu de la législation des droits d’auteur en vigueur aux États-Unis.

  • Secondary Systems The Developer and Connecting Transmission Owner shall each cooperate with the other in the inspection, maintenance, and testing of control or power circuits that operate below 600 volts, AC or DC, including, but not limited to, any hardware, control or protective devices, cables, conductors, electric raceways, secondary equipment panels, transducers, batteries, chargers, and voltage and current transformers that directly affect the operation of Developer or Connecting Transmission Owner’s facilities and equipment which may reasonably be expected to impact the other Party. The Developer and Connecting Transmission Owner shall each provide advance notice to the other Party, and to NYISO, before undertaking any work on such circuits, especially on electrical circuits involving circuit breaker trip and close contacts, current transformers, or potential transformers.

  • Loop A transmission path that extends from a Main Distribution Frame or functionally comparable piece of equipment in a Customer's serving End Office, to the Rate Demarcation Point (or NID if installed at the Rate Demarcation Point) in or at the Customer's premises. The actual transmission facilities used to provide a Loop may utilize any of several technologies.

Time is Money Join Law Insider Premium to draft better contracts faster.