Line 8 Protection Packages Sample Clauses

Line 8 Protection Packages. The existing Line 8 relays cannot be reset to accommodate interconnection of the Small Generating Facility and must be replaced. The new Line 8 protection packages will both be step distance schemes. The ‘A’ package will use an LPRO 4000 and the ‘B’ package will use an SEL 311C. Interconnection of the Small Generating Facility will require the addition of DTT transmit and receive to the Xxxxx Solar Collector Substation. A new GARD 8000 shall be installed for communication with the Xxxxx Solar Collector Substation. DTT will be sent to the Xxxxx Solar Collector Substation for a line relay operation or R8 breaker failure. DTT for breaker failure will be received from Xxxxx Solar Collector Substation. A SEL 351-6 relay will be added for DTT receive supervision and will be used to trip and drive reclosing to lockout. The ACR reclosing relay shall be replaced with a SEL 351-6 to allow for the addition of drive-to- lockout (“DTL”) for DTT receive. (Note: Due to the addition of the Small Generating Facility, an area coordination study will be completed during final engineering and may result in resetting of relays in the area. The Interconnection Customer shall be responsible for all costs associated with this.)
AutoNDA by SimpleDocs
Line 8 Protection Packages. The existing Line 8 protection packages are obsolete and shall be replaced to accommodate the interconnection of the Small Generating Facility. The ‘A’ package shall be step distance using an ERL Phase LPRO, and the ‘B’ package will be a step distance scheme using a SEL-311C. The line relays will trip the R20 and R50 breakers and initiate breaker failure. The ‘A’ package will also be used for DTT receive supervision and drive the reclosing of R20 and R50 to lockout. The R20 and R50 breaker failure and reclosing relays associated with Line 8 will be replaced with SEL-351 relays. DTT transmit to the Xxxxxxx Road Collector Substation will be added for a line relay operation, R20 or R50 breaker failure, and if both R20 and R50 are open. Additional channels available on the RFL GARD 8000s shall be used for this protection scheme.

Related to Line 8 Protection Packages

  • PICKET LINE PROTECTION 1. All employees covered under this Agreement have the right to refuse to cross or work behind a picket line unless same is declared illegal by the Labour Relations Board.

  • Xxxx Protection 22.1With respect to the Parties' rights and obligations under this Framework Agreement, the Parties agree that the Authority is the Data Controller and that the Supplier is the Data Processor.

  • Job Protection 15.9.1 Subject to 15.10 below, an employee returning from parental leave is entitled to resume work in the same position or a similar position to the one they occupied at the time of commencing parental leave. A similar position means a position:

  • System Protection To prevent compromise of systems which contain DSHS Data or through which that Data passes:

  • Prescription and Over-the-Counter Medications Employees taking physician-prescribed or over-the-counter medications, if there is a substantial likelihood that such medication will affect job safety, must notify their supervisor or other designated official of the fact that they are taking a medication and the side effects of the medication.

Time is Money Join Law Insider Premium to draft better contracts faster.