EVENT FACILITIES Event Floor Sample Clauses

EVENT FACILITIES Event Floor. The Event Floor will be designed to accommodate a range of events, including basketball, hockey, arena football, volleyball, end-stage/center-stage concerts, and trade shows. Floor finish will be sealed concrete. • The ice rink will be 85' x 200', with operational inserts that reflect standard requirements for family shows and mixed programming. • The arena football field will be 85' x 198'. • Basketball will be played on a portable floor, 60' x 112' in size. • The portable stage will be 60' deep x 80' wide, with 12' x 12' sound wings at the downstage corners. Space for player benches and officials’ boxes will be provided as follows: • Hockey players benches: 2 • Arena Football players benches: 2 • Penalty benches: 2 • Penalty timekeeper bench: 1 The event floor will be designed to support a load of 350 pounds per square foot, with ice making capabilities. The floor will be designed to support the “HS” rating for over the road vehicles. Threaded inserts will be located in the floor in a grid pattern to accommodate a variety of events. Provisions will also be made for water, drainage, electrical power, PA and broadcast needs. Rigging / Scoreboard / Spotlights Accommodations to create a scalable, reduced-house venue for shows and concerts will be provided, including rigging, sound systems, and aisle lighting. The roof system will be designed to support a curtaining system that divides the seating bowl transversely, with curtains extending from near the roof structure to the event floor. An arena reduction system will also be designed and included in the arena. The dual center-hung scoreboards will be an all-electronic LED system cDRAFT onsisting of a minimum six, 16:9 aspect ratio video boards with live action, instant replay, game scoring information, fixed and electronic advertising, naming rights sponsor identification (if required) and messaging. The hoisting system will be designed to maximize the stored height of the scoreboard. Two (2) levels of LED boards will be provided on the fascia of the interior seating bowl. These LED boards shall serve as the guardrail. Sightlines for the facility will be designed for fascia displays to be surface mounted on the pre-cast risers and for the displays to be a minimum of 32 inches high. Auxiliary boards will be provided within the seating bowl to provide scoring and game in progress information (if this data is not shown on the fascia displays). Game clocks and other requested scoring information will be placed i...
AutoNDA by SimpleDocs
EVENT FACILITIES Event Floor. The Event Floor will be designed to accommodate a range of events, including basketball, hockey, arena football, volleyball, end-stage/center-stage concerts, and trade shows. Floor finish will be sealed concrete. • The ice rink will be 85' x 200', with operational inserts that reflect standard requirements for family shows and mixed programming. • The arena football field will be 85' x 198'. • Basketball will be played on a portable floor, 60' x 112' in size. • The portable stage will be 60' deep x 80' wide, with 12' x 12' sound wings at the downstage corners. Space for player benches and officials’ boxes will be provided as follows: • Hockey players benches: 2 • Arena Football players benches: 2 • Penalty benches: 2 • Penalty timekeeper bench: 1 • The event floor will be designed to support a load of 350 pounds per square foot, with ice making capabilities. The floor will be designed to support the “HS” rating for over the road vehicles. Threaded inserts will be located in the floor in a grid pattern to accommodate a variety of events. Provisions will also be made for water, drainage, electrical power, PA and broadcast needs.

Related to EVENT FACILITIES Event Floor

  • Default Events (a) Any material breach of the Funding Agreement by the Recipient, including those set out below, will be an event of default (“Default Event”):

  • H DEFAULT, DISRUPTION AND TERMINATION H1 Termination on insolvency and change of control H1.1 The Client may terminate the Contract with immediate effect by notice in writing where the Contractor is a company and in respect of the Contractor:

  • Early Construction of Base Case Facilities Developer may request Connecting Transmission Owner to construct, and Connecting Transmission Owner shall construct, subject to a binding cost allocation agreement reached in accordance with Attachment S to the ISO OATT, including Section 25.8.7 thereof, using Reasonable Efforts to accommodate Developer’s In-Service Date, all or any portion of any System Upgrade Facilities or System Deliverability Upgrades required for Developer to be interconnected to the New York State Transmission System which are included in the Base Case of the Class Year Study for the Developer, and which also are required to be constructed for another Developer, but where such construction is not scheduled to be completed in time to achieve Developer’s In-Service Date.

  • Market Disruption Event Section 6.3(a) of the Equity Definitions is hereby replaced in its entirety by the following:

  • Additional Event of Suspension Section 4.01. Pursuant to Section 6.02 (l) of the General Conditions, the following additional event is specified, namely, that a situation has arisen which shall make it improbable that the Program, or a significant part thereof, will be carried out.

  • Developer Event of Default Any of the following events shall constitute an event of default by the Developer ("Developer Event of Default") unless such event has occurred as a result of a Force Majeure Event or the Authority Event of Default or any governmental action for reasons other than any breach, default or lapse on the part of the Developer:

  • Authority Event of Default Any of the following events shall constitute an event of default by the Authority ("Authority Event of Default”), when not caused by a Developer Event of Default:

  • Default, Disruption and Termination H1 Termination on Change of Control and Insolvency H2 Termination on Default H3 Break H4 Consequences of Termination H5 Disruption H6 Recovery upon Termination H7 Force Majeure

  • Default Events and Termination 18.1 Each of the following circumstances shall constitute a General Default:

  • ADDITIONAL SPECIAL CONTRACT CONDITIONS A. Special Contract Conditions revisions: the corresponding subsections of the Special Contract Conditions referenced below are replaced in their entirety with the following:

Time is Money Join Law Insider Premium to draft better contracts faster.