Glazed Aluminum Curtain Walls and Glazing Systems Sample Clauses

Glazed Aluminum Curtain Walls and Glazing Systems. A. Glazed curtain wall systems (storefronts and entrances) shall comply with the requirements of the American Architectural Manufacturers Association (AAMA) Aluminum Curtain Wall Design Guide Manual and the AAMA Installation of Aluminum Curtain Walls and Aluminum Storefront and Entrance Manual.
AutoNDA by SimpleDocs

Related to Glazed Aluminum Curtain Walls and Glazing Systems

  • Glazing All new and replacement exterior windows shall have sealed, low emmissivity, insulating glass units which are manufactured by members of SIGMA and IGCC. Sealed insulating glass shall meet ASTM E774, class B. Glass shall be hermetically dual sealed, inert gas filled, double pane units with exterior 3/16” bronze float glass (IoE second surface), ½” air space, and interior 3/16” clear float glass. Insulated panels, if used, shall be 1” laminated panels equal to Xxxxx Industries architectural panels with a porcelain fused-on finish. Wired or clear fire-rated glass shall be UL approved. Safety glass shall be tempered or laminated, and shall meet ANSI 297.1 standard.

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

  • Glass Or Safety Glazing Material a. We cover:

  • Metalwork Section 2

  • Carpet Cleaning Shampooing carpets with the deep dirt extraction (steam cleaning) method per manufactures recommendations.

  • Windows a. Front and rear windshield per California Vehicle Code § 26710.

  • Filing Systems and Equipment A complete and comprehensive catalog of filing systems including vertical and lateral files, bookcases, mobile cabinets and freestanding file cabinets.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Exterior and interior functional areas and spaces of the Project, with technical and equipment requirements on each;

  • Exterior Drainage Does water stand on the property for more than 24 hours after a heavy rain? Yes No Unknown Comments Are gutters and downspouts in good repair? Yes No Unknown Comments:

Time is Money Join Law Insider Premium to draft better contracts faster.