Interconnection of Third Party Facilities to Municipal System. Municipal will provide advance written notice to National Grid prior to the proposed interconnection to the Municipal System of any: (1) new Generator ; (2) 10% increase or more in the capacity of an existing Generator connected to the Municipal System ; or (3) peak load increases of 10% or greater over the peak load stated in Exhibit A. Such written notice shall be provided within 30 Calendar Days of Municipal receiving an interconnection or service request or notice of a proposed increase in Generator capacity. National Grid or the NYISO, as applicable, will have the right to perform an interconnection study in order to determine the extent of the impact of the proposed interconnection or increase in Generator capacity on the National Grid Transmission System. National Grid or the NYISO shall perform any such studies pursuant to any applicable NYISO requirements. If upgrades to the National Grid Transmission System are required as a result of the proposed interconnection or increase in Generator capacity, such upgrades will be performed by National Grid or a third party designated by National Grid at the expense of either the Municipal, the owner of the Generator, or the owner of the load connecting to the Municipal System. Municipal, the owner of the Generator, or the owner of the load connecting to the Municipal System shall reimburse National Grid for all actual costs and expenses of constructing, operating, and maintaining the upgrades.
AutoNDA by SimpleDocs
Interconnection of Third Party Facilities to Municipal System. 5.4.1 Municipal will provide advance written notice to National Grid prior to the proposed interconnection to the Municipal System of any: (1) new Generator ; (2) 10% increase or more in the capacity of an existing Generator connected to the Municipal System ; or (3) peak load increases of 10% or greater over the peak load stated in Exhibit A. Such written notice shall be provided within 30 Calendar Days of Municipal receiving an interconnection or service request or notice of a proposed increase in Generator capacity.

Related to Interconnection of Third Party Facilities to Municipal System

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Developer Attachment Facilities Developer shall design, procure, construct, install, own and/or control the Developer Attachment Facilities described in Appendix A hereto, at its sole expense.

  • Interconnection Customer Interconnection Facilities Interconnection Customer shall design, procure, construct, install, own and/or control Interconnection Customer Interconnection Facilities described in Appendix A, Interconnection Facilities, Network Upgrades and Distribution Upgrades, at its sole expense.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner.

  • Verizon OSS Facilities Any gateways, interfaces, databases, facilities, equipment, software, or systems, used by Verizon to provide Verizon OSS Services to Reconex.