Loading of LNG Tankers Sample Clauses

Loading of LNG Tankers. 7.9.1 Except as otherwise specifically provided, the terms of this Section 7.9 shall apply to all LNG Tankers calling at the Driftwood LNG Terminal.
AutoNDA by SimpleDocs
Loading of LNG Tankers. 5.1 Except as otherwise specifically provided, the terms of this Paragraph 5 shall apply to all LNG Tankers calling at the Corpus Christi Facility (or Alternate Production Facility, as applicable).
Loading of LNG Tankers. 7.9.1 Except as otherwise specifically provided, the terms of this Section 7.9 shall apply to all LNG Tankers calling at the Corpus Christi Facility.

Related to Loading of LNG Tankers

  • Loading RPMG shall schedule the loading and shipping of all outbound corn oil purchased hereunder, but all labor and equipment necessary to load trucks and rail cars and other associated costs shall be supplied and borne by Producer without charge to RPMG. Producer shall handle the corn oil in a good and workmanlike manner in accordance with RPMG’s written requirements and normal industry practice. Producer shall maintain the truck and rail loading facilities in safe operating condition in accordance with normal industry standards and shall visually inspect all trucks and rail cars to assure (i) cleanliness so as to avoid contamination, and (ii) that such trucks and railcars are in a condition suitable for transporting the corn oil. RPMG and RPMG’s agents shall have adequate access to the Ethanol Facility to load Producer’s corn oil on an industry standard basis that allows RPMG to economically market Producer’s corn oil. RPMG’s employees shall follow all reasonable safety rules and procedures promulgated by Producer and provided to RPMG reasonably in advance and in writing. Producer shall supply product description tags, certificates of analysis, bills of lading and/or material safety data sheets that are applicable to all shipments. In the event that Producer fails to provide the labor, equipment and facilities necessary to meet RPMG’s loading schedule, Producer shall be responsible for all costs and expenses, including without limitation actual demurrage and wait time, incurred by RPMG resulting from or arising in connection with Producer’s failure to do so.

  • Floor Loading Floor loading capacity shall be within building design capacity. Tenant may exceed floor loading capacity with Landlord’s consent, at Landlord’s sole discretion and must, at Tenant’s sole cost and expense, reinforce the floor as required for such excess loading.

  • Delivery Point Once Manufacture of the Products has been completed, Contractor shall be responsible for delivering the Finished Goods FCA, (as defined in Incoterms (2000) published by the International Chamber of Commerce) and to a freight forwarder specified by Company in its Order, or otherwise approved by Company. “Delivery Point” as used in this Agreement shall mean the specific time and location that the Product is delivered to the shipper specified on the Order.

  • Delivery Points The measurement of and tests for quality of Shipper's Gas redelivered at the Delivery Points shall be governed by and determined in accordance with the requirements of the receiving pipeline at each Delivery Point.

  • Vessels Each Vessel is

  • Delivery Location The Aircraft shall be located at the agreed Delivery Location;

  • Mission Block Fuel The block fuel for a stage length of 2,050 nautical miles in still air (representative of a route with a 4.4 hour flight time from a sea level airport) with a zero fuel weight of 154,221 kilograms, using the conditions and operating rules defined below, shall not be more than the following guarantee value: NOMINAL: [*] Kilograms TOLERANCE: [*] Kilograms GUARANTEE: [*] Kilograms Conditions and operating rules:

  • STORAGE TANKS AND SUMPS 3.1 Is any above or below ground storage of gasoline, diesel, petroleum, or other Hazardous Materials in tanks or sumps proposed in, on or about the Premises? Existing Tenants should describe any such actual or proposed activities. Yes [ ] No [ ] If yes, please explain:

  • Delivery Pressure Seller shall be required to deliver or cause delivery of the Gas to the Point of Delivery and for delivering such Gas at a pressure sufficient to effect such delivery. Notwithstanding anything to the contrary herein, Seller shall have the right but not the obligation to install compression to effect deliveries of Gas hereunder.

  • Metering 1. If the Producer desires to sell electric power to the Company, the Company shall provide, own and maintain at the Producer's expense all necessary meters and associated equipment to be utilized for the measurement of energy and capacity for determining the Company's payment to the Producer pursuant to an applicable agreement.

Time is Money Join Law Insider Premium to draft better contracts faster.