Xxxxxxx Road Sample Clauses

Xxxxxxx Road. Design four (4) lanes and construct two (2) contiguous lanes of Xxxxxxx Road as an offset roadway from the MPUD's western boundary to the MPUD's eastern boundary. The Developer shall be entitled to design and construct Xxxxxxx Road in increments in connection with the ongoing development of the MPUD, the length of such increments to be determined by the County as necessary to serve adjacent parcels within the MPUD at the time of preliminary/construction plan approval, but in any event the Developer shall complete the design and construction of the entirety of Xxxxxxx Road within the MPUD within eighteen (18) months from the date when the construction of Xxxxxxx Road is completed to the western boundary or eastern boundary of the MPUD. In that regard, the Developer shall be entitled to construct Xxxxxxx Road in increments in connection with the ongoing development of the MPUD. In the event that one thousand (1,000) residential units located north of S.R. 56 have been platted within the MPUD and the design and construction of Xxxxxxx Road has not been completed, then Developer shall be required to post Security in an amount equal to 125% of the Cost Estimate for completing construction of the portion of the roadway not yet completed. Such Security shall be maintained in full force and effect until Xxxxxxx Road is completed within the MPUD.
AutoNDA by SimpleDocs
Xxxxxxx Road. Developer shall dedicate to the County 142 feet in width of right-of- way for Xxxxxxx Road from the western boundary of the MPUD to the eastern boundary of the MPUD. Such Dedication shall occur in increments as determined by the County to be necessary to serve adjacent parcels within the MPUD at the time of preliminary/construction plan approval, and in any event upon completion of the construction obligation set forth in Paragraph 5.c., below or within ninety (90) days of the request of the County, whichever is earlier.
Xxxxxxx Road. Project to begin at the existing sanitary manhole located approximately 900 feet west from the centerline of Broadview Road located in the City of Parma and to end at the existing sanitary manhole located approximately 175 feet west from the centerline of Xxxxxx Road in the City of North Royalton.
Xxxxxxx Road. Xxxx Beach, CA 90807 _________________________ The technical focal point at Boeing is: _______________________ The technical focal point at __________________. is: ______________________ A party may change its address or designee by written notice to the other party.
Xxxxxxx Road. Approximately 1.4 miles • Job will include: drainage, paving and installation of shoulders and surface treatment. • $175.000.00
Xxxxxxx Road. A. The geometric configuration, lane direction and vehicle turning movement requirements along Xxxxxxx Road shall be as shown on Figures 5-1A-9 and 5-1A-10 of Appendix 5-1A [Project Description Drawings] in Part 1 [General] of this Schedule.
Xxxxxxx Road. I. The City has determined that further high quality development of the Property consistent with appropriate protections of natural resources will be of substantial economic benefit to the City and its citizens; and J. Section 166.021 (b) and (c), Florida Statutes, specifically states, with regard to economic development, that:
AutoNDA by SimpleDocs
Xxxxxxx Road. Art 103- Art Appreciation 3.0 Credit Hours Biology 114- General Education Biology 4.0 Credit Hours English 101- Composition I* 3.0 Credit Hours
Xxxxxxx Road. The Developer has dedicated up to 140 feet of right-of-way for the Xxxxxxx Road Extension within 180 days of the County’s written request. The Developer shall be given a credit in Phase II or subsequent phases against its transportation impact fees and/or proportionate share contribution (or similar exaction) to the extent that its right-of-way contribution exceeds 120 feet, if such credits are authorized pursuant to Pasco County ordinance. Unless otherwise approved by the Development Review Committee, the Developer shall complete construction of the first two (2) lanes of Xxxxxxx Road within the Project prior to the first of the following to occur: a) as necessary to serve adjacent development; or b) prior to December 31, 2013; or c) within one (1) year of Xxxxxxx Road being built to the western boundary of the Project.
Xxxxxxx Road. The segment of Xxxxxxx Road from Xxxxxx Road extending along the Project boundary shall be constructed/improved to COUNTY standards as a two (2) lane road. The DEVELOPER shall provide sufficient right-of-way to total 135 feet of right-of-way for Xxxxxxx Road. Construction of Xxxxxxx Road shall be completed and accepted by the COUNTY for maintenance as necessary to serve adjacent or nearby development within the Project as determined by the COUNTY.
Time is Money Join Law Insider Premium to draft better contracts faster.