Footing Subgrade Sample Clauses

Footing Subgrade. At footing subgrades, at least one test of each soil stratum will be performed to verify design bearing capacities. Subsequent verification and approval of other footing subgrades may be based on a visual comparison of subgrade with tested subgrade when approved by Engineer.
AutoNDA by SimpleDocs

Related to Footing Subgrade

  • Subgrade Top surface of Roadbed upon which Base Course or Surface Course is constructed. For roads without Base Course or Surface Course, that portion of Roadbed prepared as the finished wearing surface.

  • Work Area The specific work area and/or crew an employee reports to on a daily schedule. Work areas are generally smaller divisions of a larger Bid Area.

  • Built-up Area The built-up area for the Designated Apartment or any other Unit shall mean the Carpet Area of such Unit and Balcony area and 50% (fifty percent) of the area covered by those external walls which are common between such Unit/Balcony and any other Unit/Balcony and the area covered by all other external walls of the such Unit/Balcony.

  • Excavation If any excavation shall be made upon land adjacent to or under the Building, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter the Premises for the purpose of performing such work as said person shall deem necessary or desirable to preserve and protect the Building from injury or damage and to support the same by proper foundations, without any claim for damages or liability against Landlord and without reducing or otherwise affecting Tenant’s obligations under this Lease.

  • Grading The coarse aggregate as delivered to the mixer, shall be well graded as per IS specifications. Maximum size of aggregate used for the work shall be 20mm or 40mm or as specified in items in the bill of quantities and it shall confirm to IS: 383-1970, clause 4.2 (Table-2) However, the exact gradation required to produce a dense concrete of specified strength and desired workability shall be decided as per laboratory test by the Engineer. Coarse aggregate for use in concrete shall be well graded and shall conform to IS: 383-1970 requirements (as per Table-II) given below: IS sieve Designation Percentage Passing by weight for graded aggregate of nominal size. 40mm 20mm 16mm 12.5mm 63mm 100 - - - 40mm 00-000 000 - - 20mm 00-00 00-000 100 - 16mm - - 00-000 000 12.5 - - - 90-100 10.00 00-00 00-00 00-00 00-00 4.75mm 0-5 0-10 0-10 0-10

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

  • Common Area (Check one)

  • PAVING Provide a standard bubble map, as part of the plans, showing locations of numbered points, and a table with point number, northing and easting coordinates, description, and BL station for each point, for the following: ▪ all platted control irons (set or not), including plat boundary irons, for the entire sub-division, not just the current phase ▪ benchmarks, including TBM set with preliminary survey In addition to the required coordinate information, the following shall be included in all plans, at a minimum, as needed for construction staking on all City projects. ▪ Include copy of plat(s) on all plans, as relevant and approved by the Design Engineer ▪ Benchmarks – minimum of two City standards, four total desirable; as close to project as possible, even if TBM set with preliminary survey. ▪ Benchmark elevations must be in the same datum as the design (i.e. NAV 88 design needs NAV 88 benchmarks, not NAV 29) ▪ All control irons/identified property irons shall be shown on plans, with BL stationing and offset ▪ Show deflection angles in BL, and/or bearing/azimuth of BL sections ▪ Arterial project side streets – provide BL station at CL of intersection of the two streets, on the BL; BL station and offset to CL of side street at removal limits; include deflection angle from BL to CL of side street ▪ Existing FL/pavement grades shown at all match points ▪ Top of curb grades and stationing at all ends-of-return and horizontal/vertical P.I.’s, not just even stationing ▪ CL top of pavement grades for arterial ▪ CL elevation for streets on mass grading work @ 100’ Sta in tangent sections and 50’ on curves.

  • Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:

  • Outdoor Lighting 3.8.1 Lighting shall be directed to driveways, parking areas, loading area, building entrances and walkways and shall be arranged so as to divert the light away from streets, adjacent lots and buildings.