Field Test Evaluation and Validation Sample Clauses

Field Test Evaluation and Validation. Before Contractor accepts an EV charging station as operationally complete in accordance with the requirements of this Contract, and open for public charging services, Contractor shall conduct field tests of the charging equipment and networking functionality. Contractor shall prepare a checklist of all equipment functions to test and validate safe and functional operations. ODOT will provide final approval of all charging stations before commissioning. Deliverables: Report, providing results of field tests and any supporting documentation that prove the site is functional and ready to commence public charging services. Provide the completed checklist showing all functions tested and validated. Schedule: TBD at time of Contract negotiations.
AutoNDA by SimpleDocs

Related to Field Test Evaluation and Validation

  • Evaluation, Testing, and Monitoring 1. The System Agency may review, test, evaluate and monitor Grantee’s Products and services, as well as associated documentation and technical support for compliance with the Accessibility Standards. Review, testing, evaluation and monitoring may be conducted before and after the award of a contract. Testing and monitoring may include user acceptance testing. Neither the review, testing (including acceptance testing), evaluation or monitoring of any Product or service, nor the absence of review, testing, evaluation or monitoring, will result in a waiver of the State’s right to contest the Grantee’s assertion of compliance with the Accessibility Standards.

  • Inspection and Testing Each Constructing Entity shall cause inspection and testing of the Interconnection Facilities that it constructs in accordance with the provisions of this section. The Construction Parties acknowledge and agree that inspection and testing of facilities may be undertaken as facilities are completed and need not await completion of all of the facilities that a Constructing Entity is building.

  • Search, Enquiry, Investigation, Examination And Verification a. The Property is sold on an “as is where is basis” subject to all the necessary inspection, search (including but not limited to the status of title), enquiry (including but not limited to the terms of consent to transfer and/or assignment and outstanding charges), investigation, examination and verification of which the Purchaser is already advised to conduct prior to the auction and which the Purchaser warrants to the Assignee has been conducted by the Purchaser’s independent legal advisors at the time of execution of the Memorandum.

  • Joint Network Implementation and Grooming Process Upon request of either Party, the Parties shall jointly develop an implementation and grooming process (the “Joint Grooming Process” or “Joint Process”) which may define and detail, inter alia:

  • Project Monitoring Reporting and Evaluation The Recipient shall furnish to the Association each Project Report not later than forty-five (45) days after the end of each calendar semester, covering the calendar semester.

  • Inspections and Testing Each Interconnected Entity shall perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Customer Facility with the Transmission System in a safe and reliable manner. Each Interconnected Entity shall have the right, upon advance written notice, to request reasonable additional testing of an Interconnected Entity’s facilities for good cause, as may be in accordance with Good Utility Practice.

  • Inspection and Tests 3.8.1 The Procuring entity or its representative shall have the right to inspect and/or to test the goods to confirm their conformity to the Contract specifications. The Procuring entity shall notify the tenderer in writing in a timely manner, of the identity of any representatives retained for these purposes.

  • Maintenance and Testing 54.5.1. Sprint is only responsible for maintaining the facilities that it owns.

  • MEASUREMENT AND VERIFICATION The goal of this task is to report the benefits resulting from this project. Project team may use in- house expertise of the project demonstration site or use third party vendor for measurement and verification (M&V) of GHG and energy consumption reduction. The Recipient shall: • Enter into agreement with M&V subcontractor per Task 1.9 (if using outside vendor) • Coordinate site visits with the M&V subcontractor at the demonstration site(s) • Develop M&V protocol for pre-installation measurement (and calculations) following Section II.B.2 of the grant solicitation manual3: o Electric, natural gas and/or other fossil fuel consumption and greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are be upgraded and/or replaced and/or modified; and o If necessary, ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include but not be limited to: o A description of the monitoring equipment and instrumentation which will be used; o A description of the key input parameters and output metrics which will be measured; o A description of the M&V protocol and analysis methods to be employed; and o A description of the independent, third-party measurement and verification services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified.  Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. 3 GFO-18-903, Food Production Investment Program, California Energy Commission, November 2018. xxxxx://xxx.xxxxxx.xx.xxx/contracts/GFO-18-903/000_FPIP_Solicitation_Manual.docx • Prepare and provide a Post-installation M&V Findings Report that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project.

  • LIMITATIONS ON REVERSE ENGINEERING, DECOMPILATION AND DISASSEMBLY You may not reverse engineer, decompile, or disassemble the Software, except and only to the extent that such activity is expressly permitted by applicable law notwithstanding this limitation.