Measurement and Testing of Oil Sample Clauses

Measurement and Testing of Oil. Each quantity of Oil to be delivered and received hereunder will be gauged or measured both at the custody transfer meter where the Minnesota Pipeline delivers Oil to the CG Tanks and at the Delivery Point by Purchaser, whether as lessor of the CG Tanks or as owner and operator of the Refinery, with daily volumes reported by Purchaser to JPM CCC as soon as practicable on the Day following each Delivery Day. Promptly after the close of each Month, Purchaser shall provide JPM CCC with a report summarizing for such Month all receipts and deliveries of JPM CCC’s Oil into and out of the CG Tanks, the dates of each receipt, the beginning storage inventory and the ending inventory (provided that, at JPM CCC’s request, Purchaser shall provide such reports on a more frequent basis). The book inventory shall be established based on such reports and such book inventory shall be adjusted to match the physical inventory established in accordance with the inspections permitted under Section 4.9 of the CG Tanks Lease Agreement, and all resulting gains or losses (including any losses due to evaporation, line losses and/or shrinkage under the CG Tanks Lease Agreement, calculated based on the Contract Value for the affected quantity, except that the date on which such amount would otherwise be due, and the price discounted, using LIBOR interest rates, to such re-determined date, shall each be determined by JPM CCC in a commercially reasonable manner) shall be for the account of Purchaser and shall be added to the Monthly Invoice in Section 3.2.
AutoNDA by SimpleDocs

Related to Measurement and Testing of Oil

  • Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester.

  • MEASUREMENT AND VERIFICATION The goal of this task is to report the benefits resulting from this project. Project team may use in- house expertise of the project demonstration site or use third party vendor for measurement and verification (M&V) of GHG and energy consumption reduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9 • Coordinate site visits with the M&V subcontractor at the demonstration sites • Develop M&V protocol for pre-installation measurement (and calculation): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include but not be limited to: o Description of the monitoring equipment and instrumentation which will be used. o Description of the key input parameters and output metrics which will be measured. o Description of the M&V protocol and analysis methods to be employed. o Description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified  Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for each demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare a CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting #2.

  • Performance Tests Contractor shall perform Performance Tests in accordance with Section 11.2 of the Agreement and Attachment S.

  • Measurement and Billing The Parties shall measure Interconnection in accordance with this Section 4.6 and xxxx in accordance with Article XXVII and this Section 4.6.

  • Benchmarks for Measuring Accessibility For the purposes of this Agreement, the accessibility of online content and functionality will be measured according to the W3C’s Web Content Accessibility Guidelines (WCAG) 2.0 Level AA and the Web Accessibility Initiative Accessible Rich Internet Applications Suite (WAI-ARIA) 1.0 for web content, which are incorporated by reference. Adherence to these accessible technology standards is one way to ensure compliance with the College’s underlying legal obligations to ensure that people with disabilities are able to acquire the same information, engage in the same interactions, and enjoy the same benefits and services within the same timeframe as their nondisabled peers, with substantially equivalent ease of use; that they are not excluded from participation in, denied the benefits of, or otherwise subjected to discrimination in any College programs, services, and activities delivered online, as required by Section 504 and the ADA and their implementing regulations; and that they receive effective communication of the College’s programs, services, and activities delivered online.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Inspection and Testing Each Constructing Entity shall cause inspection and testing of the Interconnection Facilities that it constructs in accordance with the provisions of this section. The Construction Parties acknowledge and agree that inspection and testing of facilities may be undertaken as facilities are completed and need not await completion of all of the facilities that a Constructing Entity is building.

  • Audit and Testing 4.1 The Contractor shall conduct tests of the processes and countermeasures contained in the Security Plan ("Security Tests") on an annual basis or as otherwise agreed by the Parties. The date, timing, content and conduct of such Security Tests shall be agreed in advance with the Authority.

  • Usage Measurement Usage measurement for calls shall begin when answer supervision or equivalent Signaling System 7 (SS7) message is received from the terminating office and shall end at the time of call disconnect by the calling or called subscriber, whichever occurs first.

  • Meter Testing Company shall provide at least twenty-four (24) hours' notice to Seller prior to any test it may perform on the revenue meters or metering equipment. Seller shall have the right to have a representative present during each such test. Seller may request, and Company shall perform, if requested, tests in addition to the every fifth-year test and Seller shall pay the cost of such tests. Company may, in its sole discretion, perform tests in addition to the fifth year test and Company shall pay the cost of such tests. If any of the revenue meters or metering equipment is found to be inaccurate at any time, as determined by testing in accordance with this Section 10.2 (Meter Testing), Company shall promptly cause such equipment to be made accurate, and the period of inaccuracy, as well as an estimate for correct meter readings, shall be determined in accordance with Section 10.3 (Corrections).